ND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests

From kanterella
(Redirected from ND-24-0103)
Jump to navigation Jump to search
Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests
ML24117A351
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/26/2024
From: Leighty S
Southern Nuclear Operating Co
To: Andrea Veil
Office of Nuclear Reactor Regulation, Document Control Desk
References
ND-24-0103
Download: ML24117A351 (1)


Text

Southern Nuclear April 26, 2024 Docket No.:

52-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Steven Leighty Site Regulatory Affairs Manager Vogtle Units 3 & 4 7825 River Road Waynesboro, Georgia 30830 (706) 848-6790 tel ND-24-0103 10 CF 52.3 Southern Nuclear Operating Company Vogtle Electric Generating Plant (VEGP)- Unit 4 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests Ladies and Gentlemen:

The U.S. Nuclear Regulatory Commission (NRC) issued Combined License (COL) NPF-92 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR)

Section 52.97, "Issuance of combined licenses," on February 10, 2012.

License Condition 2.D.(5)(d) requires SNC to notify the Director of NRO, or the Director's designee, in writing, upon successful completion of the Power Ascension tests identified in Section 2.D.(5)(b) of this license. This letter is addressed to the Director of Nuclear Reactor Regulation due to the merger with the Office of New Reactors [Accession Number ML19329A059]. The Power Ascension tests have been successfully completed in accordance with UFSAR subsection 14.2.10.4 as required by License Condition 2.D.(5)(b).

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Will Garrett at (706) 848-7154.

Respectfully submitted, Steven Leighty Site Regulatory Affairs Manager Vogtle Units 3 & 4 SL/KJD/sfr

U. S. Nuclear Regulatory Commission ND-24-0103 Page 2 of 2 CC:

Regional Administrator, Region II Director, Office of Nuclear Reactor Regulation (NRR)

Director, Vogtle Project Office NRR Senior Resident Inspector-Vogtle 3 & 4