NL-13-1257, FNP-2-ESP-0.3, Revision 12 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0.3 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257

From kanterella
(Redirected from NL-13-1257)
Jump to navigation Jump to search
FNP-2-ESP-0.3, Revision 12 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0.3 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257
ML13198A460
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/14/2013
From: Reed D
Southern Co, Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-13-1257 FNP-2-ESP-0.3, Rev 12
Download: ML13198A460 (24)


Text

611412013 12:26 UNIT 2 FARLEY NUCLEAR PLANT EVENT SPECIFIC PROCEDURE FNP-2-ESP-0.3 to NL-13-1257 FNP-2-ESP-0.3 5-19-2010 Revision 12 NATURAL CIRCULATION COOLDOWN WITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

PROCEDURE USAGE Continuous Use Reference Use Information Use Approved:

David L. Reed(for)

Operations Manager REQUIREMENTS-per FNP-0-AP-6 SECTIONS ALL Date Issued: 01 / 11 / 11 S

A F

E T

Y R

E L

A T

E D

~

__________ ~

_______________ ~T_~ __ J ___ ~ __ ~ ______________

E_n_c~o~s_u_re_3 __ to __

N_L_-1_3_-1_2_5_7~

NATURAL CIRCULATION ! OOLDOWN W~H ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-O.3 TABLE OF CONTENTS Procedure Contains Number of Pages Body.................................. 16 Figure 1............................... 1 Figure 2............................... 1 Figure 3............................... 1........................... 1........................... 1 Foldout Page........................... 1 Page 1 of 1 Revision 12

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 6/14/2013 12:26 FNP-2-ESP-O.3 Revision 12 A.

Purpose This procedure provides actions to continue plant cooldown and depressurization to cold shutdown, with no accident in progress, under conditions that allow for the potential formation of a void in the upper head region with a vessel level system available to monitor void growth.

B.

Symptoms or Entry Conditions I.

This procedure is entered after completing the first ten steps of FNP-2-ESP-O.2 when the limits of FNP-2-ESP-O.2 must be exceeded; from the following:

a.

FNP-2-ESP-O.2, NATURAL CIRCULATION COOLDOWN TO PREVENT REACTOR VESSEL HEAD STEAM VOIDING, step 11

b.

FNP-2-ESP-O.2, NATURAL CIRCULATION COOLDOWN TO PREVENT REACTOR VESSEL HEAD STEAM VOIDING, step 14 Page 1 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 6/14/2013 12:26 FNP-2-ESP-O.3 Revision 12 Step Action/Expected Response Response NOT Obtained II CAUTION:

[CA] To ensure proper plant response. FNP-2-EEP-O. REACTOR TRIP OR SAFETY INJECTION. must be entered upon any SI actuation.

CAUTION:

The first ten steps of FNP-2-ESP-O.2. NATURAL CIRCULATION COOLDOWN TO PREVENT REACTOR VESSEL HEAD STEAM VOIDING. must be performed before continuing with this procedure.

CAUTION:

If RCP seal cooling had previously been lost. the affected RCP should not be started prior to a status evaluation.

NOTE:

1

  • FOLDOUT PAGE should be monitored continuously.
  • To ensure adequate pressurizer spray. the priority for establishing RCP support conditions is 2B. 2A and then 2C.

[CAl Establish RCP support conditions.

Step 1 continued on next page.

Page 2 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Revision 12 Action/Expected Response Response NOT Obtained CAUTION:

To prevent heat exchanger damage. do not attempt restoration of RCP seal return flow unless the CCW miscellaneous header is aligned to an operating CCW loop.

1.1 Verify CCW cooling -

ESTABLISHED.

1.1.1 Verify miscellaneous header aligned.

CCW TO SECONDARY HXS

[] Q2P17MOV3047 open 1.1. 2 Verify flow indicated the On-Service train.

HX 2A(2B.2C)

CCW FLOW

[] FI 3043AA

[] FI 3043BA

[] FI 3043CA 1.2 Verify seal return flow -

ESTABLISHED.

