Mark J. Ajluni, P.E.
Southern Nuclear Nuclear Licensing Director Operating Company, Inc.
40 Invemess Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 soutHERN'\\
September 9, 2011 COMPANY Docket Nos.: 50-321 50-424 50-366 50-425 NL-11-1475 U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Adoption of ASME OM Code, Subsection ISTD Ladies and Gentlemen:
Southern Nuclear Operating Company (SNC) recently compared the existing Technical Requirements Manual snubber programs for Hatch Nuclear Plant (HNP) and Vogtle Electric Generating Plant (VEGP) to the option included in 10 CFR 50.55a(b)(3)(v), (issue date October 1, 2004) applicable to the current 1 O-Year Interval. This comparison resulted in a decision to adopt the ASME OM Code, Subsection ISTD, at both plants for snubber examinations and testing.
SNC recognizes that inservice examinations must be performed using the VT-3 visual examination method described in the American Society of Mechanical Engineers (ASME)Section XI Code, paragraph IWA-2213.
For snubber examination and testing, 10 CFR 50.55a(b)(3)(v) endorses the ASME OM Code, 2001 Edition with Addenda through 2003, Subsection ISTD.
SNC has amended the HNP and VEGP Technical Requirements Manuals to reference this OM Code for snubber examinations and testing. This letter serves only as notification of SNC's adoption of the ASME OM Code, 2001 Edition with Addenda through 2003, Subsection ISTD, which has been previously endorsed by the NRC. Additional NRC approval is not required. Copies of the Snubber Program/Plan are not enclosed but are available at each plant for regulatory review/reference. A copy of the Snubber Program/Plan will be sent at the beginning of the next 10-Year as required by ISTA-3200(a).
This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037.
Respectfully submitted,
'(YW.l ~+
M. J. Ajluni Nuclear Licensing Director MJAlGALllac
U. S. Nuclear Regulatory Commission NL-11-1475 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Ms. P. M. Marino, Vice President - Engineering RType: CHA02.004; CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. L. M. Cain, Senior Resident Inspector - Vogtle Mr. P. G. Boyle, NRR Project Manager - Hatch and Vogtle