Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 (205) 992-5000 August 29, 2025 Docket Nos.: 50-321 NL-25-0337 50-366 72-36 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Ladies and Gentlemen:
In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the emergency plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). A description of the changes and a summary of the 50.54(q) analysis is enclosed.
This letter contains no NRC commitments. If you have any questions, please contact Ryan Joyce at (205) 992-6468.
Respectfully submitted, Jamie Coleman Regulatory Affairs Director JMC/efb/cbg
Enclosure:
Description of Emergency Plan Changes and Summary of 50.54(q) Analysis cc:
NRC Regional Administrator, Region II NRC NRR Project Manager - Hatch NRC Senior Resident Inspector - Hatch NRC Director, Division of Fuel Management, NMSS Georgia - State Department of Natural Resources - Director of Environmental Protection SNC Records RTYPE: CHA02.004 Digitally signed by JAMIEMCO Date: 2025.08.29 09:47:49
-05'00'
Edwin I. Hatch Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Enclosure to NL-25-0337 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis
Enclosure to NL-25-0337 Page E-1 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis On July 31, 2025, Southern Nuclear Operating Company (SNC) issued a revision to the Standard Emergency Plan Emergency Classification Action Levels (EALs) for Initiating Conditions CA6 and SA9. Specifically, Edwin I. Hatch Nuclear Plant (HNP) site procedures were revised to change the definition of Visible Damage.
The purpose of this change is to aid in the prevention of over-classification by clarifying that visible damage should be assessed by safety system train and the potential for degraded performance. The previous wording could potentially lead to an event being declared even though there is no actual or potential substantial degradation and the system is still performing adequately. An example would be when a safety system train is out of service, but the other train is available. Another example would be when there is visible damage alone but with no indications of degraded performance that would warrant a classification.
SNC has performed an analysis of this change under the provisions of 10 CFR 50.54(q)(3) and has written an evaluation documenting the determination that the change does not result in a reduction in effectiveness of the emergency plan and meets the standards in 10 CFR 50.47(b) and the requirements in 10 CFR Part 50, Appendix E.