NOC-AE-17003476, Operator Licensing Examination Schedule
| ML17122A357 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/02/2017 |
| From: | Janak G South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-17003476, RIS-17-003 | |
| Download: ML17122A357 (3) | |
Text
South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, Texas 77483 May 2, 2017 NOC-AE-17003476 File No. G30 10CFR55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units 1and2 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule
Reference:
NRC Regulatory Issue Summary (RIS) 2017-03 STP Nuclear Operating Company is submitting the attached response to RIS 2017-03.
There are no commitments in this letter.
If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604. .
-f~r Gregory W. Janak Manager, Operations Training mk
Attachment:
NRC Form 536 STI: 34490914
NOC-AE-17003476 Page 2 of 2 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV Morgan. Lewis & Beckius LLP U.S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Paul Bessette Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Senior Project Manager Jennifer Bridges U.S. Nuclear Regulatory Commission Kelly Clayton One White Flint North (08H04) 11555 Rockville Pike NRG South Texas LP Rockville, MD 20852 Mark Walker Jim von Suski!
NRC Resident Inspector Skip Zahn U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 CPS Energy Wadsworth, TX 77483 Kevin Pollo Cris Eugster L. D. Blaylock City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
Estimated burden per response to comply with this volunlal)I Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~~CJ ?"""""'>fl"-~ information collection Is used to plan budgets and resources for operator examinations. Send
!ti ~
OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatol)I Commission, Washington, DC20555-0001, or by e-mail to i cl' EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatol)I Affairs,
- ."'~ ~Q.f? NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means
><*01<¥ used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION SOUTH TEXAS PROJECT IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE
-* PROPOSED NUMBER CY2019 CY2020 CY2021
- CY2022 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2019 CY2020 CY2021
-- CY2022 NUMBER OF REACTOR OPERATORS 6 8 17 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 4 4 9 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 3 0 6 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 7/15/19 7/13/20 7/12/21 7/25/22 ALTERNATE DATE 8/5/19 8/3/20 8/2/21 8/15/22
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY
- SEPTEMBER MARCH CY
-- SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (05-2016)