NL-11-2402, CFR 50.46 ECCS Evaluation Model Annual Reports for 2010

From kanterella
(Redirected from NL-11-2402)
Jump to navigation Jump to search
CFR 50.46 ECCS Evaluation Model Annual Reports for 2010
ML113550446
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 12/21/2011
From: Ajluni M
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-11-2402
Download: ML113550446 (18)


Text

Mark J. Ajluni. P.E. Southern Nuclear Nuclea r Licensing Director Operating Company. Inc.

40 Invern ess Center Parkway Post Office Box 1295 Birmingham, Alabama 3520 1 Te l 205.992.7673 Fax 205.992.7885 December 21, 2011 SOUTHERN ' \ '

COMPANY Docket Nos.: 50-321 50-348 50-424 NL-11-2402 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2010 Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) is the licensed operator for the Edwin I. Hatch Nuclear Plant (Hatch) , the Joseph M. Farley Nuclear Plant (Farley) , and the Vogtle Electric Generating Plant (Vogtle) . The requirements of 10 CFR 50.46(a)(3)(ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analysis. Accordingly , the reports required by 10 CFR 50.46(a)(3)(ii) for Hatch, Farley, and Vogtle are provided in Enclosures 1, 2, and 3, respectively. The resulting peak cladding temperature (PCT) for Hatch, Farley, and Vogtle continues to meet the criterion of 10 CFR 50.46(b)(1) (i.e., :$ 2200°F).

Please note that Farley re-analyzed the small break LOCA (SBLOCA) analysis of record (AOR). The revised AOR was implemented in February 2010. There has been no change in Farley's AOR SBLOCA PCT between the time the new AOR was implemented and December 31 , 2010.

This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037 .

Respectfully submitted,

~ ~CJf-:

M. J. Ajluni Nuclear Licensing Director MJA/RMJ/lac

U. S. Nuclear Regulatory Commission NL-11-2402 Page 2

Enclosures:

1. Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010
2. Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010
3. Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bast, Chief Nuclear Officer Mr. T. A. Lynch, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Ms. P. M. Marino, Vice President - Engineering Mr. B. L. Ivey, Vice President Regulatory Affairs Mr. B. J. Adams, Vice President Fleet Operations RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. L. M. Cain, Senior Resident Inspector - Vogtle Mr. P. G. Boyle, I\IRR Senior Project Manager-Vogtle, Hatch

Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2010 Enclosure 1 Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 to NL-11-2402 Edwin I. Hatch l\Juclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Edwin I. Hatch Nuclear Plant Unit 1 SAFERIGESTR-LOCA Analysis Model Table 1-1a - Summary of Changes/Errors (2010)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 1-1 b - Cumulative Impact of Changes/Errors GE14 Description

~IPCTI (OF)

  • Changes/Errors Previously Reported (Reference 1) 5
  • Current Year - 2010 (Reference 2) 0 5

Cumulative Total E1-2 to NL-11-2402 Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Edwin I. Hatch Nuclear Plant Unit 2 SAFERIGESTR-LOCA Analysis Model Table 1-2a - Summary of Changes/Errors (2010)

Estimated Description Effect (L'l PCT)

None affecting PCT N/A Table 1-2b - Cumulative Impact of Changes/Errors GE14 Description L'lIPCTI (OF)

  • Changes/Errors Previously Reported (Reference 1) 5
  • Current Year - 2010 (Reference 2) 0 5

Cumulative Total E1-3 to NL-11-2402 Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010

References:

1. Letter from Mark J. Ajluni to USI\lRC (I\lL-1 0-2340), "Edwin I. Hatch I\luclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2009," dated December 16, 2010.
2. Letter from E. B. Gibson to L. P. Hill (CAH-11-039), "2010 ECCS Error Notifications for Plant Hatch," dated December 19, 2011.

