ND-20-0765, ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 (Index Number 483)

From kanterella
(Redirected from ND-20-0765)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 (Index Number 483)
ML20182A681
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/30/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0765
Download: ML20182A681 (7)


Text

^

Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 JUN 3 0 2020 Docket No.: 52-025 ND-20-0765 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 flndex Number 4831 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.15.03 [Index Number 483]. This ITAAC concludes that the displays Identified in Table 2.3.15-1 can be retrieved in the Main Control Room (MCR). The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Dii/ector Vogtle 3 & 4

Enclosure:

MJY/RAS/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC Item 2.3.15.03 [Index Number 483]

U.S. Nuclear Regulatory Commission ND-20-0765 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Belike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc; Nuclear Reaulatorv Commission M

M M

Ms. S. E. Temple M

M M

M Ms. N. C. Coovert M

M M

M M

M M

M M

M M

M M

M M

M

. W. Jones (w/o enclosures)

. C. P. Patel

. G. J. Khouri

. N. D. Karlovich

. A. Lerch

. C. J. Even

. B. J. Kemker C. Welch J. Gaslevic V. Hall G. Armstrong M. Webb T. Fredette S. Smith C. Santos

s. M. Bailey

. S. Rose

. B. Davis

. J. Vasquez

. J. Eargle Ms. K. Carrington P. Heher

. M. King E. Davidson

U.S. Nuclear Regulatory Commission ND-20-0765 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-0765 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-20-0765 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC Item 2.3.15.03 [index Number 483]

U.S. Nuclear Regulatory Commission ND-20-0765 Enclosure Page 2 of 4 ITAAC Statement Design Commitment

3. Displays of the parameters identified in Table 2.3.15-1 can be retrieved in the MCR.

Inspections. Tests. Analyses Inspection will be performed for retrievability of parameters in the MCR.

Acceptance Criteria The displays identified in Table 2.3.15-1 can be retrieved in the MCR.

ITAAC Determination Basis An inspection was performed to verify the retrievability of the Vogtle Electric Generating Plant (VEGP) Unit 3 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirms that the displays of the parameters identified in COL Appendix C Table 2.3.15-1 (Attachment A) can be retrieved in the MCR.

The inspection was performed in accordance with the Unit 3 component test package work order (Reference 1) for compressed and instrument air system (CAS) component indication verifications, and visually confirmed that when each of the displays of parameters identified in Attachment A was summoned at an MCR workstation, the summoned plant parameter appeared on a display monitor at that MCR workstation.

The Unit 3 component test results were reviewed (Reference 2) and confirmed that the VEGP Unit 3 plant parameter displays listed in Attachment A can be retrieved in the MCR.

Reference 2 is available for NRC inspection as part of Unit 3 ITAAC 2.3.15.03 Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.15.03, Unit 3 (Reference 3) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.15.03 was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-20-0765 Enclosure Page 3 of 4 References (available for NRG inspection)

1. SV3-CAS-T0W-SNC920957, "Compressed and Instrument Air System Indication Verification-ITAAC:SV3-2.3.15.03"
2. SV3-CAS-ITR-800483, Revision 0, Unit 3 CAS Parameters Displays in MCR (ITAAC#

2.3.15.03/Index# 483)

3. 2.3.15.03-U3-CP-Rev 0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-20-0765 Enclosure Page 4 of 4 Attachment A Table 2.21.15-1 Equipment Name Tag No.

Display Control Function Instrument Air Pressure CAS-011 Yes Note: Dash (-) indicates not applicable.