NL-03-1708, July 2003 Monthly Operating Report for Vogtle
| ML032310206 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/15/2003 |
| From: | Gasser J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-03-1708 | |
| Download: ML032310206 (5) | |
Text
Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve Your Worldi NL-03-1708 August 15, 2003 Docket Nos.:
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the July 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.
Sincerely, 4 e 1 I JeffreyT.
asser JTG/NJS
Enclosures:
I I
El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle IDr62J(
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50 424 VEGP UNIT 1 August 1, 2003 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
July 2003 1169 1152 This Month Year-To-Date Cumulative 4.
5.
6.
7.
Number Of Hours Reactor Was Critical:
Hours Generator On Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWHe):
744.0 744.0 0.0 865,290 5048.4 5036.3 0.0 5,891,265 127,221.0 125,659.5 0.0 140,976,089 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A El-1
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 August 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:
July 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Comments NIA N/A N/A WA N/A N/A NIA (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTIONICOMMENTS:
EVENT:
CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT July 01 00:00 Unit 1 at 100% power with no significant operating problems.
July 31 23:59 Unit 1 at 100% power with no significant operating problems.
E1-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 August 1, 2003 Andrew R. Cato (706) 826-3823 Operatinq Status 1.
2.
3.
Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
July 2003 1169 1149 This Month Year-To-Date Cumulative 4.
5.
6.
7.
Number Of Hours Reactor Was Critical:
Hours Generator On Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWHe):
744.0 744.0 0.0 862,639 5049.7 5036.7 0.0 5,824,649 113,493.5 112,605.6 0.0 127,036,015 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E2-1
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50425 VEGP UNIT 2 August 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:
July 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F -Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT:
CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT IJuly0 00:0Unit2at1%power withnosignificant operating problems.
July 31 23:59 Unit 2 at 100% power with no significant operating problems.