RCP SEAL WTR RTN ISO

[] Q2E21MOV8100 open

[] Q2E21MOV8112 open 1.3 Verify No.1 seal support conditions established.

in 1.3.1 Maintain seal injection flow - GREATER THAN 6 gpm.

1.3.2 Verify No.1 seal leakoff flow - WITHIN FIGURE 1 LIMITS.

1.3.3 Verify No.1 seal differential pressure -

GREATER THAN 200 psid.

1.1 Proceed to step 1.3.

Step 1 continued on next page.

Page 3 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

611412013 12:26 FNP-2-ESP-0.3 NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

Revision 12 Step II I l.4

[]

[]

l.5

[]

l.6

[]

[]

[]

l.7

[]

Action/Expected Response Verify CCW aligned.

CCW FROM RCP THRM BARR Q2P17HV3045 open Q2P17HV3184 open Check RCP thermal barrier -

INTACT.

RCP THRM BARR CCW FLOW HI Annunciator DD2 clear Verify at least one RCP bus -

ENERGIZED.

2A 4160 V bus 2B 4160 V bus 2C 4160 V bus Check CCW to RCP oil coolers -

SUFFICIENT.

CCW FLOW FROM RCP OIL CLRS LO Annunciator DD3 clear I

I Response NOT Obtained 1.5 Verify CCW flow isolated.

CCW FROM RCP THRM BARR

[] Q2P17HV3045 closed

[] Q2P17HV3184 closed 1.6 Proceed to step 1.11.

1.7 Perform the following.

1.7.1 Verify CCW - ALIGNED.

CCW TO RCP CLRS

[] Q2P17MOV3052 open CCW FROM RCP OIL CLRS

[] Q2P17MOV3046 open

[] Q2P17MOV3182 open 1.7.2 II annunciator DD3 clear.

THEN proceed to step 1.8.

IF NOT proceed to step 1.11.

Step 1 continued on next page.

Page 4 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Action/Expected Response 1.8 Check at least one RCP oil level - SUFFICIENT.

RCP 2A(2B.2C) BRG UPPER/LOWER OIL RES LO LVL

[] Annunciator HH1 clear

[] Annunciator HH2 clear

[] Annunciator HH3 clear 1.9 Check RCS pressure - GREATER THAN 1800 psig.

2C(2A) LOOP RCS WR PRESS

[] PI 402A

[] PI-403A Revision 12 Response NOT Obtained 1.8 Proceed to step 1.11.

1.9 II RCS within FIGURE 2 limits.

THEN proceed to step 1.10.

IF NOT proceed to step 1.11.

Step 1 continued on next page.

Page 5 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Action/Expected Response 1.10 Check REACTOR VESSEL LEVEL indication - 100% UPPER HEAD.

Revision 12 Response NOT Obtained 1.10 Establish conditions to accommodate void collapse upon RCP start.

1.10.1 Raise pressurizer level to greater than 67% using charging and letdown.

  • Raise charging flow.

CHG FLOW

[] FK 122 adjusted

  • Reduce letdown flow.

1.10.2 Raise SUB COOLED MARGIN MONITOR indication to greater than 40°F subcooled in CETC mode.

1.10.2.1 Dump steam at a faster rate.

1.10.3 Use PRZR heaters. as necessary to saturate the pressurizer water.

PRZR HTR GROUP VARIABLE

[] 2C PRZR HTR GROUP BACKUP

[] 2A

[] 2B

[] 2D

[] 2E Step 1 continued on next page.

Page 6 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Revision 12 Action/Expected Response Response NOT Obtained CAUTION:

Step 1.10 must be complete before starting any RCP.

NOTE:

Changes in RCP configuration may affect pressurizer spray flow.

1.11

[CA] IT support conditions exist to start an RCP THEN start at least one RCP.

1.11.1 Start bearing oil lift pump.

RCP OIL LIFT PUMP

[] 2B(2A.2C) 1.11.2 Check oil lift pressure indicating light - LIT.

