Annual Radiation Exposure Monitoring and Statistical Summary Report
ML041320482
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/29/2004
From: Conroy P
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, NRC/FSME
References
NL-04-049
Download: ML041320482 (7)


Text

- En tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 PO. Box 249 Buchanan, NY 10511-0249 April 29, 2004 NL-04-049 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001

Subject:

Indian Point Nuclear Power Plants Units 1, 2 and 3 Docket Nos. 50-3, 50-247, 50-286 2003 Annual Radiation Exposure Monitoring and Statistical Summary Report Dear Sir; Attached is the annual statistical summary report of personnel monitoring at Indian Point Unit Nos. 1, 2, and 3 for calendar year 2003, period January 1, 2003 to December 31, 2003. This report is submitted pursuant to Indian Point Technical Specifications 5.6.1.

The subject report provides a tabulation on an annual basis of the number of station, utility and other personnel, including contractors, receiving exposures greater than 100 mrem/yr. and their associated man rem exposure according to work and job functions.

Entergy Nuclear Operations, Inc. is making no new commitments in this letter.

If you have any questions regarding this matter, please contact Mr. Patric W. Conroy, Licensing Manager, Indian Point Energy Center at (914) 743-6668.

Very truly yours, atric W Conroy Manager Licensing Indian Point Energy Center Enclosure cc: See next page

Docket Nos. 50-3, 50-247, 50-286 NL-04-049 Page 2 of 2 cc:

Mr. Hubert J. Miller Regional Administrator - Region 1 U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Senior Resident Inspector Indian Point Unit 2 P. 0. Box 59 Buchanan, NY 10511-0059 U. S. Nuclear Regulatory Commission Resident Inspector's Office Indian Point Unit 3 P. 0. Box 337 Buchanan, NY 10511-0337

ENCLOSURE TO NL-04-049 2003 ANNUAL RADIATION EXPOSURE MONITORING AND STATISTICAL

SUMMARY

REPORT ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT UNIT 1, 2, and 3 NUCLEAR POWER PLANTS DOCKET Nos. 50-03, 50-247, and 50-286

ENTERGY NUCLEAR NORTHEAST /

INDIAN POINT 1 & 2 ANNUAL REPORT Year of 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 03-09-2004 Page All Personnel I

Total Man-Rem Station Utility I

Contractors Station Utility l

Contractors Work & Job Function l Employees Employees and Others Employees Employees and Others REACTOR OPERATION + SURVEIL

-MAINTENANCE 50 0

69 0.394 0.000 0.058

-OPERATIONS PERSONNEL 249 0

181 4.600 0.000 0.076

-HEALTH PHYSICS 37 0

26 1.834 0.000 0.076

-SUPERVISORY PERSONNEL 58 1

46 0.103 0.000 0.025

-ENGINEERING PERSONNEL 32 1

66 0.031 0.000 0.024 ROUTINE MAINTENANCE

-MAINTENANCE 119 0

120 1.762 0.000 0.734

-OPERATIONS PERSONNEL 78 0

11 0.942 0.000 0.038

-HEALTH PHYSICS 21 0

10 0.402 0.000 0.246

-SUPERVISORY PERSONNEL 30 0

12 0.082 0.000 0.010

-ENGINEERING PERSONNEL 36 0

26 0.096 0.000 0.086 INSERVICE INSPECTION

-MAINTENANCE 13 0

8 0.098 0.000 0.024

-OPERATIONS PERSONNEL 10 0

6 0.005 0.000 0.005

-HEALTH PHYSICS 1

0 0

0.003 0.000 0.000

-SUPERVISORY PERSONNEL 5

0 3

0.005 0.000 0.002

-ENGINEERING PERSONNEL 82 1

49 0.134 0.000 0.028 SPECIAL MAINTENANCE

-MAINTENANCE 18 0

12 0.036 0.000 0.001

-OPERATIONS PERSONNEL 8

0 5

0.002 0.000 0.001

-HEALTH PHYSICS 2

0 2

0.000 0.000 0.000

-SUPERVISORY PERSONNEL 11 0

9 0.004 0.000 0.004

-ENGINEERING PERSONNEL 26 0

6 0.027 0.000 0.001 WASTE PROCESSING

-MAINTENANCE 36 0

65 1.601 0.000 1.318

-OPERATIONS PERSONNEL 11 0

3 0.130 0.000 0.015

-HEALTH PHYSICS 21 0

12 0.236 0.000 0.726

-SUPERVISORY PERSONNEL 4

0 10 0.051 0.000 0.025

-ENGINEERING PERSONNEL 17 0

9 0.028 0.000 0.441 REFUELING

-MAINTENANCE 9

0 0

0.021 0.000 0.000

-OPERATIONS PERSONNEL 0

0 0

0.000 0.000 0.000

-HEALTH PHYSICS 1

0 0

0.004 0.000 0.000

-SUPERVISORY PERSONNEL 0

0 0

0.000 0.000 0.000

-ENGINEERING PERSONNEL 0

0 0

0.000 0.000 0.000

ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 3 ANNUAL REPORT Year of 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 03-09-2004 Page 2

