Nuclear Operating Company South Th:awProled ct'tc Gen=ratngStaIon PO. ax289 adsirMth, Tcxzs 77483 3AA August 27, 2002 NOC-AE-02001394 File No.: G25 STI: 31484770 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Technical Specification Bases Changes South Texas Project Technical Specification Bases page B 3-2b is attached for your information and for updating the NRC copy of the Technical Specifications. Changes on the attached page provide clarification regarding the appropriate LCO Required Action for an inoperable slave relay.

If there are any questions regarding these changes, please contact me at (361) 972-7136.

Scott M. Head Manager, Licensing mkj

Attachment:

Revised Technical Specification Bases Page ]B 3-2b

& \QUALITYjANDj.LCENSING\TSB',MFNDMWENPO2 OC-AE- 02001394

NOC-AE-02001394 Page 2 of 2 cc:

(paper copy) (electronic copy)

Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 M. T. Hardt/W. C. Gunst Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Reliant Energy, Inc.

Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

ATTACHMENT Revised Technical Specification Bases Page B 3-2b

INSTRUMENTATION BASES REACTOR TRIP SYSTEM and ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

When control rods are at the top or above the active fuel region (>_step 259), they are no longer capable of adding positive reactivity to the core, and as such, they are not capable of rod withdrawal as intended by MODE 5*. Therefore, ACTION 10 on Table 3.3-1 is not applicable in this region. This allows the Reactor Trip Breakers to be closed, without meeting the requirements of MODE 5%while unlocking and stepping the control rods to a position no lower than 259. (CR 97 908-17)

Several ACTIONS in Tables 3.3-1 and 3.3-3 have been revised to change the allowed outage times and bypass test times in accordance with WCAP-1 0271 and WCAP-1 4333.

Additionally, some ACTIONS have been divided such that only certain requirements apply depending on whether the Functional Units have been modified with installed bypass test capability.

Regardless of whether the Functional Units have installed bypass test capability, it should be noted that in certain situations, the ACTIONS permit continued operation (for limited periods of time) with less than the minimum number of channels specified in Tables 3.3-1 and 3.3-3. For example, Table 3.3-1 Functional Unit 11 (Pressurizer Pressure - High) requires a minimum of 3 channels operable. However, since continued operation with an inoperable channel is permitted beyond 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, provided the inoperable channel is placed in trip, and since periodic surveillance testing of the other channels must continue to be performed, ACTION 6 permits a channel to be placed in bypass for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to permit testing. Thus, for a limited period of time (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />), 2 channels, or one less than the minimum, would be permitted to be inoperable.

Actuation relays consist of slave relays, including the relay contacts for actuating the ESF equipment. If a slave relay becomes inoperable for a particular component(s), then the associated component(s) LCO Required Action should be entered. If an entire train of slave relays for a functional unit becomes inoperable, then the Required Action for the functional unit actuation train should be entered. (CR 00-13604-7)

ACTION 27 for an inoperable channel of control room ventilation requires the associated train of control room ventilation to be declared inoperable and the appropriate action take in accordance with Specification 3.7.7. Each control room ventilation system (train) is actuated by its own instrumentation channel. Consequently an inoperable channel of ventilation actuation instrumentation renders that system/train of ventilation inoperable and Specification 3.7.7 prescribes the appropriate action.

With less than the minimum channels of Control Room Intake Air Radioactivity - High, ACTION 28 of Table 3.3-3 requires the Control Room Makeup and Cleanup Filtration System to be operated at 100% capacity in the recirculation and filtration mode. Any two of the three 50% Control Room Makeup and Cleanup Filtration System trains meet the 100% capacity requirement.

SOUTH TEXAS - UNITS 1 & 2 B 3/4 3-2b Unit 1 - Amendment No.