March 16, 2026 LICENSEE:
Nebraska Public Power District FACILITY Cooper Nuclear Station
SUBJECT:
SUMMARY
OF JANUARY 27, 2026, PUBLIC TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS PLANNED LICENSE AMENDMENT REQUESTS TO IMPLEMENT RISK INFORMED COMPLETION TIMES AND 10 CFR 50.69 (EPID L-2025-LRM-0008)
On January 27, 2026, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Nebraska Public Power District (the licensee) via teleconference. The purpose of this meeting was to discuss the licensees planned license amendment requests (LARs) to implement Risk Informed Completion Times (RICT) and the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69. The meeting notice and agenda, dated January 16, 2026, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML26020A026.
Enclosed is a list of attendees at the meeting.
The licensee presented information (ML26020A008) discussing the planned LARs. The licensees presentation included a discussion of the planned technical specifications task force travelers (TSTF) to implement, including, TSTF-505, TSTF-591, and TSTF-439. The presentation also detailed implementing the requirements of 10 CFR 50.69. The licensee plans to submit these two submittals in about 6 weeks from the date of the meeting for 10 CFR 50.69, and 12 weeks for the RICT TSTFs.
The NRC staffs discussion with the licensee included the planned timeline for the submittals, a discussion of lessons learned from other submittals, and potential for submitting the two planned submittals simultaneously to increase efficiency through combined audits of the probabilistic risk assessment (PRA) technical adequacy, PRA model assumptions, and PRA sources of uncertainty.
No regulatory decisions were made at this meeting. No members of the public were in attendance. No comments or public meeting feedback forms were received.
Please direct an inquiries to me at 301-415-3719 or via email at Thomas.Byrd@nrc.gov.
Sincerely,
/RA/
Thomas J. Byrd, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 Enclosure List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES JANUARY 27, 2026, PREAPPLICATION TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS IMPLEMENTATION OF RISK INFORMED COMPLETION TIMES AND 10 CFR 50.69 REQUIREMENTS FOR COOPER NUCLEAR STATION U.S. NUCLEAR REGULATORY COMMISSION Thomas Byrd - NRR1/DORL2/LPL43 Andrea Russell - NRR/DSS4/STSB5 Keith Tetter - NRR/DRA6/APLC7 Marie Pohida - NRR/DRA/APLC Ming Li - NRR/DEX8/EICB9 Jason English - NRR/DEX/EICB Drew Childs - NRR/DRA/APLA10 Alexander Schwab - NRR/DRA/APLA Jay Robinson - NRR/DRA/APLB11 NEBRASKA PUBLIC POWER DISTRICT Steve Nelson - Cooper Regulatory Affairs and Compliance Manager Troy Barker - Cooper Director of Strategic Asset Management and Special Projects Matt Wilmers - Cooper Mechanical and Risk Engineering Supervisor Steve Norris - Cooper Senior Regulatory and Compliance Engineer Ole Olson - Cooper Senior Probabilistic Risk Assessment Engineer Zachary Clauson - Quality Assurance Auditor Zandra Blankenship - Nuclear Independent Senior Assessor Jeff Schappaugh - Jensen-Hughes Ed Parsley - Jensen-Hughes Ralph Chackal - Associated Engineering Resources Justin Wheat - Associated Engineering Resources MEMBERS OF THE PUBLIC None 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch 4 4 Division of Safety Systems 5 Technical Specifications Branch 6 Division of Risk Assessment 7 Probabilistic Risk Assessment Licensing Branch C 8 Division of Engineering and External Hazards 9 Instrumentation and Controls Branch 10 Probabilistic Risk Assessment Licensing Branch A 11 Probabilistic Risk Assessment Licensing Branch B
SUBJECT:
SUMMARY
OF JANUARY 27, 2026, PUBLIC TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS PLANNED LICENSE AMENDMENT REQUESTS TO IMPLEMENT RISK INFORMED COMPLETION TIMES AND 10 CFR 50.69 (EPID L-2025-LRM-0008) DATED MARCH 16, 2026 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrPMCooper Resource RidsNrrLAPBlechman Resource RidsRgn4MailCenter Resource TByrd, NRR ASchwab, NRR ARussell, NRR DChilds, NRR JEnglish, NRR JRobinson, NRR KTetter, NRR MPohida, NRR MLi, NRR EStamm, OEDO DJohnson, OEDO ADAMS Accession Nos.:
ML26083A191 (Package)
ML26063A870 (Meeting Summary) 20260304-60051 (e-Concurrence case)
- via eConcurrence NRC-001