I All Personnel I

Total Man-Rem I

I I

Station I

Utility I

Contractors 11 Station I

Utility I

Contractors I

I Work & Job Function I

Employees I Employees I

and Others II Employees I

Employees I

and Others TOTALS

-OPERATIONS PERSONNEL

-HEALTH PHYSICS

-SUPERVISORY PERSONNEL

-ENGINEERING PERSONNEL

-MAINTENANCE 375 838 167 76 203 7

85 12 8

28 840 333 171 16 48 16.680 13.827 8.307 2.094 1.775 0.021 1.610 0.807 0.046 0.112 56.392 2.894 9.214 0.027 0.935 GRAND TOTALS 1659 140 1408 42.683 2.596 69.463

ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 3 ANNUAL REPORT Year of 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 03-09-2004 Page All Personnel I

Total Man-Rem Station Utility l Contractors I

Station Utility Contractors Work & Job Function l

Employees l Employees and Others Employees l

Employees and Others ROUTINE MAINTENANCE

-OPERATIONS PERSONNEL 10 2

4 0.007 0.001 0.003

-HEALTH PHYSICS 178 16 8

1.126 0.411 0.001

-SUPERVISORY PERSONNEL 7

0 0

0.008 0.000 0.000

-ENGINEERING PERSONNEL 15 2

1 0.022 0.000 0.000

-MAINTENANCE 10 0

2 0.005 0.000 0.000 INSERVICE INSPECTION

-OPERATIONS PERSONNEL 161 1

276 2.780 0.003 1.349

-HEALTH PHYSICS 343 35 268 2.087 0.151 0.149

-SUPERVISORY PERSONNEL 64 5

69 2.054 0.296 0.320

-ENGINEERING PERSONNEL 25 3

13 0.256 0.008 0.000

-MAINTENANCE 88 11 12 0.210 0.015 0.017 SPECIAL MAINTENANCE

-OPERATIONS PERSONNEL 0

0 0

0.000 0.000 0.000

-HEALTH PHYSICS 0

0 0

0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0

0 0

0.000 0.000 0.000

-ENGINEERING PERSONNEL 0

0 0

0.000 0.000 0.000

-MAINTENANCE 0

0 0

0.000 0.000 0.000 WASTE PROCESSING

-OPERATIONS PERSONNEL 23 0

13 0.051 0.000 0.013

-HEALTH PHYSICS 26 1

2 0.098 0.012 0.013

-SUPERVISORY PERSONNEL 24 2

16 0.093 0.007 0.095

-ENGINEERING PERSONNEL 8

0 0

0.007 0.000 0.000

-MAINTENANCE 2

0 0

0.002 0.000 0.000 REFUELING

-OPERATIONS PERSONNEL 0

0 1

0.000 0.000 0.313

-HEALTH PHYSICS 1

0 0

0.045 0.000 0.000

-SUPERVISORY PERSONNEL 0

0 0

0.000 0.000 0.000

-ENGINEERING PERSONNEL 0

0 0

0.000 0.000 0.000

-MAINTENANCE 0

0 0

0.000 0.000 0.000 REACTOR OPERATION + SURVEIL

-OPERATIONS PERSONNEL 181 4

546 13.842 0.018 54.714

-HEALTH PHYSICS 290 33 55 10.470 1.036 2.731

-SUPERVISORY PERSONNEL 72 5

86 6.151 0.504 8.799

-ENGINEERING PERSONNEL 28 3

2 1.809 0.038 0.027

-MAINTENANCE 103 17 34 1.559 0.096 0.918

ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 1 & 2 ANNUAL REPORT Year of 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 03-09-2004 Page 2

I I

All Personnel 11 Total Man-Rem I

I I

Station I

Utility I

Contractors 11 Station I

Utility I

Contractors I

I Work & Job Function I

Employees I Employees I

and Others 11 Employees I

Employees I

and Others TOTALS

-MAINTENANCE 245 0

274 3.913 0.000 2.136

-OPERATIONS PERSONNEL 356 0

206 5.679 0.000 0.135

-HEALTH PHYSICS 83 0

50 2.479 0.000 1.049

-SUPERVISORY PERSONNEL 108 1

80 0.245 0.000 0.065

-ENGINEERING PERSONNEL 193 2

156 0.317 0.000 0.581 GRAND TOTALS 985 3

766 12.632 0.001 3.966