E1-4

Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2010 Enclosure 2 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 to NL-11-2402 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Joseph M. Farley Nuclear Plant - Unit 1 ASTRUIVI Best Estimate Large Break LOCA Evaluation Table 2-1a - Summary of Changes/Errors (2010)

Estimated Description Effect (fl PCT)

None affecting PCT N/A Table 2-1 b - Cumulative Impact of Changes/Errors fllPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 18
  • Current Year - 2010 (Reference 2) 0 Cumulative Total 18 E2-2 to NL-11-2402 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Joseph M. Farley Nuclear Plant - Unit 1 NOTRUMP Appendix K Small Break LOCA Evaluation Table 2-1c - Summary of Changes/Errors (2010)

Estimated Description Effect

(/\ PCT)

I\lone affecting PCT N/A Table 2-1d - Cumulative Impact of Changes/Errors

/\IPCTI Description (OF)

  • Changes/Errors Previously Reported
  • 0
  • Current Year - 2010 (References 2 and 3) 0 Cumulative Total 0
  • Farley re-analyzed the small break LOCA (SBLOCA) analysis of record (AOR). The revised AOR was implemented in February 2010. There has been no change in Farley's AOR SBLOCA PCT between the time the new AOR was implemented and December 31, 2010.

E2-3 to NL-11-2402 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Joseph M. Farley Nuclear Plant - Unit 2 ASTRUM Best Estimate Large Break LOCA Evaluation Table 2-2a - Summary of Changes/Errors (2010)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 2-2b - Cumulative Impact of Changes/Errors

~IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 18
  • Current Year - 2010 (Reference 2) 0 Cumulative Total 18 E2-4 to NL-11-2402 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Joseph M. Farley Nuclear Plant - Unit 2 NOTRUMP Appendix K Small Break LOCA Evaluation Table 2-2c - Summary of Changes/Errors (2010)

Estimated Description Effect (6 PCT)

None affecting PCT N/A Table 2-2d - Cumulative Impact of Changes/Errors 61pCTI Description (OF)

  • Changes/Errors Previously Reported
  • 0
  • Current Year - 2010 (References 2 and 3) 0 Cumulative Total 0
  • Farley re-analyzed the small break LOCA (SBLOCA) analysis of record (AOR). The revised AOR was implemented in February 2010. There has been no change in Farley's AOR SBLOCA PCT between the time the new AOR was implemented and December 31, 2010.

E2-5 to NL-11-2402 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010

References:

1. Letter from Mark J. Ajluni to USNRC (NL-1 0-2340), "Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2009," dated December 16, 2010
2. Westinghouse Letter LTR-LlS-11-48, "J. M. Farley Units 1 and 2 10 CFR 50.46 Annual Notification and Reporting for 2010," dated January 26, 2011
3. Westinghouse Letter LTR-LlS-11-251 , "10 CFR 50.46 Revised PCT Rackup Sheets for J. M. Farley Units 1 and 2," dated April 13,2011 E2-6

Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2010 Enclosure 3 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 to NL-11-2402 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Vogtle Electric Generating Plant - Unit 1 BASH Large Break LOCA Evaluation Table 3-1a - Summary of Changes/Errors (2010)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 3-1 b - Cumulative Impact of Changes/Errors

~IPC"I Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 40
  • Current Year - 2010 (Reference 2) 0 Cumulative Total 40 E3-2 to NL-11-2402 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Vogtle Electric Generating Plant - Unit 1 Appendix K Small Break LOCA Evaluation Table 3-1c - Summary of Changes/Errors (2010)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 3-1d - Cumulative Impact of Changes/Errors Description ~IPC"I (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Current Year - 2010 (Reference 2) 0 Cumulative Total 0 E3-3 to NL-11-2402 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Vogtle Electric Generating Plant - Unit 2 BASH Large Break LOCA Evaluation Table 3-2a - Summary of Changes/Errors (2010)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 3-2b - Cumulative Impact of Changes/Errors

~IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 40
  • Current Year - 201 0 (Reference 2) 0 Cumulative Total 40 E3-4 to NL-11-2402 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010 Vogtle Electric Generating Plant - Unit 2 Appendix K Small Break LOCA Evaluation Table 3-2c - Summary of Changes/Errors (201 0)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 3-2d - Cumulative Impact of Changes/Errors

~IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Current Year - 2010 (Reference 2) 0 Cumulative Total 0 E3-5 to NL-11-2402 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2010

References:

1. Letter from Mark J. Ajluni to USNRC (NL-1 0-2340), "Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2009," dated December 16, 2010
2. Westinghouse Letter LTR-LlS-11-66, "Vogtle Units 1 and 2 10 CFR 50.46 Annual Notification and Reporting for 2010," dated January 24, 2011 E3-6