Follow-Up Response to Inspection Report No. 05000498; 499/2012404 Regarding Non-Cited Violation No. 05000498; 499/2012404-01
ML12313A006
Person / Time
Site: South Texas  
Issue date: 10/30/2012
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IR-12-404, NOC-AE-12002916, STI: 33611754, G25
Download: ML12313A006 (2)


Text

Nuclear Operating Company South Texas Project Electric GeneratingStation P.O Box 289 Wadsworth, Texas 77483 ,

October 30, 2012 NOC-AE-12002916 STI: 33611754 File: G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Follow-up Response to Inspection Report No. 05000498; 499/2012404 Regarding Non-Cited Violation No. 05000498; 499/2012404-01

References:

1. NRC letter dated May 4, 2012, "South Texas Project Electric Generating Station Units 1 and 2 - NRC Security Inspection Report 05000498/2012404 and 05000499/2012404"
2. Letter dated June 27, 2012 from D. W. Rencurrel to NRC Document Control Desk, "Response to Inspection Report No. 05000498; 499/2012404 Regarding Non-Cited Violation No. 05000498; 499/2012404-01" (NOC-AE-1 2002875)

By Reference 2, STP Nuclear Operating Company (STPNOC) provided the Nuclear Regulatory Commission (NRC) information concerning the non-cited violation documented in Reference .1 and requested the NRC review the associated non-cited violation based on the information provided. Subsequently, the NRC staff requested additional information. STPNOC personnel discussed the results of our review of the additional information with the NRC Region IV staff on October 18, 2012 and concluded that the non-cited violation was valid; therefore, no further review of this issue by the NRC staff is requested.

There are no regulatory commitments in this letter.

Should you have any questions regarding this letter, please contact Robyn Savage at (361) 972-7438.

.i VRe ncurrelse Senior Vice President

NOC-AE-12002916 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius, LLP 1600 East Lamar Boulevard Arlington, Texas 76011-4511 Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8B13) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Pena P. 0. Box 289, Mail Code: MN1 16 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Director, Office of Enforcement Richard A. Ratliff U. S. Nuclear Regulatory Commission Alice Rogers Washington, DC 20555-0001 Texas Department of State Health Services Balwant K. Singal U. S. Nuclear Regulatory Commission