Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Invemess Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve YourWorld' NL 1060 May 13, 2003 Docket Nos.:

50424 50425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the April 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

Sincerely, Je e T. Gasser JTG/NJS

Enclosures:

El - VEGP Unit 1 Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle le2>F

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 May 1. 2003 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

April 2003 1169 1152 This Month 719.0 719.0 0.0 849,839 Year To Date 2879.0 2879.0 0.0 3,397,009 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES El-1 Cumulative 125,051.6 123,502.3 0.0 138,481,833 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-424 VEGP UNIT 1 May 1, 2003 Andrew R. Cato (706) 826-3823 April 2003 Type T

Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT April 01 00:00 Unit 1 at 100% power with no significant operating problems.

April 30 23:59 Unit I at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 May 1, 2003 Andrew R. Cato (706) 826-3823 Operatina Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

April 2003 1169 1149 This Month

4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

719.0 719.0 0.0 849,666 Year To Date 2841.7 2828.7 0.0 3,251,907 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 111,285.5 110,397.6 0.0 124,463,273 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 May 1, 2003 Andrew R. Cato (706) 826-3823 April 2003 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT IApril 01 00:00 Unit 2 at 100% powerwith no significant operating problems.

April 30 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2