Registration of Spent Fuel Cask Use
ML14176B248
Person / Time
Site: Hatch, 07200036, Holtec  Southern Nuclear icon.png
Issue date: 06/25/2014
From: Vineyard D
Southern Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
NL-14-0978
Download: ML14176B248 (2)


Text

David R. Vineyard Vice President

  • Hatch June 25, 2014 Southern Nuclear Operating Company, Inc.

Plant Edwin I. Hatch 11026 Hatch Parkway North Baxley, Georgia 31513 Tel912.537.5859 Fax 912.366.2077 Docket Nos.: 50*321 50-366 72*36 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Registration of Spent Fuel Cask Use Ladies and Gentlemen:

SOUTHERN A COMPANY NL-14-0978 Southern Nuclear Operating Company (SNC) operates the Edwin I. Hatch Nuclear Plant (Hatch) Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 1 0 CFR 72.21 o. The requirements of 1 0 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information associated with the HI-STORM 100 spent fuel cask systems recently placed into storage.

Cask Certificate:

Cask Model:

MPC Serial Number:

Overpack Serial Number:

Number of Fuel Bundles:

Placed in Service:

Cask Certificate:

Cask Model:

MPC Serial Number:

Overpack Serial Number:

Number of Fuel Bundles:

Placed in Service:

72-1014, Amendment 3 HI-STORM 1 OOS, Version B 426 722 68 May 30,2014 72-1 014, Amendment 3 HI-STORM 1 OOS, Version B 427 723 68 June 20, 2014 The addition of the above cask results in the following totals for the Hatch ISFSI:

3 HI-STAR 100 Cask Systems 55 HI-STORM 100 Cask Systems

U. S. Nuclear Regulatory Commission NL-14-0978 Page2 This letter contains no NRC commitments. If you have any questions, please contact Greg Johnson, Plant Hatch - Regulatory Affairs Manager, at (912) 537-587 4.

D. R. Vineyard Vice President-Hatch DRV/mr cc:

Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. A. Vineyard, Vice President-Hatch Mr. B. L lvey, Vice President-Regulatory Affairs Mr. D. A. Madison, Vice President - Reet Operations Mr. B. J. Adams, Vice President-Engineering Mr. G. L Johnson, Regulatory Affairs Manager-Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatorv Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Hatch Mr. E. D. Morris, Senior Resident Inspector-Hatch