Southern Nuclear Operating Company ND-19-0485 Vogtle Electric Generating Plant Units 3 and 4 Proposed Changes to VEGP Unit 3 Licensing Basis Documents (LAR-19-007)
Insertions Denoted by Blue Underline and Deletions by Red Strikethrough Omitted text Is Identified by three asterisks (***)
(This Enclosure consists of 6 pages, including this cover page)
ND-19-0485 Proposed Changes to VEGP Unit 3 Licensing Basis Documents (LAR-19-007)
Revise Unit 3 COL Appendix 0, Page 0-459 ITAAC E.3.9.05.01.03 (851)
Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 E.3.9.05.01.01 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.l]
5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.
5.1.1 The TSC has at least 2,175 square feet of floor space.
850 Not used.
851 E.3.9.05.01.03 Not used.
5.1 The licensee has established a 5.1 An inspection of the as built 5.1.3 The plant parameters li'-tr-H in ITP9 ^ P Tnhin 7 S 1 LwC.!LIllL'U.l LLUOLIl L L.dlLL'L ^ I. O J
and an onsite operations support center (OSC). [H.l]
including a test of the capabilities.
Post Accident Monitoring System, can be retrieved and displayed in the TSC.
852 E.3.9.05.01.04 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.l]
5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.
5.1.4 The TSC is located within the protected area, and no major security barriers exist between the TSC and the control room.
Page 2 of 6
ND-19-0485 Proposed Changes to VEGP Unit 3 Licensing Basis Documents -
Revise Unit 3 COL Appendix 0, Page C-460 ITAAC E.3.9.05.01.06 (854) and ITAAC E.3.9.05.02.02 (858)
Table E.3.9-5 Inspections, Tests, Analyses, and Acceptanee Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 853 E.3.9.05.01.05 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.l]
5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.
5.1.5 The OSC is located in the Maintenance Support Building.
854 E.3.9.05.01.Q6 Not used.
5.1 The licensee has established a 5.1 An inspection of the as built 5.1.6 The TSC ventilation ICL/lLlllCcLI ljUUULIII CdlLCI oVoLwlll lllL^lLXLxC7o tX center (OSC). [H.l]
capabilities.
(HEPA) and charcoal filter, and radiation monitors are installed 855 E.3.9.05.01.07 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.l]
5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.
5.1.7 A reliable and backup electrical power supply is available for the TSC.
856 E.3.9.05.01.08 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.l]
5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.
5.1.8 Controls and displays exist in the TSC to control and monitor the status of the TSC ventilation system including heating and cooling, and the activation of the HEPA and charcoal fdter system upon detection of high radiation in the TSC.
857 Not used.
858 E? -2 n AC AO rvo Not used.
XllL' llUUllijL.'L.' lido UolvlLlllollULl mi ciiici^miuy upcimiuiij luL-iiiiy (EOF). [H.2]
test of the capabilities.
Post Accident Monitoring System, can be retrieved and displayed in the EOF.
Page 3 of 6
ND-19-0485 Proposed Changes to VEGP Unit 3 Licensing Basis Documents -
Revise Unit 3 COL Appendix 0, Page 0-461 ITAAC E.3.9.06.00.02 (860) and ITAAC E.3.9.06.00.03 (861)
Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 860 E.3.9.06.00.02 Not used.
6.2 The means exists to determine the source term of releases of radioactive material within plant systems, and the magnitude of the release of radioactive materials based on plant system parameters and effluent monitors. [1.3]
6.2 A test will be performed to demonstrate that the means exist to determine the source term of releases of radioactive material within plant systems, and the magnitude of the release of radioactive materials based on plant system parameters and effluent monitors.
6.2 ElPs, through use in training and a drill, provided direction to accurately calculate the source terms and the magnitude of release of postulated accident scenarios.
