Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 Env 7y PRO. Box 249
-~
~,Tle1'fI1/Buchanan, NY 10511-0249 Fax 914 734 5718 Fred Dacimo Vice President, Operations April 25, 2003 NL-03-070 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001
Subject:
Indian Point Nuclear Power Plants Units 1, 2 and 3 Docket Nos. 50-3, 50-247, 50-286 2002 Annual Radiation Exposure Monitoring and Statistical Summary Report Dear Sir; Attached is the annual statistical summary report of personnel monitoring at Indian Point Unit Nos. 1, 2, and 3 for calendar year 2002, period January 1, 2002 to December 31, 2002. This report is submitted pursuant to Indian Point Technical Specifications 6.9.1.3 and 6.9.1.4 for Unit 2, and 5.6.1 for Unit 3. The subject report provides a tabulation on an annual basis of the number of station, utility and other personnel, including contractors, receiving exposures greater than 100 mrem/yr. and their associated man rem exposure according to work and job functions.
Entergy Nuclear Operations, Inc. is making no new commitments in this letter.
If you have any questions regarding this matter, please contact Mr. John McCann, Licensing Manager - Indian Point Energy Center at (914) 743-5074.
Very truly yours, rdRDacimo Vice President, Operations Indian Point Energy Center Attachment cc: See next page L~-7S (.
Docket Nos. 50-03, 247, 286 NL-03-070 Page 2 of 2 cc:
Mr. Hubert J. Miller Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspectors Office Indian Point Unit 3 U.S. Nuclear Regulatory Commission P.O. Box 337 Buchanan, NY 10511 Mr. Patrick Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2 Washington, DC 20555 Resident Inspectors Office Indian Point Unit 2 U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, NY 10511
ATTACHMENT TO NL-03-070 2002 ANNUAL RADIATION EXPOSURE MONITORING AND STATISTICAL
SUMMARY
REPORT Entergy Nuclear Operations, Inc.
Indian Point 1, 2, and 3 Nuclear Power Plants Docket Nos. 50-03, 247, and 286
ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 1 & 2 02-26-2003 Page ANNUAL REPORT Year of 2002 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel l l Total Man-Rem Station Utility l
Contractors Station l
Utility l
Contractors Work & Job Function Employees Employees l
and Others l
Employees l Employees and Others REACTOR OPERATION + SURVEIL
-MAINTENANCE 143 3
302 0.206 0.010 0.584
-OPERATIONS PERSONNEL 186 1
227 4.588 0.000 0.450
-HEALTH PHYSICS 58 0
50 2.119 0.000 0.689
-SUPERVISORY PERSONNEL 92 2
52 0.783 0.000 0.085
-ENGINEERING PERSONNEL 129 1
72 0.314 0.018 0.127 ROUTINE MAINTENANCE
-MAINTENANCE 201 3
637 9.860 0.083 102.583
-OPERATIONS PERSONNEL 83 0
15 1.658 0.000 2.388
-HEALTH PHYSICS 43 0
51 4.327 0.000 5.243
-SUPERVISORY PERSONNEL 44 0
18 1.524 0.000 2.096
-ENGINEERING PERSONNEL 88 3
57 3.655 0.012 8.753 INSERVICE INSPECTION
-MAINTENANCE 31 1
81 0.275 0.000 1.620
-OPERATIONS PERSONNEL 16 0
0 0.081 0.000 0.000
-HEALTH PHYSICS 11 0
6 0.048 0.000 0.047
-SUPERVISORY PERSONNEL 6
0 1
0.003 0.000 0.002
-ENGINEERING PERSONNEL 29 1
5 0.512 0.000 0.015 SPECIAL MAINTENANCE
-MAINTENANCE 1
0 0
0.000 0.000 0.000
-OPERATIONS PERSONNEL 0
0 0
0.000 0.000 0.000
-HEALTH PHYSICS 0
0 0
0.000 0.000 0.000
-SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000
-ENGINEERING PERSONNEL 0
0 0
0.000 0.000 0.000 WASTE PROCESSING
-MAINTENANCE 22 0
33 1.067 0.000 2.495
-OPERATIONS PERSONNEL 2
0 2
0.001 0.000 0.070
-HEALTH PHYSICS 12 0
11 0.167 0.000 0.374
-SUPERVISORY PERSONNEL 3
0 1
