ML071270281
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 04/30/2007
From: George B
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-07-0835
Download: ML071270281 (2)


Text

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 April 30, 2007 SOUTHERN Ei COMPANY Energy to Serve Your Worlds" Docket Nos.: 50-321 50-348 50-424 NL-07-0835 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Quality Assurance Topical Report Response to Request for Additional Information Ladies and Gentlemen:

By SNC letter NL-06-2352, dated June 29, 2006, Southern Nuclear Operating Company (SNC) submitted the Quality Assurance Topical Report (QATR) for the SNC fleet of plants which includes the Edwin I. Hatch Nuclear Plant (HNP), the Joseph M. Farley Nuclear Plant (FNP), and the Vogtle Electric Generating Plant (VEGP). On February 1, 2007, the NRC provided a draft request for additional information (RAI) necessary to make a determination regarding acceptability of the proposed SNC QATR. The NRC provided a formal submittal of the RAI by letter dated February 22, 2007. The SNC response to the RAI is provided in Enclosure 6.

Enclosure I of this submittal provides Version Ob of the proposed SNC QATR.

Enclosure 2 provides a description of the proposed change and the bases for concluding the revised quality assurance program described in the proposed QATR continues to meet the requirements of 10 CFR 50, Appendix B. Enclosure 3 provides a comparison of the existing FNP, HNP, and VEGP quality assurance programs to the quality assurance program described in the proposed QATR. Enclosures 4 and 5 provide a matrix describing SNC conformance to ASME NQA-1-1994 and ANSI NI 8.7-1976, respectively. These enclosures have been revised to reflect the SNC response to the NRC RAI with insertions identified by red underlined text and deletions identified by red strikethrough text. Enclosures 1, 2, 3, 4, and 5 supersede the corresponding enclosures provided with the June 29, 2006, submittal in their entirety. The FSAR markups provided in Enclosure 6 of the June 29, 2006 submittal are not impacted by the proposed changes and remain valid. Accordingly, FSAR markups are not provided in this submittal.

&ol-

U. S. Nuclear Regulatory Commission NL-07-0835 Page 2 If you have any questions, please advise.

Sincerely, B. J. George Manager, Nuclear Licensing BJG/TWS/phr

Enclosures:

1. SNC Quality Assurance Topical Report (Version Ob)
2. Description of Proposed Changes/Bases for Concluding the Revised Program Continues to Satisfy 10 CFR 50, Appendix B
3. Existing QA Programs vs. QATR Comparison Matrix
4. ASME NQA-I -1994 Conformance Matrix
5. ANSI N 18.7-1976 Conformance Matrix
6. Response to NRC Request for Additional Information cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison., Vice President- Hatch Mr. T. E. Tynan, Vice President - Vogtle RType: CFA04.054; CHA02.004; CVC7000; LC# 14573 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Ms. K. R. Cotton, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. B. K. Singal, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. D. S. Simpkins, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector- Vogtle