ML081130771
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/16/2008
From: Robert Walpole
Entergy Nuclear Indian Point 2, Entergy Nuclear Indian Point 3, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-069
Download: ML081130771 (7)


Text

Indian Point Energy Center 450 Broadway, GSB En P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel 914 734 6710 Robert Walpole Licensing Manager April 16, 2008 Re: Indian Point Units No 1, 2, 3 Docket Nos. 50-3, 50-247, 50-286 NL-08-069 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001

Subject:

2007 Annual Environmental Protection Plan Report Dear Sir or Madam; Enclosure 1 to this letter provides Entergy Nuclear Operations, Inc.'s (ENO's) Annual Environmental Protection Plan Report for the period January 1, 2007 through December 31, 2007. This report is submitted in accordance with Appendix B to facility operating licenses DPR-26 and DPR-64 for Indian Point Units 2 and 3, respectively and to reflect use of Unit 1 facilities. This report satisfies the requirements of Subsection 5.4.1 of the Environmental Technical Specifications.

There are no new commitments identified in this submittal.

Should you have any questions regarding this matter, please contact Mr. Robert Walpole, Licensing Manager at (914) 734-6710.

Very truly yours, Robert Walpole Licensing Manager Indian Point Energy Center ii~i~~0

Docket Nos. 50-3, 50-247, 50-286 NL-08-069 Page 2 of 2 : 2007 Annual Environmental Protection Plan Report cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. John Boska, Senior Project Manager, NRC NRR DORL IPEC Resident Inspector's Office Director, NRC Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguard Mr. Eugene Cobey, Chief, NRC Division of Reactor Projects Mr. Paul Eddy, NYS Department of Public Service Mr. Chuck Nieder, NYS Department of Environmental Conservation Mr. Paul D. Tonko, NYS Energy Research and Development Authority Mr. Robert Oliveira, American Nuclear Insurers

K ENCLOSURE 1 TO NL-08-069 2007 Annual Environmental Protection Plan Report ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT UNIT 1, 2, AND 3 NUCLEAR POWER PLANTS DOCKET NOS. 50-03, 50-247, AND 50-286

Annual Environmental Protection Plan Report For the 2007 Calendar Year Pursuant to Appendix B to Facility Licenses Indian Point Unit Nos. 1,2, and 3 Subsection 5.4.1 of Appendix B to the Nuclear Regulatory Commission Facility Operating Licenses for Indian Point Units 1, 2, (issued April 24, 1981) and 3 (issued May 26, 1981), requires that an Annual Environmental Protection Plan Report (the "Report") describing implementation of the facilities' Environmental Protection Plan (the "EPP") for the previous year be submitted to the NRC prior to May 1 of each year. This Report is for the 2007 calendar year.

Subsection 5.4.1 of Appendix B specifies that the Report shall include summaries and analyses of the results of any EPP activities (environmental monitoring) required by Subsection 4.2 of the EPP for the reporting period.

Response

Subsection 4.2 specifies that no environmental monitoring is required. No adverse trends indicating damage to the environment, from non-radiological discharges, have been reported to the New York State Department of Environmental Conservation during the reporting period.

Subsection 5.4.1 of Appendix B also specifies the Report shall include:

A. A list of EPP noncompliance's during calendar year 2007 and the corrective actions taken to remedy them.

Response

During the calendar year 2007, there were no EPP noncompliances.

B. A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection 3.1 which involved a potentially significant unreviewed environmental issue at Indian Point Units 1, 2, and 3 during calendar year 2007.

Response:.

During the calendar year 2007, there were no changes in station design or operation, tests, and experiments, which involved a potentially significant unreviewed environmental issue at Indian Point Units 1, 2, or 3.

Page 1

C. A list of non-routine reports submitted in accordance with Subsection 5.4.2.

Response

During calendar year 2007, Indian Point Units 2 and 3 did not submit any non-routine report to the NRC.

D. A list of all reports submitted in accordance with the SPDES (State Pollution Discharge Elimination System) permit during 2007.

Response

1. SPDES Permit (a) Listed below are the recipient, transmitter and transmittal dates for the 2007 monthly Discharge Monitoring Reports which were submitted to the NYSDEC and other agencies pursuant to the SPDES permit for Indian Point Units 1, 2, and 3 (permit no. NY0004472).

Recipient Transmitter Date New York State DEC Bureau of Fred Dacimo 2/21/07 Water Compliance Programs Vice President 3/12/07 625 Broadway, 4 th Floor Albany, NY Entergy Nuclear Indian Point 4/19/07 12233-3506 450 Broadway, Suite I P.O. 5/18/07 Box 249 6/25/07 Buchanan, NY 10511-0249 7/18/07 8/22/07 9/20/07 10/22/07 11/14/07 New York State DEC Bureau of Anthony Vitale 12/13/07 Water Compliance Programs General Manager, Plant 1/23/08*

625 Broadway, 4 th Floor Albany, NY Operations 12233-3506 Entergy Nuclear Indian Point 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249 New York State DEC Fred Dacimo 2/21/07 Region 3 - White Plains Office Vice President 3/12/07 100 Hillside Avenue, Suite 1W Entergy Nuclear Indian Point 4/19/07 White Plains, NY 10603-2860 450 Broadway, Suite 1 5/18/07 P.O. Box 249* 6/25/07 Buchanan, NY 10511-0249 7/18/07 8/22/07 9/20/07 10/22/07 11/14/07 New York State DEC Anthony Vitale 12/13/07 Region 3 - White Plains Office General Manager, Plant 1/23/08*

100 Hillside Avenue, Suite 1W Operations White Plains, NY 10603-2860 Entergy Nuclear Indian Point 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249 Page 2

Recipient Transmitter Date Mr. Howard Golub Fred Dacimo 2/21/07 Executive Director & Chief Engineer Vice President 3/12/07 Interstate Environmental Entergy Nuclear Indian Point 4/19/07 Commission 450 Broadway, Suite 1 P.O. 5/18/07 311 West 43rd. Street, Suite 201 Box 249 6/25/07 New York, NY 10036 Buchanan, NY 10511-0249 7/18/07 8/22/07 9/20/07 10/22/07 11/14/07 Mr. Howard Golub Anthony Vitale 12/13/07 Executive Director & Chief Engineer General Manager, Plant 1/23/08*

Interstate Environmental Operations Commission Entergy Nuclear Indian Point 311 West 43rd. Street, Suite 201 450 Broadway, Suite 1 P.O.

New York, NY 10036 Box 249 Buchanan, NY 10511-0249 Westchester County Health Dept Fred Dacimo 2/21/07 145 Huguenot Street, Fl. 8 Vice President 3/12/07 New Rochelle, NY 10801-5216 Entergy Nuclear Indian Point 4/19/07 450 Broadway, Suite 1 P.O. 5/18/07 Box 249 6/25/07 Buchanan, NY 10511-0249 7/18/07 8/22/07 9/20/07 10/22/07 11/14/07 Westchester County Health Dept Anthony Vitale 12/13/07 145 Huguenot Street, Fl. 8 General Manager, Plant 1/23/08*

New Rochelle, NY 10801-5216 Operations Entergy Nuclear Indian Point 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249

  • December 2007 Report Page 3

(b) Listed below are the recipients, transmitters and transmittal dates for the Indian Point Units 1, 2 and 3 operating data (daily electrical generations, circulating water flows, and intake and discharge circulating water temperatures) reports for calendar year 2006.

Recipient Transmitter Date NYSDEC - Division of Water Fred Dacimo 4/19/07 625 Broadway, 4 th Floor Vice President 7/18/07 Albany, NY 12233-3506 Entergy Nuclear Indian Point 10/22/07 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249 NYSDEC - Division of Water Anthony Vitale 1/23/08*

625 Broadway, 4th Floor General Manager, Plant Albany, NY 12233-3506 Operations Entergy Nuclear Indian Point 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249 New York State DEC Fred Dacimo 4/19/07 Regional Engineer - Region 3 Vice President 7/18/07 100 Hillside Avenue, Suite 1W Entergy Nuclear Indian Point 10/22/07 White Plains, NY 10601-2860 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249 New York State DEC Anthony Vitale 1/23/08*

Regional Engineer - Region 3 General Manager, Plant 100 Hillside Avenue, Suite 1W Operations White Plains, NY 10601-2860 Entergy Nuclear Indian Point 450 Broadway, Suite 1 P.O.

Box 249 Buchanan, NY 10511-0249

  • Fourth Quarter 2007 Report Page 4