NL-03-1708, July 2003 Monthly Operating Report for Vogtle

From kanterella
Jump to navigation Jump to search
July 2003 Monthly Operating Report for Vogtle
ML032310206
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/15/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-1708
Download: ML032310206 (5)


Text

Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve Your Worldi NL-03-1708 August 15, 2003 Docket Nos.:

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the July 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

Sincerely, 4 e 1 I JeffreyT.

asser JTG/NJS

Enclosures:

I I

El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle IDr62J(

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50 424 VEGP UNIT 1 August 1, 2003 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

July 2003 1169 1152 This Month Year-To-Date Cumulative 4.

5.

6.

7.

Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

744.0 744.0 0.0 865,290 5048.4 5036.3 0.0 5,891,265 127,221.0 125,659.5 0.0 140,976,089 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A El-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 August 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:

July 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments NIA N/A N/A WA N/A N/A NIA (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT July 01 00:00 Unit 1 at 100% power with no significant operating problems.

July 31 23:59 Unit 1 at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 August 1, 2003 Andrew R. Cato (706) 826-3823 Operatinq Status 1.

2.

3.

Reporting Period:

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

July 2003 1169 1149 This Month Year-To-Date Cumulative 4.

5.

6.

7.

Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

744.0 744.0 0.0 862,639 5049.7 5036.7 0.0 5,824,649 113,493.5 112,605.6 0.0 127,036,015 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A E2-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50425 VEGP UNIT 2 August 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:

July 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F -Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT IJuly0 00:0Unit2at1%power withnosignificant operating problems.

July 31 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2