January 2004 Monthly Operating Report for Vogtle Electric Generating Plant
ML040490206
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/16/2004
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-04-0201
Download: ML040490206 (5)


Text

.;

Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve YourWorld' February 16, 2004 Docket Nos.:

50424 50425 NL-04-0201 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the January 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, Jeffrey T. Gasser JTG/TDH

Enclosures:

El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. W. F. Kitchens, General Manager-Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Repulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. S. D. Bloom, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 February 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

January 2004 1169 1152 This Month Year To Date

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

744.0 744.0 0.0 884,869 744.0 744.0 0.0 884,869 Cumulative 131,074.9 129,465.3 0.0 145,381,169 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A E1-1

fil,,

I UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 February 1. 2004 Andrew R. Cato (706) 826-3823 Reporting Period:

January 2004 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A NIA N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT January 01 00:00 Unit at 100% power with no significant operating problems.

January31 23:59 Unit at 100% power with no significant operating problems.

EI-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 February 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

January 2004 1169 1149 This Month Year To Date Cumulative

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

744.0 739.7

- 0.0 873,740 744.0 739.7 0.0 873,740 117,632.6 116,710.9 0.0 131,821,748 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A E2-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 February 1. 2004 Andrew R. Cato (706) 826-3823 Reporting Period:

January 2004 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments 2004-01 04/01/31 S

4.3 B

5 See Below (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F -Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTION/COMMENTS:

EVENT 200401 CAUSE:

Planned Maintenance Derate with Generator off-line to repair hydrogen leak on Generator CORRECTIVE ACTION:

Repairing Generator Hydrogen leak.

CRITICAL PATH WAS:

Repairing Generator Hydrogen leak and synchronizing the generator back to the grid.

NARRATIVE REPORT January01 00:00 Unit at 100% power with no significant operating problems.

January31 13:00 Unit began planned derate to approximately 30% power for hydrogen leak on generator.

January 31 19:43 Generator was taken off line for planned maintenance.

January 31 23:59 Unit at 30% power with planned maintenance in progress on the generator.

E2-2