NL-04-1253, June 2004 Monthly Operating Report for Vogtle Electric Generating Plant
| ML042010126 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/14/2004 |
| From: | Gasser J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-04-1253 | |
| Download: ML042010126 (5) | |
Text
Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 July 14, 2004 SOUTHERN A COMPANY Enerv to Serve Your World' NL-0-1 253 Docket Nos.:
50-424 50-425 U. S. Nuclear Regulatory Commission A'TTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the June 2004 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Sincerely, Jeffrey T. Gasser JTG/TDH/daj
Enclosures:
El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle e:: e z-1q
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 July 1, 2004 Andrew R. Cato (706) 826-3823 Dm~ating Satus
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
June 2004 1169 1152 This Month Year-To-Date Cumulative 4.
5.
6.
7.
Number Of Hours Reactor Was Critical:
Hours Generator On Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWHe):
720.0 720.0 0.0 833,559 4334.2 4277.6 0.0 5.004,309 134,665.1 132,998.9 0.0 149,500.609 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N1A NIA N/A El-1
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT I July 1, 2004 Andrew R. Cato (706) 826-3823 Reporting Period:
June 2004 Type Method of Cause/
F: Forced Duration Shutting Corrective Actions No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A NA N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F -Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE CORRECTIVE ACTION:
CRITICAL PATH WAS-NARRATIVE REPORT June 01 00:00 Unit I at 100% power with no significant operating problems.
June 30 23:59 Unit 1 at 100% power with no significant operating problems.
E1-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 July 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
June 2004 1169 1149 ThisIMonth Year-To-Date Cumulati
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
720.0 720.0 0.0 836.025 3686.5 3625.2 0.0 4,197.282 120,575.2 119,596.4 0.0 135.145,290 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description NIA NIA NIA E2-1
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 July 1 2004 Andrew R. Cato (706) 826-3823 Reporting Period:
June 2004 (1) REASON:
A - Equipment Failure (Explain)
E - Operator Training/License Examination B - Maintenance or Test F - Administrative C - Refueling G - Operational Error (Explain)
D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT (2) METHOD:
- 1. Manual
- 4. Continuation
- 2. Manual Trip/Scram
- 5. Other
- 3. Automatic Trip/Scram CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT June 01 00:00 Unit 2 at 100% power with no significant operating problems.
June 30 23:59 Unit 2 at 100% power with no significant operating problems.
E2-2