0.005 0.000 0.004
-ENGINEERING PERSONNEL 1
0 0
0.001 0.000 0.000 REFUELING
-MAINTENANCE 233 1
492 10.584 0.034 64.940
-OPERATIONS PERSONNEL 192 0
73 13.828 0.000 5.329
-HEALTH PHYSICS 62 0
84 11.810 0.000 11.994
-SUPERVISORY PERSONNEL 89 0
34 5.134 0.000 1.425
-ENGINEERING PERSONNEL 152 4
52 3.652 0.050 7.361
ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 1 & 2 ANNUAL REPORT Year of 2002 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 02-26-2003 Page 2
I I
All Personnel l l Total Man-Rem I
Station I
Utility I
Contractors l
Station I
Utility I
Contractors I
I Work & Job Function I
Employees I Employees I
and Others l l Employees I
Employees I
and Others TOTALS 172.222
-MAINTENANCE 631 8
1545 21.991 0.128
-OPERATIONS PERSONNEL 479 1
317 20.156 0.000 8.236
-HEALTH PHYSICS 186 0
202 18.471 0.000 18.347
-SUPERVISORY PERSONNEL 234 2
106 7.448 0.000 3.612
-ENGINEERING PERSONNEL 399 9
186 8.134 0.081 16.257 GRAND TOTALS 1929 20 2356 76.201 0.208 218.673
=================================================
ENTERGY NUCLEAR NORTHEAST / INDIAN POINT 3 ANNUAL REPORT Year of 2002 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 02-28-2003 Page 1
All Personnel I
Total Man-Rem Station Utility l
Contractors II Station Utility l
Contractors Work & Job Function l Employees Employees l
and Others Employees l
Employees l
and Others ROUTINE MAINTENANCE
-OPERATIONS PERSONNEL 9
0 2
0.017 0.000 0.000
-HEALTH PHYSICS 106 18 5
1.382 0.152 0.003
-SUPERVISORY PERSONNEL 6
0 0
0.052 0.000 0.000
-ENGINEERING PERSONNEL 12 4
0 0.032 0.004 0.000
-MAINTENANCE 5
0 2
0.003 0.000 0.001 INSERVICE INSPECTION
-OPERATIONS PERSONNEL 103 2
81 2.156 0.000 0.203
-HEALTH PHYSICS 223 31 267 1.360 0.042 0.088
-SUPERVISORY PERSONNEL 33 4
10 1.867 0.282 0.168
-ENGINEERING PERSONNEL 21 3
0 0.136 0.003 0.000
-MAINTENANCE 46 12 8
0.132 0.018 0.002 SPECIAL MAINTENANCE
-OPERATIONS PERSONNEL 0
0 0
0.000 0.000 0.000
-HEALTH PHYSICS 0
0 0
0.000 0.000 0.000
-SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000
-ENGINEERING PERSONNEL 0
0 0
0.000 0.000 0.000
-MAINTENANCE 0
0 0
0.000 0.000 0.000 WASTE PROCESSING
-OPERATIONS PERSONNEL 5
0 0
0.011 0.000 0.000
-HEALTH PHYSICS 4
0 1
0.011 0.000 0.001
-SUPERVISORY PERSONNEL 8
1 0
0.033 0.000 0.000
-ENGINEERING PERSONNEL 2
0 0
0.003 0.000 0.000
-MAINTENANCE 2
0 2
0.004 0.000 0.000 REFUELING
-OPERATIONS PERSONNEL 3
0 1
0.059 0.000 0.149
-HEALTH PHYSICS 2
0 0
0.049 0.000 0.000
-SUPERVISORY PERSONNEL 1
0 0
0.000 0.000 0.000
-ENGINEERING PERSONNEL 2
0 0
0.001 0.000 0.000
-MAINTENANCE 0
0 0
0.000 0.000 0.000 REACTOR OPERATION + SURVEIL
-OPERATIONS PERSONNEL 10 0
32 0.022 0.000 0.987
-HEALTH PHYSICS 2
0 2
0.001 0.000 0.131
-SUPERVISORY PERSONNEL 1
0 0
0.001 0.000 0.000
-ENGINEERING PERSONNEL 1
0 0
0.005 0.000 0.000
-MAINTENANCE 0
0 1
0.000 0.000 0.000
ENTERGY NUCLEAR NORTHEAST /
INDIAN POINT 3 ANNUAL REPORT Year of 2002 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION 02-28-2003 Page 2
I I
All Personnel I
Total Man-Rem I
I Station I
Utility I
Contractors 11 Station I
Utility I
Contractors I
I Work & Job Function I
Employees I Employees I
and Others ll Employees I
Employees I
and Others I
TOTALS
-OPERATIONS PERSONNEL 130 2
116 2.264 0.000 1.340
-HEALTH PHYSICS 337 49 275 2.802 0.194 0.223
-SUPERVISORY PERSONNEL 49 5
10 1.952 0.282 0.168
-ENGINEERING PERSONNEL 38 7
0 0.177 0.006 0.000
-MAINTENANCE 53 12 13 0.139 0.018 0.004
==
=======.....................=.=.===.=...........==.
GRAND TOTALS 607 75 414 7.335 0.500 1.735 ts.
=....