NL-04-1253, June 2004 Monthly Operating Report for Vogtle Electric Generating Plant

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Vogtle Electric Generating Plant
ML042010126
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/14/2004
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-04-1253
Download: ML042010126 (5)


Text

Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 July 14, 2004 SOUTHERN A COMPANY Enerv to Serve Your World' NL-0-1 253 Docket Nos.:

50-424 50-425 U. S. Nuclear Regulatory Commission A'TTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the June 2004 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, Jeffrey T. Gasser JTG/TDH/daj

Enclosures:

El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle e:: e z-1q

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 July 1, 2004 Andrew R. Cato (706) 826-3823 Dm~ating Satus

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

June 2004 1169 1152 This Month Year-To-Date Cumulative 4.

5.

6.

7.

Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

720.0 720.0 0.0 833,559 4334.2 4277.6 0.0 5.004,309 134,665.1 132,998.9 0.0 149,500.609 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N1A NIA N/A El-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT I July 1, 2004 Andrew R. Cato (706) 826-3823 Reporting Period:

June 2004 Type Method of Cause/

F: Forced Duration Shutting Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A NA N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F -Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE CORRECTIVE ACTION:

CRITICAL PATH WAS-NARRATIVE REPORT June 01 00:00 Unit I at 100% power with no significant operating problems.

June 30 23:59 Unit 1 at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 July 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

June 2004 1169 1149 ThisIMonth Year-To-Date Cumulati

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

720.0 720.0 0.0 836.025 3686.5 3625.2 0.0 4,197.282 120,575.2 119,596.4 0.0 135.145,290 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description NIA NIA NIA E2-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 July 1 2004 Andrew R. Cato (706) 826-3823 Reporting Period:

June 2004 (1) REASON:

A - Equipment Failure (Explain)

E - Operator Training/License Examination B - Maintenance or Test F - Administrative C - Refueling G - Operational Error (Explain)

D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT (2) METHOD:

1. Manual
4. Continuation
2. Manual Trip/Scram
5. Other
3. Automatic Trip/Scram CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT June 01 00:00 Unit 2 at 100% power with no significant operating problems.

June 30 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2