NL-02-081, Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
| ML021640729 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/10/2002 |
| From: | Dacimo F Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, NRC/FSME |
| References | |
| NL-02-081 | |
| Download: ML021640729 (3) | |
Text
En tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Indian Point Energy Center 295 Broadwvay, Suite 1 RO. Box 249 Bucdanan, NY 10511-0249 SAFEGUARDS INFORMATION June 10, 2002 Re:
Indian Point Unit No. 1 Docket No. 50-3 NL-02-081 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001
Subject:
Reference:
Entergy Nuclear Operations, Inc. - Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures for Indian Point Nuclear Generating Station, Unit 1 NRC letter to Michael Kansler from Samuel J. Collins dated May 23, 2002, regarding, "Issuance of Order for Interim Safeguards and Security Compensatory Measures for Indian Point Nuclear Generating Station, Unit 1"
Dear Sir:
Pursuant to the requirements of 10 CFR 50.4 the attachment to this letter contains Entergy Nuclear Operations, Inc.'s (ENO) responses to Section III, B and C of the Order. The attached response identifies the schedule dates for completion of the Order requirements based upon the currently available information. As required by the Order the actions to implement the Order have been started and will be completed no later than November 22, 2002. Attachment 1 to this response contains safeguards information, as defined in 10 CFR 73.21. ENO therefore requests that this attachment be withheld from public disclosure.
Pursuant to the requirements of 10 CFR 2.202, the answer to the Order is being transmitted to the Secretary of the Commission under separate cover.
As required by Condition C.2 of the Order, ENO will notify the Commission when full compliance has been achieved. contains "SAFEGUARDS INFORMATION." Upon separation of Attachment 1 from this letter it becomes "DECONTROLLED."
NOTICE:
P I
NL-02-081 Page 2 of 3 If you have any questions or require additional information, please contact Mr. John McCann, Manager, Nuclear Safety and Licensing at (914) 734-5074.
Very truly yours, Fred Dacimo Vice President - Operations
Attachment:
- 1. Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures Signed under oath and affirmation before me this /c!day of June 2002.
Notary Public EASIIA. B OVIERO WWiY PubWc, Btat of Now e**
N.OIAM6OO6689 Commss1W Expre March 20, 20 NOTICE: contains "SAFEGUARDS INFORMATION." Upon separation of Attachment 1 from this letter it becomes "DECONTROLLED."
NL-02-081 Page 3 of 3 cc:
Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 05-E-07 Washington, DC 20555-0001 Mr. Dennis C. Dambly Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Mail Stop 15-D-21 Washington, DC 20555-0001 Mr. Glenn Tracy U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 04A15 Rockville, MD 20852-2738 Mr. Hubert J. Miller Regional Administrator - Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick D. Milano, Senior Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Mr. John L. Minns, Project Manager Division of Licensing Project Management US Nuclear Regulatory Commission Mail Stop 7D1 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, NY 10511