NL-05-0038, December 2004 Monthly Operating Reports for Vogtle Electric Generating Plant
| ML050130222 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/10/2005 |
| From: | Grissette D Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-05-0038 | |
| Download: ML050130222 (3) | |
Text
-
Don E. Grissette Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.6474 Fax 205.992.0341 January 10, 2005 SOUTHERNA COMPANY Energy to Serve Your World '
NL-05-0038 Docket Nos.:
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the December 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Sincerely, Don E. Grissette DEG/TDH/daj
Enclosures:
- 1. VEGP Unit I Monthly Operating Report
- 2. VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle ie/ 3_q
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME Va DATE Jai COMPLETED BY Tir TELEPHONE REPORTING PERIOD:
-424 ogue, 1 nuary 07, 2005 m Huc~man 6-826-3208 December 2004
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 1,169.00 1.152.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 879,948.00 Yr-to-Date 8,751.18 8,694.63 0.00 10,162,267.00 Cumulative 139,082.01 137,415.90 0.00 154,658,567.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- Unit 1 was at approximately 100% power with no significant operating problems during the month of December 2004. There were no challenges to the Pressurizer PORV's and Pressurizer Safety Valves.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
El -1
OPERATING DATA REPORT DOCKET NO.
50-425 UNIT NAME Vogtle 2 DATE January 07, 2005 COMPLETED BY TIM Ruckman TELEPHONE 706-826-3208 REPORTING PERIOD:
December 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,169.00 1,149.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 878,441.00 Yr-to-Date 8,053.82 7,972.87 0.00 9,168,690.00 Cumulative 124,942.42 123,944.07 0.00 140,116,698.0 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- Unit 2 was at approximately 100% power with no significant operating problems during the month of December 2004. There were no challenges to the Pressurizer PORV's and Pressurizer Safety Valves.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
E2 -1