(PBAPS) Unit 3, Submittal of the Inservice Inspection (ISI) Owners Activity Report (OAR) for the 25th Refueling Outage for Unit 3
ML26029A005
Person / Time
Site: Peach Bottom 
Issue date: 01/29/2026
From: Frain A
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML26029A004 List:
References
CCN: 26-06
Download: ML26029A005 (0)


Text

CCN: 26-06 10CFR 50.55a January 29, 2026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 3 Subsequent Renewed Facility Operating License No. DPR-56 NRC Docket No. 50-278

Subject:

Submittal of the lnservice Inspection (ISI) Owner's Activity Report (OAR) for the 25th Refueling Outage for Unit 3 Attached is the ISI Owner's Activity Report for the 25th refueling cycle covering ISI activities associated with the third period of the 5th ISI inspection interval for Unit 3. This report is submitted in accordance with 10CFR 50.55a(b)(2)(xxxii); ASME Section XI, Article IWA-6200; and ASME Code Case N-532-5.

If you have any questions or require additional information, please contact Marcellus Ruff at 717-456-3488.

Sincerely, Adam Frain Plant Manager Peach Bottom Atomic Power Station Attachment cc:

USNRC, Regional Administrator, Region 1 USNRC, Senior Resident Inspector, PBAPS W. DeHaas, Commonwealth of Pennsylvania S. Seaman, State of Maryland B. Watkins, PSEG

Frain, Adam J Digitally signed by Frain, Adam J Date: 2026.01.26 09:05:31 -05'00'