1.11.3 Start RCP.

RCP

[] 2B(2A.2C) 1.11.4 WHEN RCP has operated one minute.

THEN stop bearing oil pump.

RCP OIL LIFT PUMP

[] 2B(2A.2C) 1.12

[CA] IT at least one RCP started.

for lift THEN go to FNP-2-UOP-2.1.

SHUTDOWN OF UNIT FROM MINIMUM LOAD TO HOT STANDBY.

Page 7 of 16 1.11 Perform the following.

a)

Continue efforts to establish RCP support conditions.

b)

WHEN support conditions exist to start an RCP.

THEN return to step 1.

c)

Proceed to step 2.

OBSERVE NOTE PRIOR TO STEP 2.

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Revision 12 Step Action/Expected Response Response NOT Obtained II NOTE:

To prevent excessive pressure variations. saturated conditions should be established in the pressurizer prior to lowering pressurizer level.

2 3

Establish pressurizer level to accommodate void growth.

2.1 Check pressurizer level -

25%-35%.

2.2 Place charging flow control in manual.

CHG FLOW

[] FK 122

[CAl Continue RCS cooldoWil.

3.1

[CAl Maintain RCS cold legs cooldown rate - LESS THAN 100°F IN ANY 60 MINUTE PERIOD.

RCS COLD LEG TEMP

[] TR 410 3.2

[CAl Maintain SUB COOLED MARGIN MONITOR indication -

GREATER THAN 36°F SUB COOLED IN CETC MODE.

3.3

[CAl Maintain RCS cold leg temperature and pressure -

WITHIN FIGURE 3 LIMITS.

RCS COLD LEG TEMP

[] TR 410 2C(2A) LOOP RCS WR PRESS

[] PI 402A

[] PI 403A Page 8 of 16 2.1 Control charging and letdown as necessary.

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Revision 12 Action/Expected Response Response NOT Obtained NOTE:

Reactor vessel steam voiding may occur during RCS pressure reduction.

This will cause a rapid rise in pressurizer level.

4 5

Begin RCS pressure reduction.

4.1 II normal letdown in service.

THEN control auxiliary spray to reduce RCS pressure.

4.2 Maintain RCS cold leg temperature and pressure -

WITHIN FIGURE 3 LIMITS.

RCS COLD LEG TEMP

[] TR 410 2C(2A) LOOP RCS WR PRESS

[] PI 402A

[] PI 403A

[CAl Maintain pressurizer level 25%-90%.

5.1 Check pressurizer level -

GREATER THAN 25%.

4.1 Open only one PRZR PORV to reduce RCS pressure.

5.1 Raise pressurizer level using one or both of the following.

  • Raise charging flow.

CHG FLOW

[] FK 122 manually adjusted

  • Reduce letdown flow.

Step 5 continued on next page.

Page 9 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II Action/Expected Response 5.2 Check pressurizer level - LESS THAN 90%.

Revision 12 Response NOT Obtained 5.2 Perform the following.

NOTE:

The intent of step 5.2.1 is to maintain the pressurizer liquid at saturation temperature.

Page 10 of 16 5.2.1 Turn on additional pressurizer heaters.

PRZR HTR GROUP VARIABLE

[] 2C PRZR HTR GROUP BACKUP

[] 2A

[] 2B

[] 2D

[] 2E 5.2.2 Reduce pressurizer level to less than 90% by one of the following.

  • Control charging and letdown flow as necessary.

Reduce charging flow CHG FLOW

[] FK 122 manually adjusted Raise letdown flow.

  • Continue RCS cooldown to shrink inventory.

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II 6

Action/Expected Response

[CAl Check REACTOR VESSEL LEVEL indication - GREATER THAN 44%

UPPER PLENUM.

7 Check when to isolate SI accumulators.

7.1 Check power to discharge valves - AVAILABLE.

2A(2B.2C) ACCUM DISCH ISO

[] Q2E21MOV8808A

[] Q2E21MOV8808B

[] Q2E21MOV8808C 7.2

[CAl WHEN RCS pressure less than 1000 psig.

