NL-04-1945, September 2004 Monthly Operating Reports for Vogtle Electric Generating Plant

From kanterella
Jump to navigation Jump to search
September 2004 Monthly Operating Reports for Vogtle Electric Generating Plant
ML042920060
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/13/2004
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-04-1945
Download: ML042920060 (3)


Text

Jeffrey T. Gasser Executive Vice President and Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.6165 4

SOUTHERN EA COMPANY Energy to Serve YourWorld' NL 1945 October 13, 2004 Docket Nos.:

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the September 2004 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, J

ey T. Gasser JTG/DWM/daj

Enclosures:

El - VEGP Unit 1 Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle CS~- J

OPERATING DATA REPORT DOCKET NO.

50-424 UNIT NAME Vogtle 1 DATE October 05, 2004 COMPLETED BY Tim A. Ruckman TELEPHONE (706) 826-3208 REPORTING PERIOD:

September 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,1 69.00 1,1 52.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 837,168.00 Yr-to-Date 6,542.18 6,485.63 0.00 7,563,088.00 Cumulative 136,873.01 135,206.90 0.00 152,059,388.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Unit 1 was at 100% power with no significant operating problems during the month of September 2004.

There were no challenges to the Pressurizer PORV's and Pressurizer Safety Valves.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

El - 1

OPERATING DATA REPORT 1-425 DOCKET NO.

50 UNIT NAME Vi DATE U

COMPLETED BY Tfr TELEPHONE 7

REPORTING PERIOD:

'ogtle 2

,tober 05, 2004 in A. Ruckman

06) 826-3208 September 2004
1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,169.00 1,149.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 837,309.00 Yr-to-Date 5,881.59 5,812.20 0.00 6,676,446.00 Cumulative 122,770.19 121,783.40 0.00 137,624,454.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Unit 2 was at 100% power with no significant operating problems during the month of September 2004.

There were no challenges to the Pressurizer PORV's and Pressurizer Safety Valves.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

E2 - 1