NL-08-0305, ISFSI Annual Radioactive Effluent Release Report

From kanterella
Jump to navigation Jump to search
ISFSI Annual Radioactive Effluent Release Report
ML080630358
Person / Time
Site: Hatch, Farley, 07200042, 07200036  Southern Nuclear icon.png
Issue date: 03/01/2008
From: Godfrey J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-0305
Download: ML080630358 (2)


Text

Southern Nuclear Operating Company. Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\\

COMPANY Energy to Serve Your World SM March 1, 2008 Docket Nos.: 50-348 50-321 NL-08-0305 50-364 50-366 (Corrected Copy) 72-42 72-36 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Edwin I. Hatch Nuclear Plant ISFSI Annual Radioactive Effluent Release Report Ladies and Gentlemen:

In accordance with 10 CFR 72.44(d)(3), Southern Nuclear Operating Company (SNC) hereby submits the annual report specifying the quantity of each of the principal radionuclides released to the environment in liquid and gaseous effluents during the period of operation of the Independent Spent Fuel Storage Installation (ISFSI) in the previous calendar year at Farley Nuclear Plant (FNP) and Hatch Nuclear Plant (HNP).

By the design of the seal welded storage canisters of the ISFSI, there are no plausible effluent release pathways. Periodic surveillances and radiological surveys of and around the facilities performed during the year confirm that the canister and overpack asse'mblies are performing as designed. The effluent releases from the ISFSI at FNP and HNP for the 2007 calendar year are zero.

This letter contains no NRC commitments. If you have any questions, please advise.

~:i/;£c1j h~rey Manager, Environmental A airs JMGnwS/phr

U.S. Nuclear Regulatory Commission NL-08-0305 Page 2 cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; CHA02.004; LC# 14732 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Ms. K. R. Cotton, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. S. P. Lingam, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle