ML26035A283 CRANE CLEAN ENERGY CENTER/THREE MILE ISLAND UNIT 1 RESTART SECURITY INSPECTION PLAN Inspection Team:
Ken Hussar - Team Lead Chad Davis Jeff Bream (NSIR/DSO/SOSB)
Inspection Procedures:
81000.01 Access Authorization 81000.06 Protection of Safeguards Information 81000.08 Fitness-for-Duty Program Inspection Dates:
February 9-16, 2026 Licensee POC:
Dan Kenny - Senior Manager, Security Inspection Objectives:
81000.01 Access Authorization (32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />)
To verify that the licensee has developed and is implementing, or is prepared to implement, its Access Authorization (AA) program in accordance with the U.S. Nuclear Regulatory Commission (NRC)-approved security plans.
To verify that the licensee has developed and is implementing, or is prepared to implement, measures to ensure that its AA program provides assurance that individuals granted unescorted access are trustworthy, reliable, and do not constitute an unreasonable risk to public health and safety or the common defense and security.
To verify that the licensee has developed and is implementing, or is prepared to implement, measures to ensure that the behavioral observation provisions of the licensees AA program provides assurance of continued reliability and trustworthiness of personnel with unescorted access.
To verify and assess that the licensee has developed and is implementing, or is prepared to implement, provisions of the insider mitigation program that are effective in mitigating the active insider and active violent insider.
To verify that the licensees physical protection program associated with this sample is designed and implemented, or is prepared to implement, to meet the general performance objective of Title 10 of the Code of Federal Regulations (10 CFR) 73.55(b).
81000.06 Protection of Safeguards Information (10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />)
To determine if the licensees information protection system effectively protects safeguards information (SGI), as defined in 10 CFR 73.21 and 10 CFR 73.22 and prevents unauthorized disclosure.
To verify that the licensees physical protection program associated with this sample is designed and implemented to meet the general performance objective of 10 CFR 73.55(b).
81000.08 Fitness-for-Duty Program (33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />)
To verify that the licensee has developed and is properly implementing or is prepared to implement Fitness-for-Duty (FFD) requirements under 10 CFR Part 26 (Subparts A through H, N, and O), and any other applicable requirement that assures licensee personnel (including contractors and vendors) will perform their tasks in a reliable and trustworthy manner and are not under the influence of any substance or mentally or physically impaired from any cause that may affect their abilities to perform their duties safely and competently.
To verify that changes to the licensees FFD program made since the last inspection: (a) meet commitments to resolve previously identified issues or NRC requirements under 10 CFR Part 26; and (b) do not adversely affect the performance requirements as prescribed by regulatory requirements and any other applicable requirements.
To verify that the licensee has developed and is properly implementing or is prepared to implement FFD requirements pertaining to fatigue management under Subpart I of 10 CFR Part 26 and any other applicable NRC requirements to ensure, in part, that nuclear facility security force personnel are not assigned to duty while in a fatigued condition that could reduce their alertness or ability to perform functions necessary to identify and promptly respond to plant security threats.
To verify that the licensee has developed and is properly implementing or is prepared to implement the physical protection program associated with this sample and the program is designed and implemented to meet the general performance objective of 10 CFR 73.55(b).
Prepared By:
K. Hussar, Senior Physical Security Inspector, RI Approved By:
B. Bickett, Chief, SEPIR, RI E. Carfang, Lead, Crane/TMI Unit 1 Restart Team, RI KENNETH HUSSAR Digitally signed by KENNETH HUSSAR Date: 2026.02.04 13:09:56 -05'00' BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2026.02.05 06:19:16 -05'00' ERIN CARFANG Digitally signed by ERIN CARFANG Date: 2026.02.05 07:13:03 -05'00'