ND-18-0099, Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.01.01 (Index Number 90)

From kanterella
(Redirected from ND-18-0099)
Jump to navigation Jump to search
Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.01.01 (Index Number 90)
ML18045A284
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/14/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-18-0099
Download: ML18045A284 (7)


Text

Southern Nuclear FEB 1 k 2018 Docket Nos.:

52-025 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 ceii myox @southernco.com ND-18-0099 10CFR 52.99(c)(3)

Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.01.01 findex Number 901 Ladies and Gentlemen; Pursuant to 10 CFR52.99(c)(3), Southern Nuclear Operating Companyhereby notifies the NRC that as of February 8, 2018, Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.01.01 [Index Number 90] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the planfor completing this ITAAC. Southern Nuclear Operating Companywill, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

Southern Nuclear Operating Company (SNC) previously submitted, via letter ND-16-1978

[ML16305A271], a Unit 3 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load for Item 2.2.01.01 [Index Number 90]. This resubmittal supersedes the previous Unit 3 notice in itsentirety.

This notification is informed by the guidance described in NEI 08-01, IndustryGuideline forthe ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met priorto plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

U.S. Nuclear Regulatory Commission ND-18-0099 Page 2 of 4 If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 &4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit3 and Unit4 Completion Plan for Uncompleted ITAAC 2.2.01.01 [Index Number 90]

MJY/LBP/amw

U.S. Nuclear Regulatory Commission ND-18-0099 Page 3 of 4 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Yox Mr. D. L. Fulton Mr. J. D. Williams Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. T. C. Brimfield Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Oalethorpe Power Corporation Mr. R. B. Brinkman Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-18-0099 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Mails, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-18-0099 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0099 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.2.01.01 [Index Number 90]

U.S. Nuclear Regulatory Commission ND-18-0099 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

1. The functional arrangement of the CNS is as described in the Design Description of this Section 2.2.1.

insoections/Tests/Anaivses inspection of the as-built system will be performed.

Acceptance Criteria The as-built CNS conforms with the functional arrangement as described in the Design Description of this Section 2.2.1.

ITAAC Completion Description An inspection ofthe as-built containment system (CNS) is conducted after completion of construction to confirmthat the functional arrangement of the CNS is as described in the Design Description of Combined License (COL) Appendix C, Section 2.2.1. This inspection encompasses the structures, systems, and components (SSCs) identified inthe COL Appendix C, Section 2.2.1 Design Description, including those inTable 2.2.1-4 and Figure 2.2.1-1.

The inspection (walkdown) is completed in accordance with APP-GW-ITY-004, Functional Arrangement ITAAC Guideline (Reference1),which requiresthe preparation ofa detailed inspection plan. This inspection plan includes the use ofdetailed drawings such as Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawings to perform visual observations and compare the as-built system to the Design Description.

Theinspection results are documented in the Unit 3 and Unit 4 Principal Closure Documents XXX and YYY (References 2 and 3, respectively) supporting the Unit 3 and Unit 4 ITAAC 2.2.01.01 Completion Packages (References 4 and 5, respectively) and verify thatthe SSCs are physically arranged and located to perform thefunctions described in the Design Description and referenced table andfigure. Theinspection results confirm thatthe as-built CNS conforms with thefunctional arrangementas described inthe COL Appendix C, Section 2.2.1, Design Description.

The Unit 3 and Unit 4 Principal Closure Documents XXX and YYY are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.2.01.01 Completion Packages.

List of ITAAC Findings In accordance with plantproceduresfor ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review ofall findings pertaining tothe subject ITAAC andassociated corrective actions. This reviewfound there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-18-0099 Enclosure Page 3 of 3 References (available for NRG inspection)

1. APP-GW-ITY-004, Functional Arrangement Guideline 2.

Principal Closure Document XXX (Unit 3) 3.

Principal Closure Document YYY (Unit 4) 4.

ITAAC2.2.01.01 Completion Package (Unit 3) 5.

ITAAC 2.2.01.01 Completion Package (Unit 4) 6.

NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"