NL-14-1389, Registration of Spent Fuel Cask Use

From kanterella
(Redirected from NL-14-1389)
Jump to navigation Jump to search
Registration of Spent Fuel Cask Use
ML14252A208
Person / Time
Site: Hatch, 07200036, Holtec  Southern Nuclear icon.png
Issue date: 09/04/2014
From: Vineyard D
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
NL-14-1389
Download: ML14252A208 (2)


Text

David R. Vineyard Vice President

  • Hatch September 4, 2014 Southern Nuclear Operating Company, Inc.

Plant Edwin I. Hatch 11028 Hatch Parkway North Baxley. Georgia 31513 Tel 912.537.5859 Fax 912.366.2077 Docket Nos.: 50-321 50-366 72-36 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington. D. C. 20555-0001 Ladies and Gentlemen:

Edwin I. Hatch Nuclear Plant Registration of Spent Fuel Cask Use SOUTHERN<<\\

COMPANY NL-14-1389 Southern Nuclear Operating Company (SNC) operates the Edwin I. Hatch Nuclear Plant (Hatch) Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 10 CFR 72.210. The requirements of 10 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information associated with the HI-STORM 100 spent fuel cask systems recently placed into storage.

Cask Certificate:

Cask Model:

MPC Serial Number:

Overpack Serial Number:

Number of Fuel Bundles:

Placed in Service:

72*1014, Amendment 3 HI-STORM 1 OOS, Version B 464 826 68 August29,2014 The addition of the above cask results in the following totals for the Hatch ISFSI:

3 HI-STAR 100 Cask Systems 58 HI-STORM 100 Cask Systems

u.s. Nuclear Regulatory Commission NL-14-1389 Page 2 This letter contains no NRC commitments. If you have any questions, please contact Greg Johnson at (912) 537-5874.

Respectfully submitted, D. R. Vineyard Vice President - Hatch DRV/jcm cc:

Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Best, Executive Vice President & Chief Nuclear Officer Mr. D. A. Vineyard, Vice President-Hatch Mr. B. L. lvey, Vice President-Regulatory Affairs Mr. T. E. Tynan, Vice President-Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. G. L. Johnson, Regulatory Affairs Manager - Hatch RTYPE: CHA02.004 U.S. Nuclear Regulatorv Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Hatch Mr. D. H. Hardage, Senior Resident Inspector-Hatch