NL-08-0209, Nuclear Property Insurance Coverage as of April 1, 2008

From kanterella
Jump to navigation Jump to search
Nuclear Property Insurance Coverage as of April 1, 2008
ML080590558
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 02/28/2008
From: David Jones
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-0209
Download: ML080590558 (2)


Text

David H. Jones Southern Nuclear Vice President Operating Company, Inc.

Engineering 40 Inverness Center Parkway Birmingham, Alabama 35242 Tel 205.992.5984 Fax 205.992.0341 SOUTHERNA February 28, 2008 COMPANY Energy to Serve lOur World'"

Docket Nos.: 50-321 50-348 50-424 NL-08-0209 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Nuclear Property Insurance Coverage as of April 1! 2008 Ladies and Gentlemen:

In accordance with the nuclear property insurance reporting requirement specified in 10 CFR 50.54 (w)(3), the current levels and sources of insurance on Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant are hereby submitted.

The policies held by Alabama Power Company and Georgia Power Company (including the co-owner licensees as the insured), respectively, are:

Primary Coverage Insurance Nuclear Electric Insurance $500,000,000 Ltd. - NEIL Primary Property Policy No.: Farley: P08-001, Hatch: P08-023, Vogtle: P08-024 Excess Coverage Nuclear Electric Insurance $2,250,000,000 Ltd. - NEIL Excess Property in excess of

$500,000,000 Policy No.: Farley: X08-001, Hatch: X08-018, Vogtle: X08-074 The policies listed above provide a total nuclear property coverage limit of

$2,750,000,000 for each site.

U. S. Nuclear Regulatory Commission NL-08-0209 Page 2 This letter contains no NRC commitments. If you have any questions, please advise.

D. H. Jon Vice President - Engineering cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison., Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054 CHA02.004 CVC7000; LC# 14726 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Ms. K. R. Cotton, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. S. P. Lingam, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle