ES-2.1, Page 17 of 20 Form 2.1-1 Examination Preparation Checklist Facility: SURRY_________________________

Developed by: Written:

Facility NRC Date of Examination: _____Oct 25_

//

Operating:

Facility NRC Target Date*

Task Description Chief Examiners Initials

-240 1.

Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

-210 2.

NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

-210 3.

Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

-210 4.

Reference material due for NRC-prepared examinations (F).

-210 5.

Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

-195 6.

Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

-150 7.

Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

-136 8.

Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

-100 9.

NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

-75

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

-60

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

-50

13. Examination review results discussed between the NRC and the facility licensee (B.14).

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

-7

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Form 2.3-1 Examination Outline Quality Checklist Facility:6XUU\

Date of Examination:2FW

Item Task Description (Y)es / (N)o a

b*

c#

WRITTEN

a. The outline was systematically and randomly prepared in accordance with the instructions in Section B of ES-4.1, and all knowledge and ability (K/A) categories are appropriately sampled.

Y Y

b. The outline does not overemphasize any systems, evolutions, or generic topics.

Y Y

c. Justifications for deselected or rejected K/A statements are acceptable.

SIMULATOR

a. Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenario set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major transients.
b. There are enough scenarios (and spares) for the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity. Ensure that scenarios will not be repeated on subsequent days.

c.

Ensure that all scenarios are new or significantly modified in accordance with ES-3.4 and that no scenarios are duplicated from the applicants audit test(s).

d. To the extent possible, assess whether the outline(s) conforms with the qualitative and quantitative simulator set criteria specified on Form 2.3-2.

JPMS a.

Verify that the administrative outline meets the criteria specified in the instructions on Form 3.2-1 and that no tasks are duplicated from the applicants audit test(s).

b.

Verify that the control room and in-plant systems outline meets the criteria specified in the instructions on Form 3.2-2 and that no tasks are duplicated from the applicants audit test(s).

c. Determine whether the number of job performance measures (JPMs) and JPM types is sufficient for the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.

GENERAL

a. Assess whether the appropriate exam sections cover plant-specific priorities (including probabilistic risk assessment and individual plant examination insights).
b. Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is appropriate.

Y Y

c. Check whether K/A importance ratings (except for plant-specific priorities) are greater than or equal to 2.5.

Y Y

d. Check for duplication and overlap across the exam and with the last two NRC exams.
e. Check the entire exam for balance of coverage.
f. Assess whether the exam fits the appropriate job level (reactor operator or senior reactor operator).

Y Y

Printed Name/Signature Date

a. Author
b. Facility Reviewer (*)
c. NRC Reviewer (#)

NRC Chief Examiner NRC Supervisor

  • The facility licensee signature is not applicable for NRC-developed tests.
  1. An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develop the outline under review.

Jason Bundy N/A, NRC provided sample plan Jason Bundy Matt Endress Mark Bates 10/7/2024 10/7/2024 10/7/2024 MARK BATES Digitally signed by MARK BATES Date: 2024.10.08 12:47:36 -04'00' MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2024.10.08 21:17:48 -04'00'

y y

y y

y y

y y

y y

J. Bundy 9/29/25 J. Bundy J. Bundy 9/29/25 y

y y

y y

y y

y y

y y

y y

y y

MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2025.09.30 22:17:04 -04'00'

y y

NA y

y y

y y

y y

y J. Bundy J. Bundy 9/29/25 9/29/25 MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2025.09.30 22:17:53 -04'00'

y y

y y

y y

y y

y y

y J. Bundy J. Bundy 9/29/25 9/29/25 MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2025.09.30 22:18:37 -04'00'

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility:

Dates of Examination:

Activity Description Complete 1.

  • Received postexamination package from facility licensee and verified complete. (ES-4.4) 2.
  • Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 3.
  • Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 4.

  • Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 5.

Completed licensing official review.

6.

Mailed licenses, preliminary results, and pass letters.

7.

Notified facility licensee of results.

8.

Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

9.

Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

Surry Oct 25 JDB JDB JDB JDB JDB JDB JDB JDB N/A JDB