NL-10-1439, Response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator License Examinations

From kanterella
(Redirected from NL-10-1439)
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator License Examinations
ML102230424
Person / Time
Site: Hatch, Vogtle, Farley  
Issue date: 08/03/2010
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-10-1439, RIS-10-008
Download: ML102230424 (12)


Text

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN COMPANY August 3, 2010 Docket Nos.: 50-321 50-348 50-424 52-025 NL-10-1439 50-366 50-364 50-425 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Units 1 and 2 Vogtle Electric Generating Plant Units 3 and 4 Response to Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:

On June 28, 2010, the NRC issued Regulatory Issue Summary (RIS) 2010-08,

'Preparation and Scheduling of Operator Licensing Examinations." RIS 2010-08 requests that addressees voluntarily submit estimates regarding operator licensing examinations. In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides the requested information on NRC Form 536 for the Edwin I. Hatch Nuclear Plant (HNP), the Joseph M. Farley Nuclear Plant (FNP) and the Vogtle Electric Generating Plant (VEGP).

The provided estimates are not commitments and may change. If you have any questions, please advise.

Respectfully submitted, M. J. Ajluni Nuclear Licensing Director MJA/TDH/lac yxcc.

pCD3

U. S. Nuclear Regulatory Commission NL-1!0-1439 Page 2 :

NRC Form 536 Operator Licensing Examination Data for Edwin I.

Hatch Nuclear Plant :

NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant :

NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant Units 1 and 2 :

NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant Units 3 and 4 cc:

Southern Nuclear Operating Company Mr. J. H. Miller, III, President and CEO Mr. J. T. Gasser, Executive Vice President Mr. J. A. Miller, Executive Vice President, Nuclear Development Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Units 1 and 2 Mr. D. H. Jones, Vice President - Vogtle Units 3 and 4 Mr. B. L. Ivey, Vice President, Nuclear Development Support Ms. P. M. Marino, Vice President - Engineering Mr. M. K. Smith, Technical Support Director Mr. D. M. Lloyd, Vogtle 3 & 4 Project Support Director Mr. C. R. Pierce, AP1000 Licensing Manager Mr. T. C. Moorer, Manager, Environmental Affairs, Chemistry and Rad.

Services Mr. J. D. Williams, Vogtle 3 & 4 Site Support Manager Mr. J. T. Davis, Vogtle 3 & 4 Site Licensing Manager Mr. W. A..Sparkman, COL Project Engineer Mr. B. W. Waites, Project Engineer RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle 1 & 2 =CVC7000; Vogtle 3 & 4=AR01.1053 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. M. Akstulewicz, Deputy Director Div. of Safety Systems & Risk Assess.

Mr. R. E. Martin, NRR Project Manager - Farley, Hatch and Vogtle Mr. R. G. Joshi, Lead Project Manager of New Reactors Ms. T. E. Simms, Project Manager of New Reactors Mr. B. C. Anderson, Project Manager of New Reactors Mr. M. M. Comar, Project Manager of New Reactors Ms. S. Goetz, Project Manager of New Reactors Mr. J. M. Sebrosky, Project Manager of New Reactors Mr. D. C. Habib, Project Manager of New Reactors Ms. D. L. McGovern, Project Manager of New Reactors Ms. T. L. Spicher, Project Manager of New Reactors Ms. M. A. Sutton, Environmental Project Manager Mr. M. D. Notich, Environmental Project Manager Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. M. Cain, Senior Resident Inspector - Vogtle Units 1 & 2 Mr. J. D. Fuller, Senior Resident Inspector of VEGP 3 &'4

U. S. Nuclear Regulatory Commission NL-10-1439 Page 3 Georgia Power Company Mr. T. W. Yelverton, Nuclear Development Director Ms. A. N. Faulk, Nuclear Regulatory Affairs Manager Oglethorpe Power Corporation Mr. M. W. Price, Executive Vice President and Chief Operating Officer Mr. K. T. Haynes, Director of Contracts and Regulatory Oversight Municipal Electric Authority of Georgia Mr. J. E. Fuller, Senior Vice President, Chief Financial Officer Mr. S. M. Jackson, Vice President, Power Supply Dalton Utilities Mr. D. Cope, President and Chief Executive Officer Bechtel Power Corporation Mr. J. S. Prebula, Project Engineer Mr. R. W. Prunty, Licensing Engineer Tetra Tech NUS, Inc.

