ND-18-0337, Vogtie Electric Generating Plant Unit 3 and Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.05.01 (Index Number 718)
| ML18072A245 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/13/2018 |
| From: | Yox M Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of New Reactors |
| References | |
| ITAAC 2.7.05.01, ND-18-0337 | |
| Download: ML18072A245 (6) | |
Text
^
Southern Nuclear MAR 1 3 2018 Docket Nos.:
52-025 52-026 Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 ceii myox @southernco.com ND-18-0337 10 CFR 52.99(c)(3)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.7.05.01 [Index Number 718]
Ladies and Gentlemen:
Pursuant to 10 CFR 52.99(c)(3), Southern NuclearOperating Company hereby notifies the NRC that as of March 8, 2018, Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.7.05.01 [Index Number 718]
has not been completed greater than 225-daysprior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a laterdate, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
This notification is informed by the guidance described in NEI 08-01, IndustryGuideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, oranalyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to supportthe Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).
This letter contains no new NRC regulatory commitments.
If there are any questions, please contact Tom Petrak at 706-848-1575.
Respectfully submitted.
r Michael J. Yox Regulatory Affairs Director Vogtie 3 &4
Enclosure:
Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.7.05.01 [Index Number718]
MJY/PGL/amw
U.S. Nuclear Regulatory Commission ND-18-0337 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)
Mr. M. D. Rauckhorst (w/o enclosures)
Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)
Mr. D. L. McKinney Mr. M. J. Yox Mr. D. L. Fulton Mr. J. B. Klecha Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. 0. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosures)
Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Oaiethoroe Power Corporation Mr. R. B. Brinkman Municlpa! Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson
U.S. Nuclear Regulatory Commission ND-18-0337 Page 3 of 3 Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. C. Durham (w/o enclosures)
Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham
U.S. Nuclear Regulatory Commission ND-18-0337 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0337 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.7.05.01 [Index Number 718]
U.S. Nuclear Regulatory Commission ND-18-0337 Enclosure Page 2 of 3 ITAAC Statement Design Commitment
- 1. The functional arrangement of the VAS is as described in the Design Description of this Section 2.7.5.
Inspections/Tests/Analvses Inspection of the as-built system will be performed.
Acceptance Criteria The as-built VASconforms withthe functional arrangement described inthe Design Description of this Section 2.7.5.
ITAAC Completion Description An inspection ofthe as-built Radiologically Controlled AreaVentilation System (VAS) is conducted aftercompletion ofconstruction to confirm the functional arrangementofthe VAS is as described in the Design Description ofCombined License (COL) Appendix C Section 2.7.5. This inspection encompassesthe structures, systems, and components (SSCs) identified in the COL Appendix C Section 2.7.5, Design Description, including those inTable 2.7.5-3.
The inspection (walkdown) is completed in accordance with APP-GW-ITY-004, Functional Arrangement ITAAC Guideline (Reference 1), which requires the preparation of a detailed inspection plan. This inspection plan includes the use of detailed drawings suchas Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawings to perform visual observations and compare the as-builtsystem to the Design Description.
The inspection results aredocumented in the Unit 3 and Unit 4 Principal Closure Documents XXX and YYY (References 2 and 3, respectively) supporting the Unit 3 and Unit 4 ITAAC 2.7.05.01 Completion Packages (References 4 and5, respectively) andverify theSSCs are physically arranged and located toperform the functions described in theDesign Description and referenced table. Theinspection results confirm thatthe as-built VAS conforms with thefunctional arrangement as described in the COL Appendix CSection 2.7.5, Design Description.
The Unit 3 and Unit 4 Principal Closure Documents XXX and YYY are available for NRC inspection as part ofthe Unit 3 and Unit 4 ITAAC 2.7.05.01 Completion Packages.
List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining tothesubject ITAAC and associated corrective actions. This review foundthere are no relevant ITAAC findings associated with this ITAAC.
References favallable for NRC inspection)
- 1. APP-GW-ITY-004, Functional Arrangement ITAAC Guideline
- 2. Principal Closure Document XXX (Unit 3)
U.S. Nuclear Regulatory Commission ND-18-0337 Enclosure Page 3 of 3 3.
Principal Closure Document YYY (Unit 4) 4.
ITAAC 2.7.05.01 Completion Package (Unit 3) 5.
ITAAC 2.7.05.01 Completion Package (Unit 4) 6.
NEI 08-01, "IndustryGuideline for tfie ITAAC Closure Process Under 10 CFR Part 52"