THEN close all SI accumulator discharge valves.

2A(2B.2C) ACCUM DISCH ISO

[] Q2E21MOV8808A

[] Q2E21MOV8808B

[] Q2E21MOV8808C 6

Revision 12 Response NOT Obtained Perform the following.

6.1 Raise RCS pressure.

6.1.1 Turn on additional pressurizer heaters.

PRZR HTR GROUP VARIABLE

[] 2C PRZR HTR GROUP BACKUP

[] 2A

[] 2B

[] 2D

[] 2E 6.2 Return to step 3.

7.1 Close accumulator discharge valve disconnects using ATTACHMENT 1.

7.2 Vent any SI accumulator that cannot be isolated.

ACCUM N2 VENT

[] HIK 936 open SI ACCUM 2A 2B 2C 2A(2B.2C) ACCUM N2 SUPP/VT ISO Q2E21HV

[] 8875A [] 8875B [] 8875C open open open Step 7 continued on next page.

Page 11 of 16

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II 8

9 Action/Expected Response 7.3

[CAl WHEN SI accumulator discharge valves closed.

THEN open and lock accumulator discharge valve disconnects using ATTACHMENT 2.

[CAl Maintain letdown flow.

8.1 WHEN letdown flow less than required.

THEN open additional letdown orifice isolation valves.

LTDN ORIF ISO 45 GPM

[] Q2E21HV8149A LTDN ORIF ISO 60 GPM

[] Q2E21HV8149B

[] Q2E21HV8149C 8.2 WHEN letdown flow less than required.

THEN adjust low pressure letdown control valve.

LP LTDN PRESS

[] PK 145

[CAl Maintain seal injection flow to each RCP 13 gpm.

SEAL WTR INJECTION

[] HIK 186 adjusted Page 12 of 16 Revision 12 Response NOT Obtained

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step Action/Expected Response II

_10 11 Check if RHR system can be placed in service.

10.1 Check RCS hot leg temperatures

- LESS THAN 350°F.

RCS HOT LEG TEMP

[] TR 413 10.2 Check RCS narrow range pressure - LESS THAN 350 psig.

2C(2A) LOOP RCS NR PRESS

[] PI 402B

[] PI 403B 10.3 Place RHR system in service using FNP-2-S0P-7.0. RESIDUAL HEAT REMOVAL SYSTEM.

[CAl Continue RCS cooldown to cold shutdown with RHR.

Revision 12 Response NOT Obtained 10.1 Return to step 3.

10.2 Return to step 3.

CAUTION:

Reactor vessel steam voiding may occur if the RCS is depressurized before the entire RCS is cooled to less than 200°F.

12

[CAl Continue cooldown of inactive portion of RCS.

12.1 Maintain RCS pressure -

350-400 psig.

2C(2A) LOOP RCS NR PRESS

[] PI 402B

[] PI 403B 12.2 Verify both CRDM FANs -

STARTED.

12.3 Continue dumping steam from all SGs.

12.4 Check REACTOR VESSEL LEVEL indication - 100% UPPER HEAD.

Page 13 of 16 12.4 Return to step 11.

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 Step II

_13 Action/Expected Response Check if RCS depressurization is permitted.

Revision 12 Response NOT Obtained NOTE:

FNP-2-S0P-68.0. INADEQUATE CORE COOLING MONITORING SYSTEM provides detailed operating instructions for the core exit T/C monitor.

13.1 Check reactor vessel upper head temperature - LESS THAN 200 0 F.

CORE EXIT THERMOCOUPLE MONITOR

[] TRAIN A (Points 22.23)

[] TRAIN B (Points 16.20) 13.2 Check all atmospheric relief valves - OPEN.

2A(2B.2C) MS ATMOS REL VLV

[] PC 3371A

[] PC 3371B

[] PC 3371C 13.3 Locally check SGs - NOT STEAMING.