861 E.3.9.06.(X).03 Not used.
6.3 The means exists to continuously assess the impact of the release of radioactive materials to the environment, accounting for the relationship between effluent monitor readings, and onsite and offsite exposures and contamination for various meteorological conditions.
{T4}
6.3 A tost will bo performed to demonstrate that the impact of a radiological release to the environment is able to be assessed by utilizing the relationship between effluent monitor readings, and onsite and offsite exposures and contamination for various meteorological conditions.
6.3 Response personnel demonstrated that the means exist to continuously assess the impact of the release of radioactive materials to the environment, accounting for the relationship between effluent monitoring readings, and onsite and offsite exposures and contamination for various meteorological conditions under drill conditions.
Page 4 of 6
ND-19-0485 Proposed Changes to VEGP Unit 3 Licensing Basis Documents -
Revise Unit 3 COL Appendix 0, Page 0-462 ITAAC E.3.9.06.00.05 (863)
Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 862 E.3.9.06.00.04 6.4 The means exists to acquire and evaluate meteorological information. [1.5]
6.4 A test will be performed to verify the ability to access meteorological information in the TSC and control room.
6.4 The following parameters are displayed in the TSC and control room:
- Wind speed (at 10 and 60 meters)
- Wind direction (at 10 and 60 meters)
Standard deviation of horizontal wind direction (at 10 meters)
Vertical temperature difference (between 10 and 60 meters)
- Ambient temperature (at 10 meters)
Dew-point temperature (at 10 meters)
Precipitation (at the tower base) 863 E.3.9.06.00.05 Not used.
6.5 The means exists to make rapid assessments of actual or potential magnitude and locations of any radiological hazards through liquid or gaseous release pathways, including activation, notification means, field team composition, transportation, communication, monitoring equipment, and estimated deployment times. [1.8]
6.5 A tost will be performed of the capabilities to make rapid assessments of actual or potential magnitude and locations of radiological hazards through liquid or gaseous release pathways, including activation, notification means, field team composition, transportation, communication, monitoring equipment, and estimated deployment times.
6.5 The radiological field monitoring team(s) was activated and evaluated. They demonstrated an ability to make rapid assessment of actual or potential magnitude and locations of any radiological hazards through simulated liquid or gaseous release pathways. A qualified field team was notified, activated, briefed and dispatched in accordance with ElPs during-a radiological release scenario.
The team demonstrated the procedural guidance in team composition, use of monitoring equipment, communication from the Field, and locating specific sampling locations.
Page 5 of 6
ND-19-0485 Proposed Changes to VEGP Unit 3 Licensing Basis Documents -
Revise Unit 3 COL Appendix 0, Page 0-463 ITAAC E.3.9.06.00.06 (864)
Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 864 F 3 9 Ofi 00 06 Not used.
integrated dose from the projected and actual dose rates, and for U.U ^ k IL-jl VV ill Uc JJcI lUI llicLl Ul the capabilities to estimate integrated dose from the U.U 1 He lilCLlllLi Wcie demonstrated to estimate integrated dose from the dose uooUooIllUllL ^lUt^lcllIl blllvJ lllL-LllL' L^X i k UILILL-L'Ll V C/ UCLILill (PAGg). [1.10]
estimates with the EPA team readings during a AtLC'CLI ^ L* klULILIII ^LIILis?*..'*
I biLlIUclULi
- U IL-lUcloL-i.jUdiUlIU.
Revise Unit 3 COL Appendix C, Page C-478h ITAAC E.3.9.09.00.01 (873)
Table E.3.9-9 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Program Commitment Inspections, Tests, Analyses Acceptance Criteria 873 E.3.9.09.00.01 Not Li.sed.
9.1 The licensee has submitted detailed implementing procedures for its emergency plan no less than 180 days prior to fuel load.
9.1 An inspection of the submittal letter will be performed.
9.1 The licensee has submitted detailed emergency implementing procedures (ElPs) for the onsite emergency plan no less than 180 days prior to fuel load.