ITAAC Closure Notification on Completion of 2.6.03.04i (Index Number 876)
ML19344D001
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/10/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-19-1194
Download: ML19344D001 (6)


Text

^Southern Nuclear Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 DEC 1 0 2019 Docket No.: 52-025 ND-19-1194 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.6.03.04i [Index Number 8761 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.03.04][Index Number 876]for type tests and analyses of isolation devices in the Class IE dc and Uninterruptible Power Supply System. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI)08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 ITAAC Closure Notification on Completion of 2.6.03.04][Index Number 876]

MJY/DJG/sfr

U.S. Nuclear Regulatory Commission ND-19-1194 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 go:

Nuclear Reouiatorv Commission Mr. W. Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M V. Hall M G. Armstrong Ms. T. Lamb M M. Webb M T. Fredette M C. Weber M S. Smith M C. Santos Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1194 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-1194 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1194 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 ITAAC Closure Notification on Completion of 2.6.03.04j[Index Number 876]

U.S. Nuclear Regulatory Commission ND-19-1194 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment 4.j) The IDS provides electrical isolation between the non-Class 1E battery monitors and the Class 1E battery banks.

Inspections/Tests/Analvses Type tests, analyses, or a combination of type tests and analyses of the isolation devices will be performed.

Acceptance Criteria A report exists and concludes that the battery monitor fuse isolation panels prevent credible faults from propagating into the Class 1E portions of the IDS.

ITAAC Determination Basis Type tests and analyses of the Class 1E dc and Uninterruptible Power Supply System (IDS) electrical isolation devices between the non-Class 1E battery monitors and the Class 1E battery banks were performed to verify the battery monitor fuse isolation panels prevent credible faults from propagating into the Class 1E portions of the IDS.

Tests were performed on each type of isolation device utilized in the design of the battery monitor connections to the Class 1E batteries. The tests were performed to qualify the devices in accordance with IEEE 384-1981 and Regulatory Guide 1.75 (References 1 and 2). The isolation devices were subjected to the following test conditions on the non-Class IE side; 1) maximum credible AC and DC voltage and current transients, 2) shorts, 3) grounds, and 4) open circuits. The Class 1E side of each protective device was monitored during testing to verify the fault condition did not result in circuit degradation beyond an acceptable level, and no electrical disturbance was propagated. The results of the type tests are provided in SV3-IDS-VTR-001, SV3-IDS-\/TR-002, SV3-IDS-VTR-003, and SV3-IDS-VTR-004(References 3, 4, 5 and 6)and confirm each device configuration provides the isolation necessary to prevent credible faults from propagating into the Class IE portions of the IDS.

Analyses were performed to confirm each non-Class IE interface of the battery monitors with the Class IE IDS battery banks complies with the specific electrical isolation criteria provided in section 7 of IEEE 384-1981 (Reference 1) and Regulatory Guide 1.75 (Reference 2).

The results of the analyses are provided in APP-IDS-EOC-020(Reference 7) and conclude the battery monitor fuse isolation panels prevent credible faults from propagating into the Class 1E portions of the IDS.

References 1 through 7 are available for NRC inspection as part of Unit 3 ITAAC Completion Package (Reference 8).

U.S. Nuclear Regulatory Commission ND-19-1194 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6 03.04j was performed for Vogtle Unit 3 and that the prescribed acceptance criteria are met. Systems, structures, and components verified as part this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

We request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99(e)(1).

References (avaiiabie for NRC Inspection^

1. IEEE 384-1981,"IEEE Standard Criteria for Independence of Class IE Equipment and Circuits"
2. Regulatory Guide 1.75, Revision 2, 9/78, "Physical Independence of Electric Systems"
3. SV3-IDS-\/TR-001, Revision 0, "Isolation Barrier Maximum Credible Fault Test Report(For WEC-NPO Supplied Equipment)"
4. SV3-IDS-\/TR-002, Revision 0, "Isolation Barrier Short Circuit/Open Circuit/Grounded Circuit Test Report(For WEC-NPO Supplied Equipment)"
5. SV3-IDS-\/TR-003, Revision 0, "Isolation Barrier Short Circuit/Open Circuit/Grounded Circuit Test Report(For WEC-NPO Supplied Equipment)"
6. SV3-IDS-VTR-004, Revision 0, "Isolation Barrier Maximum Credible Fault Test Report(For WEC-NPO Supplied Equipment)"
7. APP-IDS-EOC-020, Revision 2,"Analysis/Compliance of the IDS With Respect to the Specific Electrical Isolation Criteria in IEEE 384-1981"
8. 2.6.03.04j-U3-CP-Rev 0, IT/\AC Completion Package