13.4 Go to FNP-2-UOP-2.2. SHUTDOWN OF UNIT FROM HOT STANDBY TO COLD SHUTDOWN.

-END-Page 14 of 16 13.1 Return to step 11.

13.2 Perform the following.

13.2.1 Direct counting room to perform FNP-0-CCP-64S. MAIN STEAM ABNORMAL ENVIRONMENTAL RELEASE.

13.2.2 Open all atmospheric relief valves.

2A(2B.2C) MS ATMOS REL VLV

[] PC 3371A

[] PC 3371B

[] PC 3371C 13.3 Return to step 11.

~

__________ ~

______________ ~T_~ __ J_ ~*~

~ __ ~

~ _____________

E_nC_lo_s~u_re __

3_to __

N_L_-1_3_-1_2_5_7~

NATURAL CIRCULATION t OOLDOf N W~H ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-0.3 START STEP o

Revision 12 CONTINUOUS ACTION CAUTION [CA] To ensure proper plant response.

FNP-2-EEP-0. REACTOR TRIP OR SAFETY INJECTION. must be entered upon any SI actuation.

1

[CA] Establish RCP support conditions.

0 11 1.11 [CA] IF support conditions exist to start an RCP THEN start at least one RCP.

1.12 [CA] IF at least one RCP started. THEN go to FNP-2-UOP-2.1. SHUTDOWN OF UNIT FROM MINIMUM LOAD TO HOT STANDBY.

[CA] Continue RCS cooldown.

3.1 [CA] Maintain RCS cold legs cooldown rate - LESS THAN 100F IN ANY 60 MINUTE PERIOD.

3.2 [CA] Maintain SUB COOLED MARGIN MONITOR indication -

GREATER THAN 36F SUB COOLED IN CETC MODE.

3.3 [CA] Maintain RCS cold leg temperature and pressure -

WITHIN FIGURE 3 LIMITS.

[CA] Maintain pressurizer level 25%-90%.

[CA] Check REACTOR VESSEL LEVEL indication - GREATER THAN 44% UPPER PLENUM.

7.2 [CA] WHEN RCS pressure less than 1000 psig. THEN close all SI accumulator discharge valves.

7.3 [CA] WHEN SI accumulator discharge valves closed. THEN open and lock accumulator discharge valve disconnects using ATTACHMENT 2.

[CA] Maintain letdown flow.

[CA] Maintain seal injection flow to each RCP 13 gpm.

[CA] Continue RCS cooldown to cold shutdown with RHR.

Page 15 of 16

T

_J_ "T "'" to NL 13 1257 611412013 12:26 NATURAL CIRCULATION t OOLDOf N W~H ALLOWANCE FOR FNP-2-ESP-O.3 REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

Revision 12 START STEP CONTINUOUS ACTION D 12

[CA] Continue cooldown of inactive portion of RCS.

Page 16 of 16

."".~ to NL-13-1257

_-----_--------,--*------T

.... * ---------r--------,

6/14/2013 12:26 FNP-2-ESP-O.3 No.1 Seal Differential Pressure

( PS I D. See Note 1)

NATURAL CIRCULATION COOLDOWN WITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

Revision 12 2400 2250 iiUU 2000 1800 1600 1400 1200 1000 800 600 400 200 0

FIGURE 1 NO. 1 SEAL NORMAL OPERATING RANGE I

1-------------- -------------- ------- -----_.

J

/

/

No rma 1

/

Operating Range f

/ /

/

V

/

/ V j

/

I I

I I

o.2 1

234 No.1 Seal Leak Rate (GPM) 5 Note 1: For No.1 Seal Differential Pressures greater than 400 psid. use ReS pressure in psig.

