NL-04-0201, January 2004 Monthly Operating Report for Vogtle Electric Generating Plant
| ML040490206 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/16/2004 |
| From: | Gasser J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-04-0201 | |
| Download: ML040490206 (5) | |
Text
.;
Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve YourWorld' February 16, 2004 Docket Nos.:
50424 50425 NL-04-0201 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the January 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Sincerely, Jeffrey T. Gasser JTG/TDH
Enclosures:
El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. W. F. Kitchens, General Manager-Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Repulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. S. D. Bloom, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 February 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
January 2004 1169 1152 This Month Year To Date
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
744.0 744.0 0.0 884,869 744.0 744.0 0.0 884,869 Cumulative 131,074.9 129,465.3 0.0 145,381,169 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E1-1
fil,,
I UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 February 1. 2004 Andrew R. Cato (706) 826-3823 Reporting Period:
January 2004 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A NIA N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTION/COMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT January 01 00:00 Unit at 100% power with no significant operating problems.
January31 23:59 Unit at 100% power with no significant operating problems.
EI-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 February 1. 2004 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
January 2004 1169 1149 This Month Year To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
744.0 739.7
- 0.0 873,740 744.0 739.7 0.0 873,740 117,632.6 116,710.9 0.0 131,821,748 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E2-1
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 February 1. 2004 Andrew R. Cato (706) 826-3823 Reporting Period:
January 2004 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Comments 2004-01 04/01/31 S
4.3 B
5 See Below (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F -Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTION/COMMENTS:
EVENT 200401 CAUSE:
Planned Maintenance Derate with Generator off-line to repair hydrogen leak on Generator CORRECTIVE ACTION:
Repairing Generator Hydrogen leak.
CRITICAL PATH WAS:
Repairing Generator Hydrogen leak and synchronizing the generator back to the grid.
NARRATIVE REPORT January01 00:00 Unit at 100% power with no significant operating problems.
January31 13:00 Unit began planned derate to approximately 30% power for hydrogen leak on generator.
January 31 19:43 Generator was taken off line for planned maintenance.
January 31 23:59 Unit at 30% power with planned maintenance in progress on the generator.
E2-2