Jeffrey B. Archie Senior Vice President, SCANA Senior Vice President & CNO, SCE&G SCE&G A SCANA COMPANY December 17, 2018 NND-18-0021 10 CFR 50.59 10CFR 50.71(e) 10 CFR 52.97 10 CFR 52.99 10 CFR 52 AppD U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Nos. NPF-93 and NPF-94 Docket Numbers52-027 and 52-028

Subject:

PERIODIC REPORTING REQUIREMENTS

References:

1. Letter from Frederick D. Brown to Jeffrey B. Archie, dated April 18, 2018.

(ADAMS Accession Number ML18107A081)

2. NND-17-0385, Letter from April R. Rice to the U.S. Nuclear Regulatory Commission, dated June 29, 2017.
3. NND-17-0386, Letter from April R. Rice to the U.S. Nuclear Regulatory Commission, dated July 12, 2017.
4. NND-18-002, Letter from Jeffrey B. Archie to the U.S. Nuclear Regulatory Commission, dated February 15, 2018.

(ADAMS Accession Number ML18046A590)

The purpose of this letter is to provide periodic reports and updates for Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3, as required by Nuclear Regulatory Commission (NRC) regulations and/or license conditions of the VCSNS 2 and 3 Combined Licenses (COL). These requirements include information to be provided to the NRC on a regular basis, as described below.

Annual Update of the FSAR and Plant-Specific DCD Information 10 CFR 50.71(e) and 10 CFR 52 Appendix D Section X.B.2 require licensees to provide updated Final Safety Analysis Report (FSAR) and Plant-Specific Design Control Document (DCD) information. As described in Reference 1, construction activities were terminated on the VCSNS Units 2 & 3 project as of July 31, 2017 and final disposition of the COLs is pending.

Accordingly, no revisions have been incorporated into FSAR and Plant-Specific DCD information, since the most-recent submittal(s) of this information in References 2 and 3.

SCE&G I New Nuclear Deployment

  • P. O. Box 88
  • www.sceg.com

Document Control Desk NND-18-0021 Page 2 of 2 Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VIII Departures 10 CFR 50.59(d)(2) requires licensees to submit reports to the NRC containing brief descriptions of any changes, tests or experiments made pursuant to 10 CFR 50.59(c).

Additionally, 10 CFR Part 52 Appendix D Sections X.B.1 and X.B.3.b requires COL holders referencing Appendix D to submit a report of all plant-specific departures. For the reporting period beginning August 1, 2018, there have been no changes, tests or experiments implemented pursuant to paragraph (c) of 10 CFR 50.59, nor any plant-specific departures under 10 CFR 52 Appendix D Section VIII.

Schedule for Completing ITAAC Pursuant to the requirements of 10 CFR 52.99(a) to provide periodic schedule information for uncompleted of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), all previously uncompleted ITAAC activities remain in a To Be Determined (TBD) state pending final disposition of the COLs.

Schedule for Implementation of Operational Programs.

Pursuant to VCSNS Units 2 & 3 License Conditions 2.D(11) and 2.D(12)(e) to provide periodic schedule information for implementation of operational programs, all previously uncompleted Operational Program Implementation activities remain in a TBD state pending final disposition of the COLs.

Implementation of Mitigation Strategies for Beyond Design Basis External Events Pursuant to the requirements outlined in License Condition 2.D(13)(f)4, no changes in status or schedule have occurred since the information provided in the report included in Reference 4. All previously uncompleted implementation activities of the Overall Integrated Plan remain in a TBD state pending final disposition of the COLs.

This letter contains no regulatory commitments. Should you have any questions regarding the above information, please contact Mr. Justin Bouknight at (803)941-9828, or by email at justin.bouknight@scana.com.

JRB/JBA cc: Frederick Brown Kyle M. Young Vonna Ordaz Justin R. Bouknight Cathy Haney Michael S. Moore Billy Gleaves Susan E. Jenkins Jim Reece William M. Cherry Jeffrey B. Archie Jason W. Williams Alvis J. Bynum DCRM-EDMS@SCANA.COM Virginia D. Smith VCSNNDCorrespondence@scana.com