ML26048A397

From kanterella
Jump to navigation Jump to search
Document Request for Sequoyah - Radiation Protection Inspection - Report Number 2026-02
ML26048A397
Person / Time
Site: Sequoyah  
Issue date: 02/13/2026
From: Adam Nielsen
NRC/RGN-II/DFRSS/RSB
To: Mcneil A
Tennessee Valley Authority
References
IR 2026002
Download: ML26048A397 (0)


Text

From:

Adam Nielsen To:

McNeil, Andrew Clair Cc:

McAdoo, Joseph Harold; Jack Bell

Subject:

Sequoyah RP inspection (4/6 - 4/10) document request Date:

Friday, February 13, 2026 10:25:00 AM Attachments:

SEQ_2026-02_RP_Doc_Request.pdf Please see the attached document request for our upcoming radiation protection inspection scheduled for April 6 - 10, 2026.

We would like to have the documents available to us by March 27, 2026. However, if you run into difficulty and need more time for certain items, just let us know and we can work with you.

Please call or email me if you have any questions.

Thanks, Adam Nielsen Senior Health Physicist US NRC Region II (404) 997-4660

Sequoyah Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2026002 During the week of April 6 - 10, 2026, the NRC will perform a baseline radiation safety inspection and a follow-up inspection for Notice of Violation EAF-RII-2025-0138 at Sequoyah Nuclear Plant (NRC Inspection Procedures 71124.05 and 92702).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than March 27, 2026.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT This letter contains voluntary information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). The burden to the public for these information collections is estimated to average 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) OMB, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List Inspection Dates:

April 6 - 10, 2026 Documents Due to Region II:

March 27, 2026 Inspection Procedures:

IP 71124.05 Radiation Monitoring Instrumentation IP 92702 Follow-Up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, and Orders Lead Inspector:

Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660 Adam.Nielsen@nrc.gov Note: The current version of these documents is expected unless specified otherwise. Please organize the information as it is arranged below to the extent possible. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector or RSB Branch Chief.

Miscellaneous

1. List of primary contacts for each inspection area w/phone numbers
2. Offsite Dose Calculation Manual (ODCM)
3. Most recent 10 CFR 61 analysis for the Dry Active Waste (DAW) waste stream 71124.05 - Radiation Monitoring Instrumentation
1. Procedures for:

a) calibration and source checks of portable radiation detection instruments b) calibration and source checks of small article monitor, personnel contamination monitor, portal monitor, whole body counting equipment, and continuous air monitors c)

QA program for count room instruments

2. The most recent calibration record for each of the following in-plant instruments:

a)

U2 Containment High Range Area Monitor, 2-RE-90-271 b)

U2 Shield Building Vent Normal Range Noble Gas, 2-RE-90-400 c)

U2 Shield Building Vent Flow Monitor d)

U2 Sample Room Area Radiation Monitor, 2-RE-90-7

3. Radioactive source paperwork for the sources used to calibrate the instruments in Item 2
4. The most recent in-place HEPA filter tests and charcoal tests performed on the Unit 2 Emergency Gas Treatment System (EGTS), Train A, as specified in TS 5.5.9 items a, b, and
c.
5. List of ID numbers for the following instruments:

a)

All Portal Monitors located at main RCA exit b)

All Small Article Monitors located at main RCA exit c)

All Whole body contamination monitors (ARGOS or equivalent) at main RCA exit

6. List of ID numbers for the Whole Body Counters used by Dosimetry
7. List of ID numbers for the gamma spectroscopy detectors in the count room
8. List of ID numbers for the liquid scintillation detectors in the count room
9. Most recent audit or self-assessment covering RP and count room instruments (portables, RCA exit point, WBC, count room).
10. List of CRs generated since April 27, 2024 related to portable instruments, area monitors, effluent monitors, CAMs, RCA release point monitors, WBCs, and count room instruments IP 92702 - Follow-Up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, and Orders The documents requested below are related to Enforcement Action EAF-RII-2025-0138 (Notice of Violation - Failure to Implement Radiological Controls During Removal of Contaminated Items from the Unit 1 Steam Generator Platforms)
1. All relevant CRs
2. Comprehensive list of corrective actions, with status of each
3. Causal analyses (if any)
4. Copies of procedures that received changes (if any)
5. Copies of training curricula that received changes (if any)
6. All briefings, training sessions, coaching sessions, etc. that may have been documented