NL-15-002, Response to Request for Permission to Use Copyrighted Graphics and Materials

From kanterella
Jump to navigation Jump to search
Response to Request for Permission to Use Copyrighted Graphics and Materials
ML15022A065
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/06/2015
From: Coyle L
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-15-002
Download: ML15022A065 (4)


Text

Entergy Nuclear Northeast Indian Paint Energy Center Entergy 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 Lawrence Coyle Site Vice President NL-15-002 January 6, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738

SUBJECT:

Indian Point Energy Center's Response to a Request For Permission to Use Copyrighted Graphics and Materials Indian Point Unit Numbers 2 and 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

REFERENCES:

1. NRC Letter to All Operating Reactor Licensees Regarding Request For Permission to Use Copyrighted Graphics and Materials, dated December 11, 2014
2. Entergy Letter ENOC-2012-00038 Regarding Evacuation Time Estimate Reports for Plants Operated by Entergy Nuclear Operations, Inc. and Entergy Operations, Inc. - 10 CFR 50.4, dated December 18, 2012

Dear Sir or Madam:

On December 11, 2014, the Nuclear Regulatory Commission ("NRC" or "Commission")

issued a letter (Reference 1) requesting that Indian Point Energy Center (IPEC) give permission to incorporate tables and graphics provided to the NRC in the Evacuation Time Estimate (ETE) submittal (Reference 2) into a new publicly available report. IPEC has received permission from the copyright holder for the NRC to use this information and is enclosing this permission in response to your request.

This letter contains no new regulatory commitments. Should you have any questions regarding this submittal, please contact Mr. Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.

Sincerely, KIZY LC / sp (4'!S

NL-15-002 Dockets 50-247 and 50-286 Page 2 of 2

Enclosure:

KLD Engineering, P.C. Letter to Entergy Regarding NRC Request to Use Copyrighted Material, dated January 2, 2015 cc: Mr. Douglas V. Pickett, Senior Project Manager, NRC NRR DORL Mr. Daniel H. Dorman, Regional Administrator, NRC Region 1 NRC Resident Inspectors Office Mr. John B. Rhodes., President and CEO, NYSERDA Ms. Bridget Frymire, New York State Ms. Michelle G Evans, Director, NRC NRR DORL Mr. Jonathan Fiske, NRR NSIR

ENCLOSURE TO NL-15-002 KLD ENGINEERING, P.C. LETTER TO ENTERGY REGARDING NRC REQUEST TO USE COPYRIGHTED MATERIAL, DATED JANUARY 2, 2015 ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 and 3 DOCKET NOS. 50-247 and 50-286

1601 Veterans Memorial Highway Suite 340 Islandia. NY 11749 USA Phone: 631.524.5940 Fax: 631.524.5935 www.kldcompanies corn January 2, 2015 Ms. Lori Glander Entergy Indian Point 450 Broadway Buchanan, NY 10511-1099 Ref: NRC Request to Use Copyrighted Material

Dear Ms. Glander:

Thank you for contacting KLD regarding the letter you received from the United States Nuclear Regulatory Commission (NRC) dated December 11, 2014 requesting permission to use copyrighted graphics and materials from the Evacuation Time Estimate (ETE) report generated for the Indian Point Energy Center. Specifically, this report is:

0 "Indian Point Energy Center Development of Evacuation Time Estimates" - KLD Technical Report (TR) - 537, dated December 2012 As requested by Entergy, KLD grants permission for the NRC to use the tables, graphics and text from the ETE report in the update of NUREG/CR-1856, "An Analysis of Evacuation Time Estimates Around 52 Nuclear Power Plant Sites," which was published in July 1981.

Sincerely, Kevin Weinisch, PE Vice President KLD Engineering, P.C.

kweinisch@kldcompanies.com