ND-19-0882, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule

From kanterella
Jump to navigation Jump to search
Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule
ML19221B417
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/08/2019
From: Yox M
Southern Nuclear Operating Co
To: Frederick Brown
Document Control Desk, Office of New Reactors
Shared Package
ML19221B416 List:
References
ND-19-0882
Download: ML19221B417 (4)


Text

Southern Nuclear Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, Georgia 30830 Vogtle 3 & 4 706 848 6459 tel August 8, 2019 ND-19-0882 Docket Nos.: 52-025 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Mr. Fred Brown Director, Office of New Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant - Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule Ladies and Gentlemen:

The U.S. Nuclear Regulatory Commission (NRC)issued Combined Licenses(COLs) NPF-91 and NPF-92 to Southern Nuclear Operating Company(SNC) pursuant to Title 10 of the Code of Federal Regulations(10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012.

Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following:

  • A schedule for implementation of the operational programs listed in the Final Safety Analysis Report Table 13.4-201, including the associated estimated date for initial loading of fuel (COL section 2.D.(11))
  • A schedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedules shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented. contains the COL Operational Programs and Other License Conditions Implementation Schedule. Enclosure 2 contains the Preoperational Test Procedure Completion Schedule. The information provided in the enclosures is current as of August 6, 2019. As is typical with a construction project, the schedule information is dynamic in nature.

U. S. Nuclear Regulatory Commission ND-19-0882 Page 2 of 4 The schedule information provided in the enclosures is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the last schedule update provided to the NRC on February 8, 2019, Agencywide Documents Access and Management System (ADAMS)

Accession Number ML19039A264. Accordingly, the enclosures to this letter should be withheld from public disclosure.

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Kelli Roberts at (706)848-6991.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 MJY/RAS/sfr

Enclosures:

1. COL Operational Programs and Other License Conditions Implementation Schedule {Withhold from Public Disclosure}
2. Preoperational Test Procedure Completion Schedule {Withhold from Public Disclosure}

U. S. Nuclear Regulatory Commission ND-19-0882 Page 3 of 4 go:

Southern Nuclear Qperatino Company / Georoia Power Comoanv Mr. 8. E. Kuczynski (w/o enclosures)

Mr. P.P. Sena III (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosures)

Mr. T. W.Yelverton (w/o enclosures)

Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. S. Agee Ms. A. C. Chamberlain Mr. S. Leighty Mr. E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr. W. Jones(w/o enclosures)

Ms. J. Dixon-Herrity Mr. C. Patel Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. C. J. Even Mr. A. Lerch Mr. S. Walker Mr. N.D. Karlovich Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Ms. K. P. Carrington Mr. P.J. Heher State of Georoia Mr. R. Dunn (w/o enclosures)

U. S. Nuclear Regulatory Commission ND-19-0882 Page 4 of 4 Oalethoroe Power Corporation Mr. M. W. Price (w/o enclosures)

Ms. A. Whaley (w/o enclosures)

Municipal Electric Authority of Georcia Mr. J. E. Fuller(w/o enclosures)

Mr. S. M. Jackson (w/o enclosures)

Dalton Utilities Mr. T. Bundros(w/o enclosures)

Westinahouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)

Mr. T. Rubenstein (w/o enclosures)

Mr. M. Corletti Mr. M. L. Clyde Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation (w/o enclosures)

Ms. L. A. Matis, Tetra Tech NUS, Inc.(w/o enclosures)

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.(w/o enclosures)

Mr. S. Roetger, Georgia Public Service Commission (w/o enclosures)

Ms. 8. W. Kernizan, Georgia Public Service Commission (w/o enclosures)

Mr. K. C. Greene, Troutman Sanders(w/o enclosures)

Mr. S. Blanton, Balch Bingham NDDocumentinBox@duke-energy.com, Duke Energy (w/o enclosures)

Mr. S. Franzone, Florida Power & Light(w/o enclosures)