Constellation 7
Peter F. Moodie Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cllffs Parkway Lusby. MD 20657 410*495*5200 Office 603-548* 7775 Mobile www constellation com peter.moodie1a.constellat1on.com 10 CFR 50.90 January 26, 2026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License No. DPR-69 NRC Docket No. 50-318 Request for Additional Information Regarding the Calvert Cliffs Unit 2 Steam Generator Tube Inspection Report
References:
- 1.
Letter from Larry D. Smith ((Constellation Energy Generation, LLC} to U.S.
Nuclear Regulatory Commission, "Spring 2025 -180 Day Steam Generator Report", dated September 8, 2025 (ADAMS Accession No. ML25251A026)
- 2.
Email from S. Bina (U.S. Nuclear Regulatory Commission) to W. Para (Constellation Energy Generation, LLC), Docket 50-318 (ADAMS Accession No. ML25349A096) - Request for Additional Information, dated December 15, 2025 (ADAMS Accession No. ML25349A095)
In Reference 1, Constellation Energy Generation, LLC (CEG) submitted the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 2, spring 2025 Steam Generator (SG) tube inspection report. The SG tube inspections were performed at CCNPP, Unit 2, during refueling outage 26 (CC2R26).
In Reference 2, the NRC requested additional information that is needed to complete its review of the Calvert Cliffs Unit 2 SG Tube Inspection Reports submitted with Reference 1. The information is requested within 30 days of the date of issuance of Reference 2 (i.e., by January 31, 2026). The Attachment provides the requested information.
Document Control Desk January 26, 2026 Page 2 There are no regulatory commitments included in this letter. Should you have any questions concerning this report, please contact Mr. Larry Smith, Regulatory Assurance Manager, at (667) 313-6503.
Respectfully,
~~
f Peter F. Moodie Site Vice President PFM/LDS/jj
Attachment:
Response to Request for Additional Information cc:
NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Senior Resident Inspector, Calvert Cliffs Z. Barthel, MD-DNR