NOC-AE-03001485, February 2003 Monthly Operating Report for Southtexas Project Units 1 & 2
| ML030770533 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/13/2003 |
| From: | Mallen F South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-03001485, STI: 31572080 | |
| Download: ML030770533 (14) | |
Text
Nuclear Operating Company Sad T*e Q&£*aiCommpny P08aB2i9 **
dMjrkZm kV774l??
March 13, 2003 NOC-AE-03001485 File No.: G02 10CFR50.71 STI: 31572080 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for February 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for February 2003. If you should have any questions on this matter, please contact R.L.
Hill at (361) 972-7667.
F.H. Mallen Manager, Planning &
Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - February 2003
- 2) STPEGS Unit 2 Monthly Operating Report - February 2003
cc:
(paper copy) (electronic copy)
Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 M. T. Hardt/W. C. Gunst Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom/D. G. Tees Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson/A. C. Bakken III Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT FEBRUARY 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By: .D. _A _ _ _ _,__ _ _ _ _
E.D. HA"PIN Date
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Mar. 5, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1. REPORTING PERIOD: 2/1/03-2/28/03 GROSS HOURS IN REPORTING PERIOD: 672
- 2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 672.0 1,416 99,945.1
- 5. NUMBER OF HOURS REACTOR CRITICAL 0 0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS 672.0 1,4160 98,309.1
- 7. HOURS GENERATOR ON LINE 0 0 0
- 8. UNIT RESERVE SHUTDOWN HOURS 2,564,658 5,404,139 367,354,602
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 863,208 1,816,455 120,032,510
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 100.0 100.0 78.6
- 11. REACTOR SERVICE FACTOR (%)
100 0 1000 78.6
- 12. REACTOR AVAILABILITY FACTOR (%)
1000 1000 77.3
- 13. UNIT SERVICE FACTOR (%)
100.0 100.0 77.3
- 14. UNIT AVAILABILITY FACTOR (%)
102.7 102.6 75 4
- 15. UNIT CAPACITY FACTOR - Using MDC (%)
102.7 102.6 75.4
- 16. UNIT CAPACITY FACTOR - Using DER (%)
0.0 0.0 13.2
- 17. UNIT FORCED OUTAGE RATE (%)
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):
Scheduled 25-day outage to allow scheduled refueling to begin on March 26, 2003.
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT I DATE Mar. 5, 2003 COMPLETED BY R L Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1281 17 1285 2 1285 18 1284 3 1285 19 1284 4 1287 20 1283 5 1286 21 1283 6 1285 22 1286 7 1285 23 1287 8 1285 24 1285 9 1284 25 1285 10 1285 26 1285 11 1283 27 1286 12 1284 28 1286 13 1283 14 1283 15 1282 16 1285
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Mar. 5, 2003 COMPLETED BY R L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Adinumstrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT FEBRUARY 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: &ý -' s//O'T E.D. HALPIN Date
MONTHLY SUMMIARY South Texas Project Unit 2 remained shutdown during the reporting period for repairs on the main turbine/generator rotor train.
OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Mar. 5, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1. REPORTING PERIOD: 2/1/03-2/28/03 GROSS HOURS IN REPORTING PERIOD: 672
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 12506
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR CRITICAL 0.0 80.3 94,638.
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
- 7. HOURS GENERATOR ON LINE 00 65.3 92=7
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 0 155,001 344,568,652
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 0 112,224,344 5._7
- 11. REACTOR SERVICE FACTOR (%) 00 78 8 57
- 12. REACTOR AVAILABILITY FACTOR (%) 00 78 8 4.6
- 13. UNIT SERVICE FACTOR (%) 00 76.9 46
- 14. UNIT AVAILABILITY FACTOR (%) 0.0 76 9
- 15. UNIT CAPACITY FACTOR - Using MDC (%) 0.0 2.6 74 7
- 16. UNIT CAPACITY FACTOR - Using DER (%) 0.0 2.6 74.7
- 17. UNIT FORCED OUTAGE RATE (%) 100.0 95 4 14.6
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 03/13/03
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Mar. 5, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 3 0 19 4 0 20 5 0 21 6 0 22 7 0 23 8 0 24 9 0 25 10 0 26 11 0 27 12 0 28 13 0 14 0 15 0 16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Mar. 5, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972 7667 REPORT MONTH FEBRUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor 03-01 030124 F 672.0 A 1 N/A TA TRB Main turbine/generator removed from service due to excessive vibration.
I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.