NRC-02-0007, Submittal of Physical Security Plan (Psp), Revision 39
| ML020370421 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/10/2002 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-02-0007 | |
| Download: ML020370421 (1) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison SA FEG UARDS INFORMATION January 10, 2002 NRC-02-0007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Submittal of Fermi 2 Physical Security Plan (PSP), Revision 39 The purpose of this letter is to submit the Fermi 2 Physical Security Plan (PSP),
Revision 39, in accordance with 1 OCFR50.54(p)(2).
Chapters 2, 3, Figure 2-9, the Table of Contents, and the List of Tables/Figures are being submitted. A summary of the changes made in the PSP, Revision 39, is also provided. Additionally, changes to the text are highlighted (
). Deleted text is not identified with markings. The changes made under this revision do not decrease the overall effectiveness of the PSP.
Should you have any questions or require additional information, please contact Mr.
Joseph H. Korte, Manager-Nuclear Security at (734) 586-1095.
Sinc 7
r!%
0 orman K. Peterson Manager - Nuclear Licensing Enclosures cc:
J. R. Creed (2 copies w/Enclosures)
T. J. Kim (w/o Enclosures)
NRC Resident Office (w/o Enclosures)
Regional Administrator, Region III (w/o Enclosures)
USNRC Document Control Desk (3 copies w/original) 4 When separated from enclosures, handle this page as decontrolled SAFEGUARDS INFORMATION A DTE Energy Company