ND-22-0937, Combined License (COL) License Condition 2 .D.(4)(d) Completion of Initial Criticality and Low-Power Tests

From kanterella
(Redirected from ND-22-0937)
Jump to navigation Jump to search
Combined License (COL) License Condition 2 .D.(4)(d) Completion of Initial Criticality and Low-Power Tests
ML23066A269
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/07/2023
From: Coleman J
Southern Nuclear Operating Co
To: Andrea Veil
Office of Nuclear Reactor Regulation, Document Control Desk
References
ND-22-0937
Download: ML23066A269 (1)


Text

A Southern Nuclear Docket No.:

52-025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Jamie M. Coleman Regulatory Affairs Director Vogtle 3 &4 Southern Nuclear Operating Company Ladies and Gentlemen:

Vogtle Electric Generating Plant (VEGP) - Unit 3 Combined License (COL) License Condition 2.D.(4)(d)

Completion of Initial Criticality and Low-Power Tests 7825 River Road Waynesboro, Georgia 30830 706 848 6926 tel ND-22-0937 10 CFR 52.3 The U.S. Nuclear Regulatory Commission (NRC) issued Combined License (COL) NPF-91 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012.

License Condition 2.D.(4)(d) requires SNC to notify the Director of NRO, or the Director's designee, in writing, upon successful completion of the Initial Criticality and Low-Power tests identified in Section 2.D.(4)(b) of this license.

This letter is addressed to the Director of Nuclear Reactor Regulation due to the merger with the Office of New Reactors [Accession Number ML19329A059]. The Initial Criticality and Low-Power tests have been successfully completed in accordance with UFSAR subsections 14.2.10.2 and 14.2.10.3 as required by License Condition 2.D.(4 )(b).

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Will Garrett at (706) 848-7154.

Respectfully submitted, J~~

Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company JMC/KJD/sfr March 7, 2023

U.S. Nuclear Regulatory Commission ND-22-0937 Page 2 of 2 Regional Administrator, Region II Director, Office of Nuclear Reactor Regulation (NRR)

Director, Vogtle Project Office NRR Senior Resident Inspector-Vogtle 3 & 4