June 2003 Monthly Operating Report for Vogtle Electric Generating Plant
ML031960167
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/10/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-1501
Download: ML031960167 (5)


Text

Jeffrey I Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve Your World' NL-03-1501 July 10, 2003 Docket Nos.:

50424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the June 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

Sincerely, ey.

asser JTG/NJS

Enclosures:

E - VEGP Unit 1 Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle

,I 4

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50424 VEGP UNIT 1 July 1,2003 Andrew R Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

June 2003 1169 1152 This Month Year-To-Date Cumulative

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

720.0 720.0 0.0 840,578 4304.4 4292.3 0.0 5,025,975 126,477.0 124,915.5 0.0 140,110,799 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A NA E1-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50424 VEGP UNIT I July 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:

June 2003 Type Method of Cause/

F: Forced Duration Shutting Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS NARRATIVE REPORT June 01 00:00 Unit 1 at 100% power with no significant operating problems.

June 30 23:59 Unit 1 at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 July 1, 2003 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

June 2003 1169 1149 This Month Year-To-Date Cumulative

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

720.0 720.0 0.0 839,078 4305.7 4292.7 0.0 4,962,010 112,749.5 111,861.6 0.0 126,173,376 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N A E2-1

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 July 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:

June 2003 Type Method of Cause/

F: Forced Duration Shutting Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A NIA NIA N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Tralning/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT June 01 00:00 Unit 2 at 100% power with no significant operating problems.

June 30 23:59 Unit 2 at 100% power with no significant operating problems.

l E2-2