NL-03-1060, April 2003 Monthly Operating Report for Vogtle
| ML031350227 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/13/2003 |
| From: | Gasser J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-03-1060 | |
| Download: ML031350227 (5) | |
Text
Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Invemess Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve YourWorld' NL 1060 May 13, 2003 Docket Nos.:
50424 50425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the April 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.
Sincerely, Je e T. Gasser JTG/NJS
Enclosures:
El - VEGP Unit 1 Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle le2>F
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 May 1. 2003 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
April 2003 1169 1152 This Month 719.0 719.0 0.0 849,839 Year To Date 2879.0 2879.0 0.0 3,397,009 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES El-1 Cumulative 125,051.6 123,502.3 0.0 138,481,833 Date Tag No.
Event Description N/A N/A N/A
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
Reporting Period:
50-424 VEGP UNIT 1 May 1, 2003 Andrew R. Cato (706) 826-3823 April 2003 Type T
Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT April 01 00:00 Unit 1 at 100% power with no significant operating problems.
April 30 23:59 Unit I at 100% power with no significant operating problems.
E1-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 May 1, 2003 Andrew R. Cato (706) 826-3823 Operatina Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
April 2003 1169 1149 This Month
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
719.0 719.0 0.0 849,666 Year To Date 2841.7 2828.7 0.0 3,251,907 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 111,285.5 110,397.6 0.0 124,463,273 Date Tag No.
Event Description N/A N/A N/A
UNIT SHUTDOWNS Reporting Period:
Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 May 1, 2003 Andrew R. Cato (706) 826-3823 April 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT IApril 01 00:00 Unit 2 at 100% powerwith no significant operating problems.
April 30 23:59 Unit 2 at 100% power with no significant operating problems.
E2-2