Supplemental Response to NRC RAI Per 10CFR 50.54(f) Re the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
ML13228A004
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/12/2013
From: Ventosa J
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-13-107
Download: ML13228A004 (4)


Text

vEn tergy Enterav Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 John A Ventosa Site Vice President Administration NL-13-107 August 12, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

References:

Entergy Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Indian Point Unit Number 3 Docket No. 50-286 License No. DPR-64

1.

NRC letter to Entergy, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12053A340)

2.

Entergy Unit 3 Letter to NRC (NL-1 2-170), Flooding Walkdown Report - Entergy's Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident, dated November 27, 2012

Dear Sir or Madam:

On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 4 of Reference 1 requested that each licensee perform flood protection walkdowns and report the results within 180 days of NRC endorsement of the flooding walkdown procedure (NEI 12-07).

Entergy Nuclear Operations, Inc. (Entergy) completed the flood protection walkdowns

NL-13-107 Docket No. 50-286 Page 2 of 2 at IPEC and submitted the results in Reference 2. Reference 2 contained open items where restricted access prevented walkdown of certain flood protection features.

Walkdowns of the restricted access items have been completed and this letter provides the results. This submittal closes the open items in Reference 2.

The attached table provides a list of the restricted access items inspected, their respective disposition, and any action planned or taken. As a result of the inspections:

There were 2 deficiencies found. One was entered into the Plant's CAP program to correct as part of the flood hazard analysis as noted.

No temporary measures were required as a result of the completed inspections.

APM's were collected and documented in the walkdown record forms for each applicable item inspected in accordance with NEI 12-07.

All Restricted Items inspected were within the plant maintenance and monitoring programs unless identified as a deficiency in the attached table.

One of the restricted access items was reclassified as Inaccessible.

There are no new commitments identified in this submittal.

If you have any questions concerning the content of this letter, please contact Mr. Robert Walpole, Manager, Licensing at (914) 254-6710.

I declare ujqder penalty of perjury that the foregoing is true and correct. Executed on August 1Ž2013.

Respectfully, JAV/sp

Attachment:

Flooding Walkdown Report Open Items cc:

Mr. Douglas V. Pickett, Senior Project Manager, NRC NRR DORL Mr. William M. Dean, Regional Administrator, NRC Region 1 NRC Resident Inspectors Office Mr. Francis J. Murray, Jr., President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service

ATTACHMENT TO NL-13-107 FLOODING WALKDOWN REPORT OPEN ITEMS ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET NO. 50-286

NL-13-107 Docket No. 50-286 Attachment Page 1 of 1 Flooding Wal k down Report Open Items Deficiencies Deficiency Description Actions Taken or Inaccessible Description of Feature Identified (yes/no)

Planned (yes/no)

Description Electrical Manhole #34 in Transformer Yes Not inspected since Conduits are sealed Plan to assess seals No Yard in the switchgear room. No CR since based on final flood sealed.

hazard analysis. A 2 year PM to inspect the seals was put in place.

Roof and Associated Drains on PAB, No None None No ABFP Building, CB, TB, and Fan House.

Nine Service Water Pump Conduits that Yes The conduits were inspected in manhole Plan to seal conduits Yes (switchgear is Penetrate the Floor of the 480V 33 and are not sealed but are in Manhole 33 based over conduit and Switchgear Room underneath the acceptable since the current design on the final flood would have to be Switchgear basis flood elevation is below the hazard analysis and removed for switchgear bus bars. Entered in CAP add to monitoring access - will seal program.

in manhole)

No See above [The conduits were inspected See above [Plan to No Electrical Manhole #33 in Turbine in manhole 33 and are not sealed but seal conduits in Building are acceptable since the current design Manhole 33 based on basis flood elevation is below the the final flood hazard switchgear bus bars. Entered in CAP]

analysis and add to monitoring program.]

Seals around the Service Water piping No None None.

No that penetrates the floor of the Zurn Strainer Pit