Nebraska Public Power District Nebraska's Energy Leader NLS2002105 August 5, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness for Duty Program Performance Report Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46 In accordance with the provisions of 10 CFR 26.71(d), enclosed is Nebraska Public Power District's fitness for duty program semiannual performance report for the period of January 1, 2002, through June 30, 2002.
Should you have any questions concerning this report, please contact me.
Sincerely, Vichae T. Co l Site Vice President
/lb Enclosure cc: Regional Administrator w/enclosure USNRC - Region IV Senior Project Manager w/enclosure USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/enclosure USNRC - Cooper Nuclear Station NPG Distribution w/o enclosure Records w/enclosure Cooper Nuclear Station P.0. Box 98 / Brownville, NE 68327-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http://www.nppd.com ý\ 0 /0
NLS2002105 Enclosure Page 1 of 3 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO IOCFR26 Nebraska Public Power 6/30/2002 Company 6 Month Ending Cooper Nuclear Station, Brownville, Nebraska Location Jerry Bebb (402)825-5060 Contact Name Phone Cutoffs: Screen/Confirmation (ng/ml) [E Appendix A to 10CFR26 Marijuana 50/15 Amphetamine 1000/500 N/A N/A Cocaine 300/150 Phencyclidine 25/25 N/A N/A Opiates 300/300 Alcohol (%BAC) 0.04% N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 816 0 105 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 51 0 0 0 86 0 For-Cause 1 0 0 0 0 0 Post Accident For-Cause Observed 5 1 0 0 1 0 Behavior Random 432 0 0 0 38 0 Follow-Up 8 0 0 0 0 0 Other 5 0 0 0 0 0 Total 502 1 0 0 125 0
NLS2002105 Enclosure Page 2 of 3 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Refusal THC Coc OP AMP PCP ALC To Test 1 2 3 4 5 Licensee Employees 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A Long-Term Contractors 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A Short-Term Contractors 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A Total 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A Total Confirmed Positive Tests For All Specific Substances and Refusals to Test: 1
NLS2002105 Enclosure Page 3 of 3
SUMMARY
OF FITNESS FOR DUTY PROGRAM ACTIVITIES FOR JANUARY THROUGH JUNE 2002 POSITIVE RESULTS:
One positive result was attributed to alcohol.
PRE-ACCESS:
There were no positive results to report during this period.
RANDOM:
There were no positive results to report during this period.
FOR-CAUSE/BEHAVIOR:
Six for-cause tests were performed during this period resulting in one confirmed positive test of a licensee employee for alcohol.
- A co-worker reported to their supervisor that an employee smelled of alcohol. The supervisor followed Cooper Nuclear Station Procedure 0-FFD-01 and requested a for cause test of the employee, which resulted in a confirmed positive for alcohol. The employee declined to participate in the Employee Assistance Program and was permanently denied access.
FOR-CAUSE/POST ACCIDENT:
One for-cause post accident test was performed following a vehicle accident in the licensee owner controlled area. The results were negative.
RANDOM TESTING RATE:
The random testing rate for this period was 51%.
SATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002105 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.