NL-09-2000, Comment (1) of Mark J. Ajluni on Draft License Renewal Interim Staff Guidance LR-ISG-2009-01: Staff Guidance Regarding Plant-Specific Aging Management Review and Aging Management Program for Neutron-Absorbing Material in Spent Fuel Pools

From kanterella
Jump to navigation Jump to search
Comment (1) of Mark J. Ajluni on Draft License Renewal Interim Staff Guidance LR-ISG-2009-01: Staff Guidance Regarding Plant-Specific Aging Management Review and Aging Management Program for Neutron-Absorbing Material in Spent Fuel Pools
ML093570197
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 12/17/2009
From: Ajluni M, Stringfellow N
Southern Nuclear Operating Co
To: Lesar M
Rulemaking, Directives, and Editing Branch
References
74FR62829 00001, LR-ISG-2009-01, NL-09-2000, NRC-2009-0521
Download: ML093570197 (3)


Text

1V SOUTHERN RE Southern Nuclear Operating Company 40 Inverness Center Parkway COMPANY P. O. Box 1295 Birmingham, Alabama 35201 Energyto Serve Your World' SNC -Nuclear Licensing

/0 69/k, 'ýI7 (D DATE: 1Z--ol" Number of Pages Including Cover Sheet TO: M-cAw4L T L._r/ FROM:- &JW IrX/MAp&FL-d411 Phone: ( ) Phone: ( ) f- 0 5 11Z- 7917-Fax:( ) 301-__Z " . 4'Aqb Fax: ( ) Zo01-1 2- -78 l,5 REMARKS: EL Urgent El For Your Review 0 Reply ASAP El Please Comment D,

4Z:

ffe /)ee&eý /

-z 9 ý d-( e&/

~A-~e~T. Cýý I OV: ST 60-OT-ZI ValDnN NHHHLnOS NH3II1S H~3'~UI S8OZZG66sz fiq ~lugs X~a C/T : fid

Southern. Nucier.:

(Operairiaj Company 1i'.

'. ') , * . ,.'.

  • .,r, i - r
  • 1:' 2 0 SOUTHERNA December 17, 2009 Ii:_: --\ / COMPANY Docket Nos.: 50-321 50-348 50-424 NL-09-2000 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Comments on Draft License Renewal Interim Staff Guidance. LR-ISG-2009-01:

Staff Guidance Regarding Plant-Specific Aging Management Review and Acging Management Program for Neutron-Absorbing Material in Spent Fuel Pools (Docket ID NRC-2009-0521)

Ladies and Gentlemen:

The Nuclear Regulatory Commission (NRC) requested comments on Draft License Renewal Interim Staff Guidance, LR-ISG-2009-01: Staff Guidance Regarding Plant-Specific Aging Management Review and Aging Management Program for Neutron-Absorbing Material in Spent Fuel Pools, via Federal Register notice dated December 1, 2009 (74 FR 62829). As the licensed operator for the Edwin I. Hatch Nuclear Plant; the Joseph M. Farley Nuclear Plant; and the Vogtle Electric Generating Plant, Southern Nuclear Operating Company (SNC) takes exception to the statement that, "Similarly, the spent fuel pool water chemistry program at Vogtle documented an increase in the concentration of aluminum, which indicates loss of material from the Boral neutron absorbing material (Ref, 7)."

The statement from the ISG which is quoted above implies that Southern Nuclear concluded that the increase in the concentration of aluminum indicates loss of material from the BORAL'm neutron absorbing material. SNC does not believe that increasing aluminum concentration in the sr)ent fuel pool water is conclusive evidence that loss of material from the BORAL neutron absorbing material is occurring. The license renewal application for Vogtle Electric Generating Plant (VEGP) (ISG Ref. 7), did state in Section B.3.28, "Aluminum concentrations in the spent fuel pool water have increased .. " However, section 3.3.2.2.6 of the VEGP license renewal application also stated, `VEGP manages loss of material due to corrosion of the aluminum cladding material with the Water Chemistry Program,"

The aging management reviews documented in the VEGP license renewal application did not conclude that loss of material from the BORALTM neutron absorbing material was indicated by the increased aluminum concentration in the EZ :13d 8wST 60-81-ZT ~'~NN3LO uvaionw NHHHinos 8L6SZ :

SOOZZ66SOZ fq.~ ~

fiq lugs XVd

U. S. Nuclear Regulatory Commission NL-09-2000 Page 2 spent fuel pool water, but rather that it indicated corrosion of the aluminum cladding on the BORALTM .

Therefore, it is inappropriate to use the Vogtle Electric Generating Plant operating experience with aluminum concentration in the spent fuel pool as indication of degradation of the BORALTM neutron .absorbing material. SNC will perform testing of the BORALTM neutron absorbing material as committed to in the Future Action Commitment List in Appendix.A of NUREG-1920, The Safety Evaluation Report Related to the Vogtle Electric Generating Plant, Units 1 and 2.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, M. J. Ajluni Nuclear Licensing Manager MJAtJEH/phr cc: Southern Nuclear Operatina Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison2 Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Ms. P. M. Marino, Vice President - Engineering RType:<Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Ms. D. N.Wright, NRR Project Manager - Hatch Ms. D. N.Wright, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. M. Cain, Senior Resident Inspector - Vogtle 6/6 :fid 8':ST 60-81-ZT 19'O HummR WHinHZOS HHOSS8 66Z :