Ms. K. K. Patterson, Project Manager Shaw Stone & Webster, Inc.

Mr. C. A. Fonseca, Vogtle Project Manager Mr. J. M. Oddo, Licensing Manager Mr. D. C. Shutt, Licensing Engineer Westinghouse Electric Company, LLC Mr. S. D. Rupprecht, Vice President of Regulatory Affairs & Strategy Mr. N. C. Boyter, Consortium Project Director Vogtle Units 3 & 4 Mr. S. A. Bradley, Vogtle Project Licensing Manager Mr. M. A. Melton, Manager, Regulatory Interfaces Mr. R. B. Sisk, Manager, AP1000 Licensing and Customer Interface Mr. D. A. Lindgren, Principal Engineer, AP1000 Licensing and Customer Interface NuStart Enerqy Mr. R. J. Grumbir Mr. E. R. Grant Mr. P. S. Hastings Mr. B. Hirmanpour Mr. N. Haggerty Ms. K. N. Slays

U. S. Nuclear Regulatory Commission NL-10-1439 Page 4 Other NuStart Energy Associates Ms. M. C. Kray, NuStart Mr. S. P. Frantz, Morgan Lewis Mr. J. A. Bailey, TVA Ms. A. L. Sterdis, TVA Mr. J. P. Berger, EDF Mr. W. Maher, FP&L Mr. P. Hinnenkamp, Entergy Mr. G. D. Miller, PG&N Mr. N. T. Simms, Duke Energy Mr. G. A. Zinke, NuStart & Entergy Mr. R. H. Kitchen, PGN Ms. A. M. Monroe, SCE&G Mr. T. Beville, DOE/PM NRC Form 536 Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Edwin 1. Hatch Nuclear Plant Units I & 2 IO A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2 0 13 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 NUMBER OF REACTOR 6

8 5

5 OPERATORS NUMBER OF SENIOR REACTOR 4

4 6

6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

1 1

1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 06/18/2012 06/03/2013 06/02/2014 06/01/2015 ALTERNATE DATE 06/04/2012 06/17/2013 06/16/2014 06/15/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSI NGII estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Joseph M. Farley Nuclear Plant Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 201 3 Cy 201 4 Cy 2015 NUMBER OF REACTOR 10 10 8

8 OPERATORS NUMBER OF SENIOR REACTOR 10 10 10 10 OPERATORS - INSTANT 10 NUMBER OF SENIOR REACTOR 0

0 2

2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/18/2012 06/17/2013 06/16/2014 06/15/2015 ALTERNATE DATE 06/11/2012 06/24/2013 06/23/2014 06/22/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant Units I and 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Vogtle Electric Generating Plant Units I & 2 IO A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 201 3 Cy 20 14 Cy 2015 NUMBER OF REACTOR 13 10 10 10 OPERATORS NUMBER OF SENIOR REACTOR 8

10 10 10 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1

1 1

1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/19/2012 03/25/2013 03/24/2014 03/23/2015 ALTERNATE DATE 03/26/2012 04/01/2013 03/31/2014 03/30/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant Units 3 and 4

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Vogtle Electric Generating Plant Units 3 & 4 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

2 4

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS III B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2 0 15 NUMBER OF REACTOR 0

15 18 9

OPERATORS NUMBER OF SENIOR REACTOR 0

45 12 6

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

0 0

0 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 07/29/2013 02/03/2014 02/27/2015 ALTERNATE DATE 08/05/2013 02/10/2014 03/05/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 15 15 CANDIDATES NRC FORM 536 (10G-2008)

PRINTED oN REC.YCLED PAPER