Interim Report of a Deviation or Failure to Comply Associated with General Electric Hma Type Auxiliary Relay, Model 12HMA124A2, Part Number DA137C6164P001
ML26022A344
Person / Time
Site: FitzPatrick 
Issue date: 01/22/2026
From: Alexander Sterio
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
AFP-26-0006
Download: ML26022A344 (0)


Text

Constellation.

JAFP-26-0006 January 22, 2026 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 James A FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333 James A. FitzPatrick NPP P.O. Box 110 Lycoming. NY 13093 Alexander Sterio Site Vice President - JAF

Subject:

Interim Report of a Deviation or Failure to Comply Associated with General Electric HMA Type Auxiliary Relay, Model 12HMA124A2, Part Number DA137C6164P001 In accordance with the requirements of 10 CFR 21.21 (a)(2), James A. FitzPatrick Nuclear Power Plant (JAF) is submitting this interim report for General Electric (GE) HMA Type auxiliary relays, model 12HMA 124A2, part number DA 137C6164P001.

A sample of HMA Type auxiliary relays was sent to Powerlabs for Parts Quality Initiative (PQI) testing. The results were reviewed by JAF on November 25, 2025, and a deviation in two relay components was discovered. Testing identified in one component a failure of contact 8-4 to close and in the other component the contact 8-4 functioned inconsistently.

The effect of this deviation is a failure of the relay to change states when de-energized.

The cause of the deviation is under investigation, and the results will be incorporated into the evaluation required by 10 CFR 21.21(a)(1). This is expected to be completed by April 10, 2026.

There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Mark Hawes, Regulatory Assurance, at (315) 349-6659.