NL-04-004, December 2003 Monthly Operating Report for Indian Point, Units 2 and 3

From kanterella
(Redirected from NL-04-004)
Jump to navigation Jump to search
December 2003 Monthly Operating Report for Indian Point, Units 2 and 3
ML040200250
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/15/2004
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NL-04-004
Download: ML040200250 (4)


Text

Entergy Nuclear Northeast

-E t Indian Point Energy Center 295 Broadway, Suite 1

-- Entergy PO. Box 249 Buchanan, NY 10511-0249 Tel 9147345340 Fax 914 734 5718 Fred Dacimo Vice President, Operations January 15, 2004 Re: Indian Point, Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-004 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1 -17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for December 2003

Reference:

1) NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," dated May 15,1997.

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of December 2003 for Indian Point Units 2 and 3.

Please be advised that this letter starts the submittal under one cover letter of monthly operating data for both Indian Point operating units and the report format is in accordance with the new INPO Consolidated Data Entry (CDE) process. The CDE process uses the NRC Generic Letter 97-02 reduced data format (Reference 1). There are no new commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. T. R. Jones, Manager, Licensing, Indian Point Energy Center at (914) 734-6670.

Sincerely, ed R. Dacimo Vice President, Operations Indian Point Energy Center I c--,,; C4-

Docket Nos. 50-247 and 50-286 NL-04-004 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223

OPERATING DATA REPORT NL-04-004 Attachment 1 DOCKET NO. 50-247 UNIT NAME 4ndian Point 2 (Unit)

DATE January 07, 2004 COMPLETED BY Tom Orlando TELEPHONE (914) 736-8340 REPORTING PERIOD: December 2003

1. Design Electrical Rating 993.00
2. Maximum Dependable Capacity (MWe-Net) 956.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 8,664.86 183,166.48
4. Number of Hours Generator On-line 744.00 8,598.65 179,170.95
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 736,873.00 8,370,814.00 152,150,286.0

-UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation

-E Operator Training & License Examination 5 Other (Explain)

F Administration

  • G Operational Error (Explain)

H Other (Explain)

SUMMARY

Indian Point Unit 2 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a net electrical energy generation of 736,873 MWH. On December 1, at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, power was reduced to approximately 97.6%. This evolution was a result of a loss of letdown that was triggered during removal of fuses to valve PCV-1229, which caused closure of IA-1228. At 2236 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.50798e-4 months <br />, fuses were installed for valve PCV-1 229 and IA-1228 reopened and conditions were returned to normal. Power reduction was secured at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />, and full power restored at 2346 hours0.0272 days <br />0.652 hours <br />0.00388 weeks <br />8.92653e-4 months <br />. The unit remained on line at full power for the remainder of the reporting period.

Page 1 of I

OPERATING DATA REPORT NL-04-004 Attachment 2 DOCKET NO. 50 -286 UNIT NAME Ini dian Point 3 (Unit)

DATE Ja nuary 07, 2004 COMPLETED BY To rm Orlando TELEPHONE _9714) 736-8340 REPORTING PERIOD: December 2003

1. Design Electrical Rating 979.00
2. Maximum Dependable Capacity (MWe-Net) 979.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 7,866.83 154,104.99
4. Number of Hours Generator On-line 744.00 7,749.33 151,157.18
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 741,314.00 7,608,438.00 135,645,312.0

-UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration . Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 6 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

Indian Point Unit 3 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a net generation of 741,314 MWH. Unplanned Energy Losses for December 2003, totaled 405.9 MWH due to the loss of 36 Circulating Water Pump (CWP). Planned Energy Losses totaling 150.9 MWH were caused by the unit not being at 100 % power and chemistry concerns (blowdown losses).

Page 1 of 1

Text

Entergy Nuclear Northeast

-E t Indian Point Energy Center 295 Broadway, Suite 1

-- Entergy PO. Box 249 Buchanan, NY 10511-0249 Tel 9147345340 Fax 914 734 5718 Fred Dacimo Vice President, Operations January 15, 2004 Re: Indian Point, Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-004 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1 -17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for December 2003

Reference:

1) NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," dated May 15,1997.

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of December 2003 for Indian Point Units 2 and 3.

Please be advised that this letter starts the submittal under one cover letter of monthly operating data for both Indian Point operating units and the report format is in accordance with the new INPO Consolidated Data Entry (CDE) process. The CDE process uses the NRC Generic Letter 97-02 reduced data format (Reference 1). There are no new commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. T. R. Jones, Manager, Licensing, Indian Point Energy Center at (914) 734-6670.

Sincerely, ed R. Dacimo Vice President, Operations Indian Point Energy Center I c--,,; C4-

Docket Nos. 50-247 and 50-286 NL-04-004 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223

OPERATING DATA REPORT NL-04-004 Attachment 1 DOCKET NO. 50-247 UNIT NAME 4ndian Point 2 (Unit)

DATE January 07, 2004 COMPLETED BY Tom Orlando TELEPHONE (914) 736-8340 REPORTING PERIOD: December 2003

1. Design Electrical Rating 993.00
2. Maximum Dependable Capacity (MWe-Net) 956.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 8,664.86 183,166.48
4. Number of Hours Generator On-line 744.00 8,598.65 179,170.95
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 736,873.00 8,370,814.00 152,150,286.0

-UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation

-E Operator Training & License Examination 5 Other (Explain)

F Administration

  • G Operational Error (Explain)

H Other (Explain)

SUMMARY

Indian Point Unit 2 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a net electrical energy generation of 736,873 MWH. On December 1, at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, power was reduced to approximately 97.6%. This evolution was a result of a loss of letdown that was triggered during removal of fuses to valve PCV-1229, which caused closure of IA-1228. At 2236 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.50798e-4 months <br />, fuses were installed for valve PCV-1 229 and IA-1228 reopened and conditions were returned to normal. Power reduction was secured at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />, and full power restored at 2346 hours0.0272 days <br />0.652 hours <br />0.00388 weeks <br />8.92653e-4 months <br />. The unit remained on line at full power for the remainder of the reporting period.

Page 1 of I

OPERATING DATA REPORT NL-04-004 Attachment 2 DOCKET NO. 50 -286 UNIT NAME Ini dian Point 3 (Unit)

DATE Ja nuary 07, 2004 COMPLETED BY To rm Orlando TELEPHONE _9714) 736-8340 REPORTING PERIOD: December 2003

1. Design Electrical Rating 979.00
2. Maximum Dependable Capacity (MWe-Net) 979.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 7,866.83 154,104.99
4. Number of Hours Generator On-line 744.00 7,749.33 151,157.18
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 741,314.00 7,608,438.00 135,645,312.0

-UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration . Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 6 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

Indian Point Unit 3 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a net generation of 741,314 MWH. Unplanned Energy Losses for December 2003, totaled 405.9 MWH due to the loss of 36 Circulating Water Pump (CWP). Planned Energy Losses totaling 150.9 MWH were caused by the unit not being at 100 % power and chemistry concerns (blowdown losses).