6

T

_J __

E I

3 t NL 13 1257 ncosure 0

611412013 12:26 NATURAL CIRCULATION t OOLDOWN W11H ALLOWANCE FOR FNP-2-ESP-O. 3 REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

Revision 12 FIGURE 2 RCP PRESSURE-TEMPERATURE OPERATING LIMITS 1800 1700 J

I 1600 I

1500 I

1400 1300 1200

/

1100 ReS Acceptabl e

/

Pressure 1000 Rep

/

Operati on (ps i g) 900

/

800

/

700

/

600

/

500 V

400

/

/

300 200 100 0

0 100 200 300 400 500 600 ReS Hot Leg Temperat ure (O F)

T

_J __

E I

3 t NL 13 1257 ncosure 0

611412013 12:26 NATURAL CIRCULATION t OOLDOWN W11H ALLOWANCE FOR FNP-2-ESP-O. 3 REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS)

Revision 12 FIGURE 3 UNIT 2 100°FiHR TECH. SPEC. LIMIT RCS COOLDOWN RCS Pressure 2500 (n.i ::J 2250 I

I 2000 I

I I

1750 Unacceptable I

Operati on I

1500 I

I I

I Acceptabl e 1250 I

Opera ti on I

1000 I

J J

750 Cooldown Rate

/

100°F/ HR J,

500 250 Min. RCS Bol t up Temp. =75°F 0

I I

I 0

50 100 150 200 250 300 350 400 450 500 RCS Cold Leg Tempera t ure (OF)

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-O.3 Revision 12 Step II 1

2 3

Action/Expected Response Close the following disconnects.

ATTACHMENT 1 Response NOT Obtained

'B' Train Disconnects Disconnect TPNS No.

Description Q2R18B03S-B Disconnect FV-S2 MOV 8808B-B Position Key Location ON 139' hall way-v-s outside elec.

penetration room

'A' Train Disconnects Disconnect TPNS No.

Description Q2R18B031-A Disconnect FU-Z3 MOV 8808C-A Position Key Location ON V-6 139' hall way-

~---------+---------------------------+--------r---~outside Q2R18B032-A Disconnect FU-Z2 MOV 8888A-A Verify accumulator discharge valves MCB indication - POWER AVAILABLE.

2A(2B.2C) ACCUM DISCH ISO

[] Q2E21MOV8808A

[] Q2E21MOV8808B

[] Q2E21MOV8808C Notify control room of accumulator discharge valve disconnect status.

-END-Page 1 of 1 ON V-4 counting room

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATION !OOLDO~N wITH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-O.3 Revision 12 Step Action/Expected Response Response NOT Obtained II 1

2 Open and lock the following disconnects.

ATTACHMENT 2

'A' Train Disconnects Disconnect Description Position TPNS No.

Q2R18B031-A Disconnect FU-Z3 MOV 8808C-A LOCKED OPEN Q2R18B032-A Disconnect FU-Z2 MOV 8808A-A LOCKED OPEN

'B' Train Disconnects Key V-6 V-4 Disconnect TPNS No.

Description Position Key Q2R18B035-B Disconnect FV-S2 MOV 8808B-B LOCKED OPEN Notify control room of accumulator discharge valve disconnect status.

-END-Page 1 of 1 V-5 Location 139 ' hallway-outside counting room Location 139' hallway-outside elec.

penetration room

~

__________ ~

______________ ~T

____ J_ ~*~

~ __ ~

~ ____________

E_n_CI_O_Surr_e_3_t_O_N_L_-_13_-_1_25_7~

NATURAL CIRCULATIO~Ol B8E~o~GW1TH ALLOWANCE FOR REACTOR VESSEL HEAD STEAM VOIDING (WITH RVLIS) 611412013 12:26 FNP-2-ESP-O.3 Step Action/Expected Response II I 1

Monitor SI criteria.

1.1 Greater than 16°F subcooled in CETC mode and PRZR level above 4%.

2 Monitor switchover criteria.

2.1 CST level greater than 5.3 ft.

I I

Revision 12 Response NOT Obtained 1.1 Verify SI actuated AND go to FNP-2-EEP-O.

2.1 Align AFW pumps suction to SW using FNP-2-S0P-22.0.