Unit 4 - Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02b (Index Number 770)
ML19301D255
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/28/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-19-1262
Download: ML19301D255 (9)


Text

Michael J. Yox 7825 River Road tk.Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, 6A 30830 706-848-6459 tel OCT 2 8 2019 Docket No.: 52-025 52-026 ND-19-1262 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02b [Index Number 7701 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of October 24, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspection, Test, Analysis, and Acceptance Criteria (ITAAC) Item 3.3.00.02b [Index Number 770] has not been completed greater than 225-days prior to initial fuel load. Enclosure 1 describes the plan for completing ITAAC 3.3.00.02b [Index Number 770]. Southern Nuclear Operating Company will at a later date provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

Southern Nuclear Operating Company(SNC) previously submitted Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load for 3.3.00.02b [Index Number 770] ND-16-1886[ML16272A324],

dated September 28, 2016. This resubmittal supersedes letter number ND-16-1886 in its entirety.

This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215.

In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(3) ITAAC Closure Notifications will be submitted to the NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yak Regulatory Affairs director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 3.3.00.02b [Index No. 770]

MJY/VK/sfr

U.S. Nuclear Regulatory Commission ND-19-1262 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1262 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. OrlanI (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernlzan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 1 of 6 Southern Nuclear Operating Company ND-19-1262 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC Item 3.3.00.02b [Index No. 770]

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 2 of 6 ITAAC Statement Design Commitment 2.b) Site grade level Is located relative to floor elevation lOO'-O"per Table 3.3-5.

I nspections/Tests/Analvses Inspection of the as-bullt site grade will be conducted.

Acceotance Criteria Site grade Is consistent with design plant grade within the dimension defined on Table 3.3-5.

ITAAC Completion Description Inspection of the as-built site grade is conducted to confirm that the site grade is consistent with design plant grade within the dimension defined on VEGP Combined License(COL)Appendix C Table 3.3-5, row 10 (Attachment A). VEGP Appendix C Section 1.1, Definitions, defines site grade as the as-built elevation of the soil to the west side of the nuclear island, and design plant grade as equivalent to floor elevation lOO'-O". The design plant grade for VEGP is defined as 220'-0" above mean sea level, which is equivalent to the 1 GO'-G" elevation for the standard plant design.

An as-built site grade inspection is performed to demonstrate the as-built elevation of the area to the west side of the nuclear island is at the elevation of 1 GG'-G" within a tolerance of +/-3'-6".

This tolerance of +/-3'-6" is based on seismic and soil structure interaction considerations for the Auxiliary Building, Shield Building, and Containment. The zone of influence of soil characteristics on the structural response of an embedded structure is generally considered to extend horizontally away from the structure the same distance as the depth of the embedment.

For the AP1GGG this distance is approximately 4G feet from the auxiliary and shield buildings.

(Reference 1). The Power Block Grading Plan (Reference 2) has details of the site grading in the vicinity of the nuclear island, including local slope to encourage runoff away from the doorways of the buildings.

Per COL Appendix C definition of "As-Built", the physical properties of the structure, where technically justifiable, may be based on measurements prior to installation, provided that subsequent fabrication, handling, installation, and testing does not alter the properties.

The site grade is determined with a walkdown of surveyed locations of as-built structures that are at elevations of 1 GG'-G" or lower (Attachment B and Figures 1A and IB).

The inspection of as-built site grade is conducted by a survey of storm drain covers using the Power Block Grading Plan (Reference 2). Measurements are taken using survey equipment in accordance with site survey procedures (Reference 3). These storm drain covers measured elevations are compared to the Power Block Grading Plan to validate that the site grade

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 3 of 6 elevation areas west of the Nuclear Island are at site grade elevation relative to floor elevation of 10O'-O" and within a tolerance of +/-3'-6".

The as-bullt site grade Inspection results are documented In Attachment B and Principal Closure Document XXX (Reference 4) and determine that the as-bullt site grade elevation relative to floor elevation Is 10O'-O" +/-3'-6". The Inspection result verifies that the as-bullt site grade Is consistent with the design plant grade within the dimension defined In Table 3.3-5 (Attachment A).

Principal Closure Document XXX Is available for NRC Inspection as part of the ITAAC 3.3.00.02b Completion Package (Reference 4).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References favaiiabie for NRC inspection)

1. NUREG-1793 Supplement 2, Final Safety Evaluation Report
2. SVO-OOOO-XG-800009, Power Block Grading Plan
3. 26139-000-4MP-T81C-N3201,"Construction Survey"
4. Principal Closure Document XXX
5. ITAAC 3.3.00.02b Completion Package
6. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 4 of 6 Attachment A: Excerpt from VEGP Unit 3 COL Appendix 0- Table 3.3-5*

  • Key Dimension 1 *Nomlnal Dimension l *Tolerance Distance of Design Plant Grade +/- 3ft-6 in (Floor elevation 10O'-O") relative to Site Grade 1 1 Attachment B Unit 3 Grading Plan Elevations for As-Bullt Structures Distance from within +/-3'- 6" Location west of Site Grading Surveyed Nuclear Island Nuclear Island Plan Elevation Elevation (Approximate) Y/N Site Drainage cover 218.35' XXX.XX' plate DI-NI-24 Site Drainage cover 218.00' XXX.XX' plate DI-NI-25 Site Drainage cover 218.00' XXX.XX' plate DI-NI-26 Site Drainage cover 218.00' XXX.XX' plate DI-NI-27 Unit 4 Grading Plan Elevations for As-Bullt Structures Distance from Location west of Site Grading Surveyed within +/-3'- 6" Nuclear Island Nuclear island Plan Elevation Elevation tolerance?

(Approximate)

Site Drainage cover 218.35' XXX.XX' plate DI-NI-15 Site Drainage cover 218.00' XXX.XX' plate DI-NI-16 Site Drainage cover 218.00' XXX.XX' plate DI-NI-17 Site Drainage cover 218.00' XXX.XX' plate DI-NI-19

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 5 of 6 Figure 1 A: Excerpt from Unit 3 Power Block Grading Plan with Locations*

219.50 l ^s a CONDENSATE STORAGE TANK 219.50 EL 220.00 218.00 219.50 9>>

PCS BARRiER/TRENCH f PCC ANCILLARY EL 229.75 CM WATER STORAGE xrst >>

TANK EL 220.00 ZT9.50 1218.00 216.50 UNIT 3 CONTAINMENT/

SHIELD BUILDING EL 220.00 PUCTBAW/

SEE DWG SV3-503I FOR enlarged PL 216.50 216.90 AUXILIARY BUILDING EL 220.OC Si 219 219.75 219.50

  • Excerpt from Reference 2

U.S. Nuclear Regulatory Commission ND-19-1262 Enclosure Page 6 of 6 Figure 1B: Excerpt from Unit 4 Power Block Grading Plan with Locations*

DT5 Skid KEL 21?

yj

< I ' 219.50 o

^ .

I .'X Ov ^

Z'9^62

"*12'""'N 219.50 CWOENSATE storage 'tank ; >> 219.50 EL 220.00 213.50 PCS BARRIER/TRENCH EL 229.75 PCC AKCILLARY ^

iATER STORAGE TANK El 220.00 OfilT A C0NTAINVCNT2 shield BUSLDWG EL 220.00 SEE one SVA FM>> ENLARCEC 218.40 AUXILIARY BUILOING EL 220.00 219.K>>

219.75 Excerpt from Reference 2