ML26045A146

From kanterella
Jump to navigation Jump to search
Project Long Mott Docs - (External_Sender) X-energy LIC-116 Readiness Assessment Scope Update
ML26045A146
Person / Time
Site: 05000614
Issue date: 09/16/2024
From:
- No Known Affiliation
To:
NRC/NRR/DANU
References
+reviewed
Download: ML26045A146 (0)


Text

From:

ext_Jessica_Maddocks Sent:

Monday, September 16, 2024 10:19 AM To:

Adrian Muniz Cc:

Ondra Dukes; James Fogarty; Stephen Vaughn

Subject:

[External_Sender] X-energy LIC-116 Readiness Assessment Scope Update

Adrian, This email is to alert the NRC that X-energy has removed Sections of the PSAR previously within the scope of the LIC-116 readiness assessment from the scope. A revised table of PSAR Sections within the scope is included below. A revised LIC-116 Readiness assessment road map has been provided in the electronic reading room.

PSAR Section Number PSAR Section Title Electronic Read Room Title 3.2 (Previously Section 3.1.2)

Licensing Basis Event Summary and Evaluation Methodology New Section 3.2 - SOF Portion.pdf 3.7 Civil and Structural Analysis Methodology PSAR_3.7_Civil_Structural_Analysis.pdf 6.4.1 Reactor Building (RB)

PSAR_6.4.1_Reactor_Building.pdf 6.4.11 Reactor Cavity Cooling System (RCCS) 6.4.11 RCCS LIC-116.pdf 7.3.1 Civil Structures (CS)

PSAR 7.3.1 Shield Structure Sample.pdf 7.3.10 Nuclear Island Cooling Water (NICW)

PSAR Section 7.3.10 - Nuclear Island Cooling Water System (NICW).pdf 8.1 Quality Assurance Program PSAR Section 8.1 (QA) Focused LIC 116.pdf 8.5 Environmental Qualification Program PSAR Section 8.5 (EQ) Focused LIC-116.pdf 10.3 Radiation Protection Design Features No. 136, Chapter 10.pdf Jessica Maddocks Licensing Project Manager jmaddocks@x-energy.com This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately and delete this message immediately. Thank you. X Energy, LLC

Hearing Identifier:

XeDOW_ProjectLongMott_SafPublic Email Number:

147 Mail Envelope Properties (PH3P110MB22478EDD1E34D56C857BD2F99060A)

Subject:

[External_Sender] X-energy LIC-116 Readiness Assessment Scope Update Sent Date:

9/16/2024 10:19:16 AM Received Date:

9/16/2024 10:19:44 AM From:

ext_Jessica_Maddocks Created By:

/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=BB0743AD17B046F39958AF4A985C5297-8AC523D3-F8 Recipients:

"Ondra Dukes" <Ondra.Dukes@nrc.gov>

Tracking Status: None "James Fogarty" <jfogarty@x-energy.com>

Tracking Status: None "Stephen Vaughn" <svaughn@x-energy.com>

Tracking Status: None "Adrian Muniz" <Adrian.Muniz@nrc.gov>

Tracking Status: None Post Office:

PH3P110MB2247.NAMP110.PROD.OUTLOOK.COM Files Size Date & Time MESSAGE 1946 9/16/2024 10:19:44 AM image001.png 3997 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: