NOC-AE-16003393, Operator Licensing Examination Schedule

From kanterella
Jump to navigation Jump to search
Operator Licensing Examination Schedule
ML16201A234
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/13/2016
From: Janak G
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-16003393, RIS-16-009, STI: 34344390
Download: ML16201A234 (3)


Text

,, i

\

~ .....

Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 . Wadsworth, TeKas 77483 July 13, 2016 NOC-AE-16003393 File No. G30 10CFR55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units 1and2 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule

Reference:

NRC Regulatory Issue Summary (RIS) 2016-09 STP Nuclear Operating Company is submitting the attached response to RIS 2016-09.

There are no commitments in this letter.

If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604.

Gregory W. Janak Manager, Operations Training mk ~rC.\k,..,,k

Attachment:

NRC Form 536 STI: 34344390

NOC-AE-16003393 Page 2 of 2 cc:

Regional Administrator, Region IV (electronic copy w/o attachments)

U. S. Nuclear Regulatory Commission, 1600 East Lamar Boulevard Morgan. Lewis & Beckius LLP Arlington, TX 76011-4511 Steve Frantz, Esquire Lisa M. Regner U.S. Nuclear Regulatory Commission Senior Project Manager Lisa M. Regner U.S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike NRG South Texas LP Rockville, MD 20852 Chris O'Hara Jim van Suski!

Skip Zahn NRC Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 CPS Energy Wadsworth, TX 77483 Kevin Pollo Cris Eugster L. D. Blaylock Crain Caton & James. P.C.

Peter Nemeth City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~RREO(I(

.;)t; ..,, information collection is used to plan budgets and resources for operator examinations. Send tit~  %. OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 l\; ~ F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

\ ..Q "'

NEOB-10202, (3150-0131), Office of Management and Budgei Washington, DC 20503. If a means

'*'****ti: used to impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRG REGION SOUTH TEXAS PROJECT IV*

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 1 7 NIA 5 NUMBER OF SENIOR REACTOR OPERATOR~ - INSTANT 15 6 NIA 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 5 NIA 4 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED NIA NIA NIA NIA PROPOSED DATES PRIMARY DATE 9124118 10/7/19 NIA 1014121 ALTERNATE DATE 10122118 10128/19 NIA 10125121
c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2017 SEPTEMBER MARCH CY 2018

- SEPTEMBER ESTIMATED NUMBER OF 16 0 13 0 CANDIDATES NRC FORM 536 (05-2016)